HomeMy WebLinkAbout20080528 Ver 1_Approval Letter_20080515\1q A
O"ZZ" CF;o 9 pG
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
May 15, 2008
DWQ Project # 08-0528
Burke County
NC Division of Parks & Recreation
South Mountains State Park
Attn: Mr. Jonathan Griffith
3001 South Mountains State Park Ave.
Connelly Springs, NC 28612
Subject Property: Saddleback Horse Trail Connector
Jacob Fork River [030835, 11-129-2(1), WS-III, Tr, ORW]
Approval of 401 Water Quality Certification and Authorization Certificate with Additional
Conditions
Dear Mr. Griffith:
You have our approval, in accordance with the attached conditions and those listed below, to place fill
within or otherwise impact 0.02 acres of 404/wetland and 56 linear feet of perennial stream, as described
in your application dated February 26, 2008, and received by the Division of Water Quality (DWQ) on
March 20, 2008 to construct the equestrian trail at the site. After reviewing your application, we have
decided that the impacts are covered by General Water Quality Certification Number(s) 3705 (GC3705).
The Certification(s) allows you to use Nationwide Permit(s) 42 (NW42) when issued by the US Army
Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other
required federal, state or local permits before you go ahead with your project including (but not limited
to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed with
your proposed impacts or to conduct impacts to waters as depicted in your application shall expire
upon expiration of the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change your
project, you must notify us and you may be required to send us a new application. If the property is sold,
the new owner must be given a copy of this Certification and approval letter and is thereby responsible for
complying with all conditions. If total fills for this project (now or in the future) exceed one acre of
wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A
NCAC 2H.0506 (h). This approval requires you to follow the conditions listed in the attached
certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncwetiands
None Carolina
Naturally
An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper
South Mountains State Park
Page 2 of 4
May 15, 2008
Type of Impact Amount Approved Units Plan Location or Reference
404/Wetlands 0.02 acres PCN page 8 of 13
Stream - perennial 56 (linear feet) PCN a e 9 of 13
Stream - intermittent 0 linear feet PCN a e 8 of 13
2. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond
the footprint of the impacts depicted in the Pre-Construction Notification. All construction
activities, including the design, installation, operation, and maintenance of sediment and erosion
control Best Management Practices, shall be performed so that no violations of state water quality
standards, statutes, or rules occur.
3. Erosion and sediment control practices must be in full compliance with all specifications governing
the proper design, installation and operation and maintenance of such Best Management Practices in
order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control measures and
stormwater routing and treatment shall be on site at all times.
4. Sediment and Erosion Control Measures
Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum
extent practicable. If placement of sediment and erosion control devices in wetlands and waters is
unavoidable, they shall be removed and the natural grade restored within six months of the date that
the Division of Land Resources has released the project.
5. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within these
boundaries approved under this authorization shall be clearly marked with orange warning fencing
(or similar high visibility material) for the areas that have been approved to infringe within the
buffer, wetland or water prior, to any land disturbing activities to ensure compliance with GC3705.
6. Burke County Catawba Buffer Ordinance
The proposed project must comply with the Burke County local riparian buffer ordinance
approved by the Division of Water Quality under the Catawba River Basin: Protection and
Maintenance of Existing Riparian Buffers, 15A NCAC 02B.0243(b).
7. Trout Moratorium
The stream is an Outstanding Resource Water, Trout Water. In order to protect
downstream uses for Trout Waters a requirement of this Certification is that any
additional work conducted within the stream may not occur between the dates of October
15 through April 15.
South Mountains State Park
Page 3 of 4
May 15, 2008
Turbidity Standard
The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be
exceeded as described in 15A NCAC 213 .0211. Appropriate sediment and erosion
control practices must be used to meet this standard.
9. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules, and any subsequent modifications, the applicant is required to return the attached
certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina
Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650.
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct
impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon
expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved wetland or
stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that
you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of
the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a
hearing.
Any disputes over determinations regarding this Authorization Certificate (associated with the approved
buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is
subject to review as provided in Articles 3 and 4 of G.S. 150B.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act. If you have any questions, please telephone Cyndi Karoly or Ian McMillan at 919-7 -1786.
Si rely,
Coleen H. Sullins
CHS/cbk/lem
Enclosures: GC3705
Certificate of Completion
cc: USACE Asheville Regulatory Field Office
Kevin Barnette, DWQ Asheville Regional Office
DLR Asheville Regional Office
File Copy
Central Files
Filename: 080528 Sadd IebackHorseTrai (Conn ector(Wak e)t01