Loading...
HomeMy WebLinkAbout20080528 Ver 1_Approval Letter_20080515\1q A O"ZZ" CF;o 9 pG Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality May 15, 2008 DWQ Project # 08-0528 Burke County NC Division of Parks & Recreation South Mountains State Park Attn: Mr. Jonathan Griffith 3001 South Mountains State Park Ave. Connelly Springs, NC 28612 Subject Property: Saddleback Horse Trail Connector Jacob Fork River [030835, 11-129-2(1), WS-III, Tr, ORW] Approval of 401 Water Quality Certification and Authorization Certificate with Additional Conditions Dear Mr. Griffith: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.02 acres of 404/wetland and 56 linear feet of perennial stream, as described in your application dated February 26, 2008, and received by the Division of Water Quality (DWQ) on March 20, 2008 to construct the equestrian trail at the site. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3705 (GC3705). The Certification(s) allows you to use Nationwide Permit(s) 42 (NW42) when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncwetiands None Carolina Naturally An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper South Mountains State Park Page 2 of 4 May 15, 2008 Type of Impact Amount Approved Units Plan Location or Reference 404/Wetlands 0.02 acres PCN page 8 of 13 Stream - perennial 56 (linear feet) PCN a e 9 of 13 Stream - intermittent 0 linear feet PCN a e 8 of 13 2. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 3. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 4. Sediment and Erosion Control Measures Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior, to any land disturbing activities to ensure compliance with GC3705. 6. Burke County Catawba Buffer Ordinance The proposed project must comply with the Burke County local riparian buffer ordinance approved by the Division of Water Quality under the Catawba River Basin: Protection and Maintenance of Existing Riparian Buffers, 15A NCAC 02B.0243(b). 7. Trout Moratorium The stream is an Outstanding Resource Water, Trout Water. In order to protect downstream uses for Trout Waters a requirement of this Certification is that any additional work conducted within the stream may not occur between the dates of October 15 through April 15. South Mountains State Park Page 3 of 4 May 15, 2008 Turbidity Standard The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15A NCAC 213 .0211. Appropriate sediment and erosion control practices must be used to meet this standard. 9. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly or Ian McMillan at 919-7 -1786. Si rely, Coleen H. Sullins CHS/cbk/lem Enclosures: GC3705 Certificate of Completion cc: USACE Asheville Regulatory Field Office Kevin Barnette, DWQ Asheville Regional Office DLR Asheville Regional Office File Copy Central Files Filename: 080528 Sadd IebackHorseTrai (Conn ector(Wak e)t01