Loading...
HomeMy WebLinkAbout20080574 Ver 1_Triage Check List_20080416Triage Check List Date: A Ili /Z)D Project Name: FILE COPY To: ARO Kevin Barnett ? FRO Ken Averitte ? MRO Alan Johnson From: ax-,- t /? ?/ ? DWQ#: ? RRO LaurD?L herspoon County: alp ? WaRO Kyle Barnes ? WiRO Joanne Steenhuis/Chad Coburn ? WSRO Sue Homewood Telephone : (919) E V The file attached is being forwarded to your for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination ? Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill ? Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy ? Is the application consistent with pre-application meetings? ? Cumulative impact concern Comments: