Loading...
HomeMy WebLinkAbout20010944 Ver 3_Staff Comments_20080514Project Name: River's Edge Apartments County: Cumberland DWQ Project #: 01-09440 Date: 5/14/08 Stormwater Review Please note that the stormwater management plans submitted with your 401 application received on April 22, 2008 have been reviewed but not yet approved due to the following reasons: 1. The elevations and design of the BMPs and associated components must be based on the final grading contours, drainage patterns, land cover and associated impervious percentages, but not on the assumptions made that are likely to change. In addition, the final approved stormwater plans shall be required When the final grading plans have been finalized, please resubmit the following: a. Two (2) copies of full size plans for the entire site on a scale 1 ":50' or larger. The site plans must show existing site conditions and final grading contours, all building envelopes, roads, streets, utility features, club houses (if any), wetlands and streams and associated impacts, etc. b. Two (2) copies of final plan details and section views of each BMP (I" : 30' or larger) showing the pretreatment system, various zones in the main treatment systems, high flow bypass system or overflow devices, under drain pipes and clean-out pipes, inlet and outlet pipes, inlet and outlet velocity calculations, outlet protection design information, soil media specifications (composition, permeability, P-Index), planting plans, maintenance access, construction sequence, fertilizer application requirements for vegetation establishment, etc. c. Please pay particular attention to the following: The spacing between the collection laterals of the underdrain system shall not be greater than l Ofeet, and the number of clean-out pipes required is one per every 1000 square feet of BMP surface area at a minimum. d. Please indicate whether the outlet pipes from the Bioretention cells discharge above or below the normal water levels of the receiving streams. If they are unsubmerged, stream bank protection may be required based on the exit velocities of the 10-year storm. e. Please note that stormwater runoff from entire project site must be treated prior to leaving the site. Please provide treatment for the northern portions of the project area that are not being treated