HomeMy WebLinkAbout20071194 Ver 2_Stormwater Info_20080513LandDesign..
urban design planning civil engineering branding landscape architecture
May 8, 2008
Ms. Annette Lucas, Environmental Engineer III
Division of Water Quality
401 Oversight/ Express Review Permitting Unit
1650 Mail Service Center
Raleigh, NC 27604
RE: The Birches at Wildcat Cliffs
Request for More Information dated May 1, 2008
DWQ Project #07-1194v2
LDI Project No.: 6007075
Dear Ms. Lucas,
Enclosed is a response to the comments listed in the Request for More Information dated May 1,
2008 in reference to culvert extension and proposed residential development. We have made all
necessary revisions which are addressed in the following enclosed documents:
• Five copies of plan sheets D1.5 & D1.6 last revised May 7, 2008
• Five copies of an explanatory letter from the soil scientist that performed the
investigation, Steve Melin, LSS
• One copies of a Request for More Information, dated May 1, 2008 & addressed
to Mr. Bill Nellis
The Response to Comments below details how each of the two (2) comments in the Request for
More Information has been addressed (the original Request for More Information May 1, 2008
has been enclosed for reference).
Response to Comments:
1: See attached letter from soil scientist, Steve Melin, LSS. Mr. Melin believes that the
infiltration capacity at all five infiltration basin locations is sufficient at the design rate of
0.52 inches per hour.
2. The details on sheets D1.5 & D1.6 have been revised to show the cut slopes upslope of
the infiltration basins at a 3:1 maximum slope. Please note, the revised sheets were
numbered D1.1 & D1.2 on the set previously submitted. The stormwater plans have been
combined with the erosion control plans, which is why the sheet numbers have changed.
Grove Arcade Building K!
One Page Avenue, Suite 220 MAY 1 3 2008
Asheville, NC 28801
DENR - WP7ER CIi
V: 828.281.1447 WETLANDS AND STORMWATER BRANCH
F 828.281.1449
www.LandDesign.com G:\_2007\6007075\Docs\Correspondence\DWQ\7075-Response to DWQ Request for Information (2) doc
Washington DC
Charlotte NC
Pinehurst NC
Asheville NC
Tampa FL
Nashvi I le TN
Beijing PRC
Should you have any questions or need any additional information please call.
Respectfully Submitted,
LANDDESIGN, INC.
Greg Hoffman, El
Enclosure:
cc: Mr. Bill Nellis, Wildcat Cliffs Country Club, Inc.
File 6007075
Washington DC
Charlotte NC
Pinehurst NC
Asheville NC
Tampa FL
Nashville TN
G1_2007\6007075\Docs\Correspondence\DWQ\7075-Response to DWQ Request for Information (2).doc Beijing PRC
TRANSMITTAL
Grove Arcade Building, One Page Avenue, Suite 220, Asheville, NC 28801
V: 828.281.1447 F: 828.281.1449
DATE: 5/9/2008
PROJECT NAME: 6007075 ON SITE WILDCAT CLIFFS
TO: Annette Lucas PROJECT #: 6007075
Division of Water Quality
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center
Raleigh, NC 27604
annette.lucas@ncmail.net
FROM: Hudson Owen
LandDesign
howen@landdesign.com
cc
WE ARE SENDING: Response to Comments Submittal
VIA: Second Day
PURPOSE: For your use
Quantity Dated Description
1 5/8/2008 Response to Comments Letter
1 5/1/2008 Request for Additional Information Letter
5 5/6/2008 Mountain Soils, Inc. Response to Comments Letter
5 5/7/2008 Full Size copies of Revised D1.5 & D1.6 Sheets
NOTES
If this document was delivered via FAX, the accompanying transmission contains confidential information intended only for the use of the individual of the entity named above. It you are not the intended recipient, you are
hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the contents of this facsimile information is strictly prohibited. If you have received this FAX in error, please immediately notify
us by telephone to arrange for disposition or return of the documents to us.
Asheville NC
Washington DC Tampa FL Asheville NC Pinehurst NC Charlotte NC Nashville TN Beijing PRC
ugti:qqfly;7?
MAY 1 3 2OGt=i
UENR - WATER QUALM
"RANDS AIYD STQRMWAJER 8RA;>r
X-
?OY v + C?jQ micnaei r. rasiey, governor
William G. Ross Jr., Secretary
LLL. _7?? ?U North Carolina Department of Environment and Natural Resources
>
Q C MAY 1 3 2008 Coleen H. Sullins, Director
DENR WATER QUAl Division of Water Quality
? `ay 1, 2008
WETLANDS AND STORMWATER ER BRANrl
DWQ Project # 07-1194v2
Macon County
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Mr. Bill Nellis CEC,project # q5O
Wildcat Cliffs Country Club, Inc.
770 Country Club Drive Date Recieved S 5
Highlands, North Carolina 28741
Subject Property: Wildcat Cliffs Country Club
Cullasaja River / Lake Ravenel [040401, 2-21-(0.5), WS-III Tr]
REQUEST FOR MORE INFORMATION: STORMWATER MANAGEMENT PLAN
Dear Mr. Nellis:
On April 10, 2008, the Division of Water Quality (DWQ) issued a 401 Water Quality Certification to
fill 122 linear feet of perennial stream in order to construct the subject development in Macon
County. In order to meet the requirements of General Certification 3705, a stormwater management
plan, dated March 4, 2008 was received by the DWQ on March 5, 2008. The DWQ has determined
that your stormwater management plan was incomplete as discussed below.
Additional Information Requested:
The soils report states that "the presence of rock and high concentrations of subsurface
stoniness was identified. The presence of highly concentrated rock limits the placement
of trenches and adversely affects the movement of water in the subsoil." This statement
leads the DWQ to believe that this site may not be appropriate for infiltration trenches.
Also, it appears that the soil borings in the vicinity of some of the proposed infiltration
basin number were only able to be advanced to less than 36 inches below the surface,
which could indicate the presence of subsurface rock. Please ask your soil scientist to
make a conclusive statement about whether he believes infiltration is possible at all five
of the proposed infiltration basin locations.
2. If the information requested in Item 1 can be provided, then the cut slopes upslope of the
infiltration basins may not exceed 3:1.
The DWQ will require the above additional information to finalize review of the stormwater
management plan for the subject property. Please provide the following information so that we may
continue to review your project. You are welcome to contact me at 919-715-3425 if you have
questions or would like to set up a meeting.
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 / FAX 919-733-6893 / Internet: ham:: i'h2u.enrstate.nc.us/newetlands
No One
Carolina
Naturally
An Equal Opportunity/Affirmative Action Employer - 50% Recycled110%Post Consumer Paper
i
07-1194v2 Wildcat Ulitts i ouniry uiuo
May 1, 2008
Page 2 of 2
Sincerely,
Annette Lucas, Environmental Engineer III
401 Oversight/Express Review Permitting Unit
AML/aml
Cc: Army Corps of Engineers, Asheville
Kevin Barnett, DWQ.,:.ARO
Central Files
File Copy
Clement Riddle, CEC, 718 Oakland Street, Hendersonville, NC 28791
Filename: 071194v2BirchesatW ildcatCliffs(Macon)_S W_Hold
M S I
MOUNTAIN SOILS, INC.
71 Ledford Drive
Franklin, Nonk Carolina 28 734
w - 5962 9? a o.,p?? ffi e F
(az8) 524 sa4
Fax
(828) 421-3149 ?O
May c, zoos Py N.
,
D?aEP?OS??
?gNOs
Ms. Annette Lucas
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
Re: Wildcat Cliffs Country, Club
DWQ Project # 07-1194v2; Macon County
Dear Ms. Lucas,
This letter is intended to address the additional information requested from a May 1, 2008
letter and to support MSI's (Mountain Soils, Inc.) conclusion that infiltration at all five
infiltration basins is possible at the design rate of 0.52 inches per hour.
The soil materials within the area consist of very deep, well drained, Edneyville soils. Of
the ten auger borings locations, six were able to be advanced to depths greater than 7 to 8
feet (84 - 96 inches) in saprolite with no restrictions.
Saprolite is the name for biogeochemical weathered rock (somewhat similar to soil). It is
mostly soft, friable and commonly retains the structure of the parent rock since it is not
transported, but formed in place. The saprolite encountered at the site was coarse
grained, and friable to very friable. Field measured hydraulic conductivity tests indicate
the saprolite material has a very rapid permeability (in most cases, saprolite at the site
have a more rapid permeability than the actual soil material).
When auger refusal did occur was due to non-contiguous fragmented rock. It was
estimated though auger borings and probing that approximately 10-15% of the subsoil (at
most 25% (conservatively)) consisted of rock material. An additional safety factor
(which is the measured Ksat discounted 25%) was utili7ed in the report to address any
potential influence of rock, although the hydraulic conductivity measurements should
have factored this in the readings.
MS[
MOUNTAIN SOILS, INC.
2
It is our conclusion that the infiltration capacity at all five infiltration basin locations is
sufficient at the design rate of 0.52 inches per hour. Please do not hesitate to contact MSI
if you have any further questions. I hope all is well with you.
Sincerely,
Steve Mclin, LSS
Mountain Soils, Inc
IL S
j.1t1?Cl
d
4 ?.
s
'r
Cc: Greg Hoffman, El
LandDesign
C
~ ~ ~ M
N p S
U °o
Z U
EXISTING SLOPE Q~3.60 ~ ~
8"~ CLEANOUT/ ry 0~ N H
OBSERVATION WELL WITH ATRIUM GRATE AS ~ 0 b ~ Q.
SHOWN ON DETAIL O D ~ Q_ ° NN ~ L N °0 ~k
1 D1 3 / / vu
c _ V U U
D ~ ~'oinu: ova
7 ~ ^ C J 1LJ3,~ ~8 v v ~ c v O ~
~ ~_Oa~ ~ Q u Q v~,0°y, c c
va.~~w
EMERGENCY OVERFLOW BERM > v
L D" 2" x 6" TIMBER LEVE E o > ~ z z
1" ABOVE. GROUND N` NYLOPLAST 30"DOME GRATE
AS LEVEL SPREADER EDGE _
FULL LENGTH OF SWALE QUA 3:1 CUT SLOPE WITH QUALITY: MATERIALS SHALL CONFORM TO ASTM o
FESCUE BLEND SEED, A53i A536 GRADE 70-50-05 ~ ~
IF MAi MATTING TO BE .USED MATERIAL: DUCTILE IRON FRAME & GRATE ,
WINTER INSTALLATION PAID 4 ~ V PAINT: CASTINGS ARE FURNISHED WITH A BLACKo ~ ~ ~ o
Y: ^ '",l , ~ '.3 ~~~f hi.a.. ~.K ~r` )~,i2. '~^~1 ~1 t4 Pf'UI PAINT M ~ U a a U
EXISTING SLOPE ~.r' ,>y: .z ,..h. z:,: , LOC r-~ ~ LOCKING DEVICE AVAILABLE UPON REQUEST o
r.` ~ ter' ~..1. ~ 1,1,..-/t ~ti . ~ ~ ~ u.~,./(b x+{L"I'~j PRICE INCLUDES FRAME & GRATE z N y
t.:/C.Y ~ . v' +C.. mf n~:;i /S? ~ +~;r ~S+t ~ lit •~-J / ~ ` 1< yr +S ~~y~ `d f ~ r ~ ' ~ . F",i iJ k ~..i~ ~,.K f r..,' ~ ti ~ APF r ~ v~~-~jj~ ~ t~ 't~,, ~ t y~<~ ~E,~' APF APPROX. DRAIN AREA = 405.75 5Q. IN. ? ~ a ?
't f~. t L t. l ~ i t ~ f' ~ ~ APPROX. WEIGHT W(THFRAME = LBS. M cfl
~ 1. ~ E;. .ti ~ .,l' ~ ~ ?~~,,1 ;j~~v,,M1_ tG F t 4 tC~ ~ ,,».lC. ~ r ~ zl ~ '?t ` j,. ~3a,~ °
36"~ HPDE PIPE WITH 1
~ 1 ~.~'.J ~ ~ ~ ~ ~ + , , , , ~ z cv ~ ; 1 , ef: PERFORATED HOLES. PIPE f~,, ~ ~t'~ ~ ' ~ TO BE WRAP DUCTILE IRON `
-"I PED IN NON-WOVEN GEOTXT. _:t`~~',~': ~ ~ , NON-WOVEN GEOTXT. FILTER FRAME AND ;~p4•'o r :
FILTER :FABRIC ~ r ~ FABRIC. GRATE ' ~ SEAL
INLET AND OUTLET ~ ~g 17 ~ . 1
r ~f 1 ADAPTERS VARIABLE ~
VARIABLE AVAILABLE ~ '%~~p'••FNC~ E~~`''Gp,~`
~t ~.I 4"THRU30" INVERT OVERALL *(1)ADAPTERSCANBE;;, ~°'~f,~;,~~A~„~~~,
" ~ a . .;r- ~ 57 ROUND ~ ~ yC ~ fete. F' t ^;f HEIGH HEIGHT (2) MOUNTED ON ANY
, r WASHED STONE VARIOUS TYPES OF ANGLE 0° TO 359°. TO
~ I f J s <I . f ~ L i ry~ a 1 i OUTLETS WITH DETERMINE MINIMUM
~ \ ^f t` ~ 'off < , r~-.r.~F:",. ~ t:S.a, ; ~ ~k ~ ~?<..~1 WATERTIGHT ADAPTERS ~ *(2)MAXIMUM ANGLE BETWEEN
' FOR: ~ RECOMMENDED ADAPTERS SEE
.,i, ADS N-12 d' Z OVERALL DRAWING N0.
4 SAND SDR-35 SEWER HEIGHT 10' 7001.110-014.
4' SCHEDULE 40 DWV r-
CORRUGATED PVC ALL 30"DRAIN BASINS
RIBBED PVC SHALL HAUE STRAINER
BASKETS INSTALLED LL
PER DETAIL 2(D1.5 V..
2 ST 30~ DRAiN BASIN DETAIL NYL4PLA
D1.1 N.T.S. U U
D1.1 ~ ~ ~
Q•
U z
A A ~
J 0 U
TOPOF COVER z
»R ~ U
B B J U
~
Q ~
Q E"" ~
tJ~ W
~ Z
W~ Z
_w ~
PLAN OF FRAME
U~ o
BOTTOM OF COVER ' _ " „ 2 1~ ® aC Q
1 R. ~ o
1' - 11 » 00 z
~~r~ ~
PLf1N OF COVER 1'-10~»
~rvos~`~ W ~
> » TYPE 1 - # 1`"~,. F- cn I
1 11 ~ ~ 1
cuT TYPI( CUT SLOPE 2.1~~•`~-- ads Z TYPICALL MAX.. C/L o ;
CUT CUT 1 1/2:1. ~ c o
MINIMUM WEIGHTS - LBS. U ~ O
FRAME - 180 'i00 _ PERMANENT 4' 18' PAVE ENT WIDTH 4'
N ~ COVER 120 ~ ALTERNATE SEEDING TYP. TOTAL - 300 z 0 0 ...1 F
M ~ Q
SPECIFICATION
ASS 30 IRON MEETING 4 2' - 0 " Cl Foes 1•' Per ~ ~ z 1" pet ~ a a
A-48 ASTM 0 U RIP RAP o
2'-9 » 3 ~ SEE PLANS F( PLANS FOR PLUNGE POOL o a SEE ~ ~ w
DITCH LOCATI( DITCH LOCATION ~ ~ > ~
4 SECTION A - A ~kj~ . ~ ~
CROSS SECTION ~ `-.,~~3g t mad p o ~ x
1' - 10 " 1.5" SUPERPAVE WEARING COURSE e rn ~ ° v
IED. PERMANENT TOPOF COVER SHOWN PERFORATED. PERFORATED AVAILABLE IF SPECIE sEEDINC TYP. PERMANENT j 00 h w SEEDING TYP. I 2" BINDER COURSE ~ M N ~
SECTION B - B STATE USE OF SYSTEM ON COVER WITH JUTE MAT W{TH JUTE MAT 6" CABC GRAVEL BASE
I.E.: SEWER STORM DRAIN, ELECTRICAL 2 WHERE NOTED ( ~ ) TYPE # WHERE N07ED TOP 8' OF SUBGRADE SHOULD BE COMPACTED TO MIN 100% STANDARD PROCTOR DENSITY:
ALL FILL EMBANKMENTS SHOULD BE BOUGHT UP IN EVEN
10" LIFTS AND COMPACTED TO 95% ALL ROAD CONSTRUCTION TO BE IN ACCORDANCE WITH
NCDOT SPECIFICATIONS , n O O c
4 TYPICAL ROAD CROSS SECTION m
3 NHOLE FRAME AND COI/ER DETA/L
D1.1 16' PAVEMENT WIDTH FOR JACOB LANE N.7.S. Uj Z LU z LU 0: W
D1.1 NOT TO ac" Know what's below. Q d o w
Call before you dig. Q A 4 v au o
ADVANEDGE SILT BARRIER M
a ~ RING WITH GEOTEX 117E N a O
a Z
FILTER J W
~ - N 0` N u~i
t'CiI ~ O~ N Q- a u
18"-30" 2'X2'OF 30",2'X2'OR2'X3'FRAMEAND ~ °N ~ L
o '
GRATE rE ~ N v
30"LONG - 30" LONG STAKES - 4 PLACES 7 ~ ~ C J f"
USE CAU' . EXISTING SLOPE FUSE CAUTION WHEN jam' ~ , ~ > ~ 'a ~
INSTALLIN INSTALLING STAKES TO , , i ' ~ ~ _ , ' ~ ~ ~ ° ~ N
PREVENT PREVENT DAMAGE TO ~ I ~ ; ~ ~ ~ W
UNDERGROUND PIPES} oPEN THRaAT 3 I F..~ ~ o > ~ ~ ~
8"~ CLEANOUT N UNDERGR / ~ OBSERVATION WELL WITH 1$ - 30 DRAIN E
ATRIUM GRATE AS - 30"DRAIN BASIN sIDES MIN. I
STRUCTURE SHOWN ON DETAIL 1/D1.3 ~UCTURE
i~ FIELD FABRICATE W/ 8" Q o ~ o
BLOCK, FILL CELLS SOLID. I a II ~ ;
MIN. DIMENSION = 36"x 36". I ~ L
INCLUDE STEPS ON 16" a o a a U VERTICAL CENTERS. ~ ~ I ~ - , u ~
L ~ w w
3:1 CUT SLOPE WITH N ~ ~ , ` o
EMERGENCY OVERFLOW BERM FESCUE BLEND SEED. „ n "LEVELED" 2» x 6" TIMBER TO BE US D IF 4 •30 ADAPT • 30"ADAPTERS q ~ ~~Yp~ ~ ~ z ~ W
MATTING E 1 ABOVE GROUND WINTER INSTALLATION
AS LEVEL SPREADER EDGE 36"~ HPDE PIPE WITH 1" .OCCURS. aoo?
FULL LENGTH OF SWALE PERFORATED HOLES. PIPE
To BE wRAPPED IN REFER TO THE GE( TO THE GEOTEX 117E PRODUCT sEE PLAN FOR PIPE slzES.
/ NON-WOVEN GEOTXT. FILTER DATA SHEET FOR ~ SHEET FOR ADDITIONAL `
FABRIC.
INFORMATION 4 r NATION 8 THICK FOUNDATION SLAB. ;`0~' ~ N9.f 3000 PSI CONCRETE.
t ,:.-~.~4'^"~ y.:".„~ - ~ 1 ~ p 1,. .r lY\ ~ .}~c~ p ..1 1 ti a„",2```'~ r~ A n,, ki / i{ 1 i«?LYS.?\•-:/~,...r` );,..-rc '.{a `_w. ..1 Il ?~L>~1 r~,,.. ~,~....•r~ )y.~. .7k 11 - SEAL
r l ~;y' ~ , ` Y~~ f 5 ?r /a'~~J ? $ r 1 ~Ti r. ,t,P'" 44 `s'Y 176
{ Z.:~ \,.r( r f~J%r\J,.?.:?~-..i~ Jf ?r~,,,?„lS „r~ 7 t\?1 fL;M < 1. .-~Lw ~Ji ?C. C.?},",JL i? l ? k ~ Y' ~i i / / ~ ~i. ~ 11 kti a n. ~ ~ ~ \ ~ .i L. ~ n , t,,.. ~ e x t
~ ~ ~ 1 Tr `Cr r / ~ . r/ fl ~ ,Q ~ i„ ~ ( th. '1. n ,r f", i F1~ 1M`"1,-, j"'^ > r" e° f ~""'.wr,,.lr" .:r
. ~ y ; r tµ ~ r ~ \ ~t ; ~ 14 ~ ~ 57 ROUND ~ Y s ti r,.,, r: C r• e r 3 l sy . p w1 sy > .,1 r, : ~`i r ) y~y rrr uC :r. Y) ~.h 4 ~ i~ ; ~~i~ d
.?4 A. ~f.~-°`~.~~~~;,„„~s,/T ~.~t ~,1 ~ k ,~`y`L~, r,~(~~~ ^'n.~'x~;+~~~ WASHED STONE / ; L / 1\ i r l~. ? .1 t ~..s j\, t,.~ . J : S~ 1. ~\"`~.r..„.~t {,..-+S lt,„,~r~? , L, t ,it 7{~'i~ `S 3 OPEN THROAT CATC ~~~`''""A'"'"~~ H BASIN
/ ~ ~ ~ Zt ~j , . e r if i ! ..~f L:~`:~ r r~..,/° ~ ~ ~"`r.", ,r^ / s:.. ~ .r ~ ^
„ „ r t ? >v. ~ ?s 1-, r 'J fit. ?k d ~ _.n ~ ~ , . ( ......atL..•r _ i". :e„ ) .:..~r:.,, :r i \ ~y lr r 1~ ^~s~/s. lty,,~ 1 YS /~i t sC..i - D1.2
NON-WOVEN GEOTXT. ~ ~ ~ / u~•: _~t, ~ ~.~v~.,,
FILTER FABRIC r~ ~ , ~ ~ ~ u ~ . ;N~ ~
,._?1 ~ t.
.fir , ~ ' c~ ~~~4 f ~"Y ryk-„~ ~ ~
0~ ! ~ l {::L.S a^ , lY t_;~1/ r~~/ .k~-u Y..x% ~-F f~„yz tas,~ r'- .Sheet Specification for the Installation of HDPE Pipe.
.;::;~'•1 .`:,,r'^~ ~y„? r It •j~ y` ,.ce.~""'s„u r `•~..,Kr. 4 '.~r' \;=~..s .L a. r f r t f...?r ?V ~ r L lL ~r.„1~ L \.,?L...J r / i r ~ ;ti _ • ~ r~ ~ Y ~»1''r-~/ ? , ~ ~ 1 a."i t.. 7"1/" y J t~,~ 1. Contractor may, at his discretion, substitute smooth walled interior
4 t ^y,..... ~~^i;S,.; c 4 k. . i r .~.•;~j :d{~,y~;t 5~.f-~ .v.~ •jd~`t . HDPE pipe in lieu of reinforced concrete', pipe. Contractor shall be
1 v ~ i ~ / tv ~ I t i~ ? f. 7 t 74~v / r~ ~ . N~-~t„r r--\/ ..r r i ~ ..`%^l~ J / \ j " ~.,f ~ / ! \b'.,'/,.. ~Aa ! /,..j / si ;n?".. yt~, _ . responsible for notifying the appropriate';; governing authority and J
obtaining approval for any substitutions.!'Pipe diameters shall remain
• t , as shown on the plans and installation shall be in accordance with
v. the following requirements: a. Installation of HDPE pipe shall be in accordance with the U
n 4 SAND requirements of ASTM D 2321--00 and the Manufacturer's z
8' recommendations. Where the manufacturer's
recommendations differ from the noted ASTM standard, the
more exacting specification shall apply.
b. Soils and aggregates for foundation, embedment and backfill Z
shall be Class IB, II, or III as defined in ASTM D 2321. n
Contractor shall be responsible, athis expense, for retaining LJ O
the services of a geotechnical engineer and testing
NOT 1i~ SCALE D1.2 laboratory to obtain recommendations .and compaction
EXISTING SLOPE results for the specific conditions of the installation. Contractor shall provide copies of all recommendations and 0
8 ~ CLEANOUT/ OBSERVATION WELL N1lTH testing reports to the Owner and the Engineer. (n
ATRIUM GRATE AS c. Trench Excavation shah be in accordance with ASTM D 2321 J U
SHOWN ON DETAIL - Item 6. Removal of sheeting or 'other trench wall - Q
1/D1/3 supports below the pipe zone will not be acceptable.
d. Trench foundation shall be as required by ASTM D 2321 and ~ I-~-
the recommendations of the geotechnical engineer. ~ LL
e. Placing and compacting pipe embedment shall be achieved a =
with small, hand-held or walk-behind compactors as W ~
required by ATSM D2321. ~ Z
EMERGENCY OVERFLOW BERM » „ „ ,t LEVELED 2 x 6 TIMBER f, Minimum embedment densities shall' be established by the = W
1" ABOVE GROUND geotechnical engineer based on evaluation of the specific project conditions. ~ 0
AS LEVEL SPREADER EDGE
FULL LENGTH OF SWALE g. The geotechnical engineer retained !by the Contractor shall ~ Q f -
3:1 CUT SLOPE WITH evaluate the depth of cover provided on the plans to .~.r ~ Q determine that it is suitable for the specific project ~ z
FESCUE BLEND SEED. conditions, Contractor shall provide; copies of this evaluation
MATTING TO BE USED iF to the Owner- and the Engineer prior to installation. W
r_ -r;,,-.- - -.r-.~ .-Y_,, WINTER INSTALLATION h. Contractor shall provide 30 day post-installation deflection
" iS?~r, { ' L.~Jr r ? ~ r 4 C ;i` 1•~?1 OCCURS. J' / testing for all HDPE installations. Use of a 9 point mandrel ~ _
or other approved method shall find na deflections greater ~
than those shown below or as otherwise required by the ~ ~
/ r ,t~ 3~ t y Jl /k,, G,~~ („t_. ~.r '1, d~ Jr .1r..! / geotechnical. engineer:
..i ,,.v„ r
i; y.~, fr,:.f~l.? ~ :.71 ~ ~ af„,.sz:}'..„~-~"i~, ~ x ~,.a; ?r....:5. ~ r / s; ~ ~ v:,:.?"-r~,~ ~f ash/' rv f. ~ r~ n s F
,t~2 /`~.~a mod; ?'k ~ ~~~"S "'.'~'~..~~i .J~ } Sit, r t ~ 1 t\ t ~ . r' , r ~ii,i lt*.:/mss, w.;;/ ~ j 'i../ ~ ~"`~J=. T- 4~ W
„ i _ i t " ~ ~ ,r.. r / 48"~ HPDE PIPE WITH 1» L~3
` ° ~ PERFORATED HOLES. PIPE 4 ° Nominal Percent ~ Q
Jt 4~ L e,~ _ t~,d;.~ , :M:% ~ a ~ TO BE WRAPPED IN NON WOVEN GEOTXT. t ~e ~`~~w~~j-c~.~~;>`~%'* ~~r%'~r`~?: NON-WOVEN GEOTXT. FI ~ ~ Pipe Sizes Deflection Allowed a
FILTER FABRIC ~ LTER u, M `t, Up to and including S.0 ~ o
3,h ~~\a.~ FABRIC. 12-inch ~
~rT:.; ~.L.4" ~ y. ~ ~~rr ver -inch to and Inc u in ° ° 9~~ 30-inch g 4.0 Q ~
~..v~ ° a ver -inch to and including a Z
60-inch 3.0 ~ ~
`~'"'wJrr"`, a• is~°c`'~,..X` f:_?'~ 3'-,t`'.~-fir ~ ;.ti~ . #57 ROUND °
r~y~ WASHED STONE W v, ° >
~ ~ jS.: ~,I'"~ ~ rh a t Z ~ ~
4„ ? 5 H.D.P.E. PIPE INSTALLATIaN INSTRUCTIONS ° ~ z of ~ U
> ova ~z D 1.2 N.T.s. ~ ~o C~
4 SAND
5'
1
® 0 0 °
4 AWENT lNF/LTfL4TlON TRENCH TYPE 3 DETAIL 3: v,T co z° m
!R 00 „
D1.2 narroSCALE a z°EZ~ z
z ,c i~ .j u di U Knawwhatt below. U
CUA4I before you dig. 4 0 U 0 (A a v=,