Loading...
HomeMy WebLinkAbout20050150 Ver 2_More Info Received_20071019Environmental Consultants, PA Road • Raleigh, North Carolina 27614 • Phone: (919) 846-5900 • Fax: (919) 846-9467 www.SandEC.com Town of Holly Springs Engineering Department Attn: Heather V. Keefer, CFM S4?j * 4- Re: Status of Green Oaks Parkway compliance and modification request, Holly Springs, Wake County, NC Dear Mrs. Keefer: The purpose of this letter is to provide an update as to the status of the permit modification request and the efforts being made to bring the Green Oaks Parkway project back into compliance with 401 and 404 permits issued in November of 2006. The table below lists the approved impacts as well as what will be requested as an additional impact within the next week. Please note that the Crossing numbers begin with #1 located just south of the intersection of Green Oaks Parkway and New Hill Road and continue through crossing #7 south to the intersection of Green Oaks Parkway and Premier Drive. Crossing/ Impact Number Originally approved Impacts Additional Impacts To Be Requested #1 5,322 ft2 (0.122 acres) of wetland 20 ft2 (0.0005 acres) wetland (temporary) #2 98 LF (int/un) stream 7 LF (int/un) stream (temporary) 3,563 ft2 (0.1966 acres) wetland 35 ft2 (0.0008) wetland (temporary) #3 294 LF (p/imp) stream 5 LF (p/imp) stream (permanent) 6,752 ft (0.1550 acres) wetland 8 LF (p/imp) stream (temporary) #4 941 ft2 (0.0216 acres) isolated wetland N/A Charlotte Office: Greensboro Office: 236 LePhillip Court, Suite C 3817-E Lawndale Drive Concord, NC 28025 Greensboro, NC 27455 Phone: (704) 720-9405 Phone: (336) 540-8234 Fax: (704) 720-9406 Fax: (336) 540-8235 October 19, 2007 S&EC Project #5005.w0 DWQ Project #99-0239, Ver. 2 SAW-2006-20193-292 125 LF (int/un) stream 1 LF (int/un) stream (permanent) #5 5,940 ft2 (0.1364 acres) wetland 10 LF (int/un) stream (temporary) l d (temporary) an 115 ft (0.0026 acres) wet #6 182 LF (int/imp) stream 10 LF (int/imp) stream (temporary) 2 916 ft2 (0.0210 acres) wetland 0 ft (0 acres) wetland* #7 31 LF (int/imp) stream 60 LF (int/imp) stream (temporary) 240 ft2 (0.0055 acres) wetland (temporary)* 4,245 ft (0.0975 acres) wetland 48 ft2 (0.0011 acres) (permanent) *Area may change after restoration plan has been overlaid Note: int = intermittent, un = unimportant, p = perennial, imp = important Please see the attached maps for a visual representation of the permitted impacts compared to the current field conditions and soon to be requested modifications. This is a preliminary draft of the impact table that will be finalized next week and provided to you within the formal modification and restoration request. Your office previously reviewed a draft copy of the restoration plan and a final copy will be incorporated within the PCN submittal next week. Please call if you have any questions or require further explanation. Sincerely, Sean Clark Environmental Specialist F 2 O 20352 IMPACT AREA 1 UPSTREAM SIDE Z 0 SCALE: 1"=10' DATE: 10/18/07 LEGEND: + 012345 SURVEYOR'S CONSTRUCTION STAKING POINTS FOR HEADWALL -?- CLEARING LIMITS (PER APPROVED PLAN) -X- SILT FENCE (PER APPROVED PLAN) + NOTES: 1. HEADWALL AND FOOTING TO BE CONSTRUCTED WITHIN THE PERMITTED IMPACT AREA, AS ILLUSTRATED. -+- 2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION ACTIVITY WITHIN THE WETLAND IS NEEDED. + 20 SF OF ADDITIONAL TEMPORARY WETLAND IMPACT FOR FOOTING CONSTRUCTION + O 20 20346 20347 914 20348 X PROPOSED HEADWALL (PER APPROVED PLAN) PROPOSED FOOTING (PER SHEET S-8 OF APPROVED HEADWALL PLAN) -}- PERMITTED WETLAND IMPACT FOR STORM DRAINAGE INSTALLATION PERMITTED WETLAND IMPACT FOR STORM DRAINAGE INSTALLATION CONSTRUCTION STAKING POINTS TO BE REVISED BY SURVEYOR IMPACT AREA 1 DOWNSTREAM SIDE Z 0 SCALE: 1"=10' DATE: 10/18/07 LEGEND: 012345 SURVEYOR'S CONSTRUCTION STAKING POINTS FOR HEADWALL -?- CLEARING LIMITS (PER APPROVED PLAN) -X- SILT FENCE (PER APPROVED PLAN) NOTES: 1. HEADWALL AND FOOTING TO BE CONSTRUCTED WITHIN THE PERMITTED IMPACT AREA, AS ILLUSTRATED. 2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION ACTIVITY WITHIN THE WETLAND WILL NOT BE NEEDED. 3. CONSTRUCTION STAKING POINTS FOR WINGWALL WILL BE REVISED TO ACCOUNT FOR WINGWALL ROTATION. R W + + ?' 20344 20343 20 + + + N++ PROPOSED HEADWALL + (PER APPROVED PLAN) PROPOSED FOOTING (PER SHEET S-8 OF APPROVED HEADWALL PLAN) 7 20340 I T 20339 20336 O 20335 O 20337 O . n 20326 + 20325 19110 9131 W PERMITTED WETLAND IMPACT FOR CULVERT INSTALLATION PERMITTED INTERMITTENT STREAM IMPACT FOR CULVERT INSTALLATION IMPACT AREA 2 UPSTREAM SIDE Z 0 SCALE: 1 °=10' DATE: 10/18/07 LEGEND: 012345 SURVEYOR'S CONSTRUCTION STAKING POINTS FOR HEADWALL -?- CLEARING LIMITS (PER APPROVED PLAN) -X- SILT FENCE (PER APPROVED PLAN) NOTES: 1. HEADWALL AND FOOTING TO BE CONSTRUCTED WITHIN THE PERMITTED IMPACT AREA, AS ILLUSTRATED. 2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION ACTIVITY WITHIN THE WETLAND WILL NOT BE NEEDED. 3. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION ACTIVITY WITHIN THE STREAM WILL NOT BE NEEDED. PROPOSED HEADWALL (PER APPROVED PLAN) PROPOSED FOOTING (PER SHEET S-8 OF APPROVED HEADWALL PL ) 203220 0 20337 IMPACT AREA 2 DOWNSTREAM SIDE Z 0 SCALE: 1"=10' y DATE: 10/18/07 PROPOSED FOOTING (PER SHEET S-8 OF APPROVED HEADWALL PLAN) PERMITTED WETLAND IMPACT FOR CULVERT INSTALLATION 15 SF OF ADDITIONAL TEMPORARY WETLAND IMPACT FOR FOOTING CONSTRUCTION 7 LF OF ADDITIONAL TEMPORARY STREAM IMPACT FOR FOOTING CONSTRUCTION PERMITTED INTERMITTENT STREAM IMPACT IMPACT FOR CULVERT INSTALLATION 20 SF OF ADDITIONAL TEMPORARY WETLAND IMPACT FOR FOOTING CONSTRUCTION PROPOSED HEADWALL LEGEND: (PER ADJUSTED LOCATION) 012345 SURVEYOR'S CONSTRUCTION STAKING POINTS FOR HEADWALL -O- CLEARING LIMITS (PER APPROVED PLAN) -X - SILT FENCE (PER APPROVED PLAN) NOTES: 1. HEADWALL AND FOOTING TO BE CONSTRUCTED WITHIN THE PERMITTED IMPACT AREA, AS ILLUSTRATED. 2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION ACTIVITY WITHIN THE WETLAND IS NEEDED. 3. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION ACTIVITY WITHIN THE STREAM IS NEEDED. 4. ALL CONSTRUCTION STAKING POINTS FOR HEADWALL WILL BE REVISED TO ACCOUNT FOR 2' SHIFT TOWARD R/W. + + i 1 CJ9 + + + + + 22+ + + +20 2+ + + + + + + + + + + + + 020331 + + + + + + 20*1 + - PE61T ED WETLAND IMPACT IMPACT AREA 3 + + + + + + OR C LVERT INSTALLATION 0 UPSTREAM SIDE + + + + + + + + z SCALE: 1°=10' AS H ADWAL - (PEI KCI SURVEY) 203 + + + + LEGEND: DATE: 10/19/07 ' 012345 SURVEYOR S CONSTRUCTION STAKING + + + + + + + + POINTS FOR HEADWALL ED HE DWALL LIMITS PER VED PLAN) ( - CLEARING ? (PER + (PER APPROV ® PLAN + + + + - SILT FE CE APPROVED (PER -X + + + - + + + NOTES: + + + + + HEA PROVAS- IDEDI BY KCIDONL10/8/07OAAND OTING10/1LOCA9/TIONS WERE + + + P CONSTRUCTION TEM I?I AC V A STRE M IITY WITHIN HE TI S NEEDED. + + + 3. 2 LF OF ADDITIONAL PERMANENT PERENNIAL STREAM IMPACT IS NEEDED TO ACCOUNT FOR AS-BUILT FOOTING. + + + + + + + 20 + + + + P ITTED PERENNIAL STREAM IM CT F OR CULVERT INSTALLATION - + + + - REAM ADDITIONAL O F -r + T FOR FOOTING CONSTRUCTION IMPACT 9 ADDITIONAL LENGTH OF TEMPORARY STREAM +- IMPACT SHOULD BE FIELD VERIFIED (4 LF ESTIMATED) o + c 0 AS-BUILT FOOTING (PER KCI SURVEY) -AS-BUILT CULVERT (PER KCI SURVEY) AS-BUILT HEADWALL (PER KCI SURVEY) PROPOSED HEADWALL- (PER APPROVED PLAN) R /AW 0 20314 BUILT HEADWALL KCI SURV AS-BUILT FOOTING (PER K 3 IK 20315 PROPOSED HEADWALL EY) CI SURVEY) TIONAL PERMANENT STREAM OO11NG CONSTRUCTION (PER APPROVED PLAN) PERMITTED PERENNIAL STREAM IMPACT IMPACT FOR CULVERT INSTALLATION ADDITIONAL LENGTH OF TEMPORARY STREAM IMPACT SHOULD BE FIELD VERIFIED (4 LF ESTIMATED) LEGEND: 012345 SURVEYOR'S CONSTRUCTION STAKING POINTS FOR HEADWALL -El- CLEARING LIMITS (PER APPROVED PLAN) -X- SILT FENCE (PER APPROVED PLAN) NOTES: 1. AS-BUILT HEADWALL AND FOOTING LOCATIONS WERE PROVIDED BY KCI ON 10/8/07. 2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION ACTIVITY WITHIN THE STREAM IS NEEDED. 3. 3 LF OF ADDITIONAL PERMANENT PERENNIAL STREAM IMPACT IS NEEDED TO ACCOUNT FOR AS-BUILT FOOTING. IMPACT AREA 3 DOWNSTREAM SIDE SCALE: 1"=10' DATE: 10/18/07 20318 6 91 020319 i 7 AS-BUILT CULVERT (PER KCI SURVEY) AS-BUILT HEADWALL (PER KCI SURVEY) PROPOSED HEADWALL (PER APPROVED PLAN) R W +20296 02029 + + + + + + + + + + + + + + + 5 + + PERMITTED WETLAND IMPACT Z FOR CULVERT INSTALLATION ` 1 + + + + + + + + + IMPACT AREA 5 UPSTREAM SIDE Z SCALE: 1"=10' 0 DATE: 10/18/07 ? LEGEND: 012345 SURVEYOR'S CONSTRUCTION STAKING POINTS FOR HEADWALL -?- CLEARING LIMITS (PER APPROVED PLAN) -X- SILT FENCE (PER APPROVED PLAN) NOTES: 1. AS-BUILT FOOTING LOCATION WAS PROVIDED BY KCI ON 10/8/07. 2. HEADWALL TO BE CONSTRUCTED WITHIN THE PERMITTED IMPACT AREA, AS ILLUSTRATED. 2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION ACTIVITY WITHIN THE WETLAND MAY BE NEEDED. 3. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION ACTIVITY WITHIN THE STREAM IS NEEDED. 4. 1 LF OF ADDITIONAL PERMANENT INTERMITTENT STREAM IMPACT IS NEEDED TO ACCOUNT FOR AS-BUILT FOOTING. ADDITIONAL AREA FOR TEMPORARY WETLAND IMPACT SHOULD BE FIELD VERIFIED ADDITIONAL LENGTH OF TEMPORARY STREAM IMPACT SHOULD BE FIELD VERIFIED (4 LF ESTIMATED) 1 LF OF ADDITIONAL PERMANENT STREAM IMPACT FOR FOOTING CONSTRUCTION 0 0 20289 220290 PROPOSED HEADWALL (PER APPROVED PLAN) AS-BUILT FOOTING (PER KCI SURVEY) PERMITTED INTERMITTENT STREA IMPACT FOR CULVERT INSTALLA + + + + + + + + PERMITTED IN ITTENT TREAM IMPACT IMPACT FOR CUL N TALLATION + + + + + + PROPOSED FOOTING (PER SHEET S-8 OF APPROVE HEADWAL N) + + + + + + + + + + + + + + + + + PROPOSED HEADWALL 2 0301 11 + + + + (PER ADJUSTED LOCATION) + x'2 030 PERMITTED WETLAND IMPACT FOR A VERT-MSTALLKFION +? + ?- + + + + + + + + + + 2030 + + + + + 20303 + + + O 0 SF OF ADD ONAL TEMPORARY WETLAND + + IMPACT FOR DOTING CONSTRUCTION 0 20304 + + + f Y ?' + ?, + + 6 LF OF ADDITIONAL TEMPORARY STREAM + + IMPACT FOR FOOLING CONSTRUCTION + + + 85 SF OF ADDITIONAL TEMPORARY WETLAND IMPACT FOR FOOTING CONSTRUCTION + -?- LEGEND: ' 20299 01234 SURVEYOR S CONSTRUCTION STAKING + + + + 0 POINTS FOR HEADWALL - - CLEARING LIMITS (PER APPROVED PLAN) + + X - SILT FENCE (PER APPROVED PLAN) + + + + NOTES: 1. HEADWALL AND FOOTING TO BE CONSTRUCTED + + + 20298 + WITHIN THE PERMITTED IMPACT AREA, AS ILLUSTRATED. 0 2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION + + + ACTIVITY WITHIN THE WETLAND IS NEEDED. + + + + 3. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION ACTIVITY WITHIN THE STREAM IS NEEDED. + + + 4. ALL CONSTRUCTION STAKING POINTS FOR HEADWALL Z WILL BE REVISED TO ACCOUNT FOR 3' SHIFT TOWARD R/W. + + + + + 020297 IMPACT AREA 5 SCALE: 1"=10' + + + + DOWNSTREAM SIDE DATE: 10/18/07 + + + + + LEGEND: 012345 SURVEYOR'S CONSTRUCTION STAKING IMPACT AREA 6 POINTS FOR HEADWALL -?- CLEARING LIMITS (PER APPROVED PLAN) UPSTREAM SIDE -X- SILT FENCE (PER APPROVED PLAN) NOTES: Z SCALE: 1"=10' DATE: 10/18/07 -? 4 1. AS-BUILT FOOTING LOCATION WAS PROVIDED BY KCI ON 10/8/07. 2. HEADWALL TO BE CONSTRUCTED WITHIN THE + + + + + PERMITTED IMPACT AREA, AS ILLUSTRATED. + + + + + + + + + 2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION ACTIVITY WITHIN THE WETLAND MAY BE NEEDED. + + + + + + + + 3. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION ACTIVITY WITHIN THE STREAM MAY BE NEEDED. + + + + + + + + 4 + + + + + + + + + + + + + + + + + + + 4 020279 VERIFIED ?TLAN4 + SHOULD BE FIELD TEMPQRARY IMPACT + + + ? _kDDITIOiJAL LENATH OF- MPORtRY SRAM + + + + + II M PACTSHOl?ILDBE_fJELD V}RIFIED I?4 LF E4TIMATEC, .+ _}_ } . PERMITTED WETLAN+D IMPA+CT + + + + + 4OR CUPERT *TALLAPON + + + + + 0278 + P*OPOSE+ HEADW+ALL + + + + AS-BUILT FOOTING + (PER ?APPROV?D PLATN) + T T + (PER KCI SURVEY) 202740 IB R? IED MPACT FOR LLVERT ?NSTALLATION+ + \ + + + + + 20275 + + + + + + + + + + + + + + + 0277 + + / \ AS-BUILT FOOTING (PER KCI SURVEY) PERMITTED INTERMITTENT STREAM IMPACT FOR CULVERT INSTALLATION PROPOSED FOOTING (PER SHEET S-8 OF APPROVED HEADWALL PLAN) PROPOSED HEADWALL- (PER APPROVED PLAN) 202880 X 6 LF OF ADDITIONAL TEMPORARY STREAM IMPACT FOR FOOTING CONSTRUCTION LEGEND: 012345 SURVEYOR'S CONSTRUCTION STAKING POINTS FOR HEADWALL -?- CLEARING LIMITS (PER APPROVED PLAN) -X- SILT FENCE (PER APPROVED PLAN) NOTES: 1. HEADWALL AND FOOTING TO B WITHIN THE PERMITTED IMP LLUSTRATED. 2. ADDITIONAL TEMPO FOR CONSTRUCTION ACTIVITY WITHIN BE NEEDED. U SCALE: 1"=10' DATE: 10/18/07 IMPACT AREA 6 DOWNSTREAM SIDE LEGEND: 012345 POINTS FOR HEADWALL -?- CLEARING LIMITS (PER APPROVED PLAN) -X- SILT FENCE (PER APPROVED PLAN) NOTES: 1. HEADWALL AND FOOTING TO BE CONSTRUCTED WITHIN THE PERMITTED IMPACT AREA, AS ILLUSTRATED. 2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION ACTIVITY WITHIN THE WETLAND IS NEEDED. 3. ADDITIONAL TEMPORARY IMPACT FOR CONS OCTION ACTIVITY WITHIN THE STREAM IS NEEDED. 220?226g 4. CONSTRUCTION STAKING POINTS FOR WINGWALL4 WILL BE REVISED TO ACCOUNT FOR WINGWALL ROTATION. 20263 CONSTRUCTION STAKING POINTS TO BE REVISED BY SURVEYOR 2026 PROPOSED FOOTING (PER SHEET OF? APPROVED HEADWALL PLAN) (PER ADJUSTED LOCATION) + + + + + / PROPOSED HEADWALL -} PERMITTED INTERMITTENT STREAM IMPACT FOR CULVERT INSTALLATION - + PERMITTED WETLAND IMPACT FOR CULVERT INSTALLATION + + -I- 4- + I-bl P A-C T *R E TRR-AM+SID 00 SCAL 1"=1 DATE: 10%18/07 + + T + + + + + ++ + + ADDITIONAL ARE OF 4MPORARY WEAND IMPACT SHOULD WIELD 1?RIFIED+ + -(40 SF ESTIMA ) ADDITIO LEf;kTH OFI-TEMPOTfARY STklEAM -IMP SHOpULD BE FIELD RIFIED F ESTIMATED?F + + ?ADDITIOtkAL ARIA OF *MPORA4Y WE IMPACT SHOULD BE FIELD V RIFIED -(2* SF E!*MATE* +( + + + + +2025- + + + + + 202* + + + + t -f- h K xX ?- + + ) + + + 02610, + + + + 02 + + + + + -4- 4- 4- 4- PERMITTED WETLAND IMPACT FOR CULVERT INSTALLATION LEGEND: 012345 SURVEYORS CONSTRUCTION STAKING POINTS FOR HEADWALL APPROVED PLAN) _x- SILT FENCE (PER APPROVED NOTES: 1. AS-BUILT HEADWALL AND FOOTING LOCATIONS WERE PROVIDED BY KCI ON 10/8/07. 2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION ACTIVITY WITHIN THE STREAM IS NEEDED. 3. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION ACTIVITY WITHIN THE WETLAND IS NEEDED. 4. 48 SF OF ADDITIONAL PERMANENT WETLAND IMPACT IS NEEDED TO ACCOUNT FOR AS-BUILT FOOTING. 20269 + + + ++ 20270 /` -?- A3}13UILT -*EADWA* - + + 711 ` 2027 + (PER +I SURVEY) + + + 20272 +PROPO ED HEAtWALL + + + + 0 + (PY APPRFED PLi N) + + + + + AS?BUILT EpOTING+ (PER KCI Sl7RVEY) + + T SI + AS BUI T F N E + + L L E C + + -*PER K+ SURVW) + + ?+ +I +? +++ + + + + + + + + + + A(5bITIONAL LE N G* OF R Y STREAM -? + + + p p IMPAC +(17 LF STIMRIED) FI I R D + + + + + + 48 F L PERMANENT WETLAND ---' OA IMP O TI CONSTRUCT10N SCALE: 1"=10' DATE: 10/18/07 + + + + + + A? AREA OF TEMPORARY WETLAND + + + + + + + I OULD BE FIELD VERIFIED IMPACT AREA 7 + + + + + + + DOWNSTREAM SIDE + + + + + + t fi t + + + + + + + + + + + + + + + + + + x 020266 n?0265