HomeMy WebLinkAbout20050150 Ver 2_More Info Received_20071019Environmental Consultants, PA
Road • Raleigh, North Carolina 27614 • Phone: (919) 846-5900 • Fax: (919) 846-9467
www.SandEC.com
Town of Holly Springs
Engineering Department
Attn: Heather V. Keefer, CFM
S4?j * 4-
Re: Status of Green Oaks Parkway compliance and modification request, Holly
Springs, Wake County, NC
Dear Mrs. Keefer:
The purpose of this letter is to provide an update as to the status of the permit
modification request and the efforts being made to bring the Green Oaks Parkway project
back into compliance with 401 and 404 permits issued in November of 2006. The table
below lists the approved impacts as well as what will be requested as an additional
impact within the next week. Please note that the Crossing numbers begin with #1 located
just south of the intersection of Green Oaks Parkway and New Hill Road and continue
through crossing #7 south to the intersection of Green Oaks Parkway and Premier Drive.
Crossing/ Impact
Number
Originally approved Impacts
Additional Impacts
To Be Requested
#1 5,322 ft2 (0.122 acres) of wetland 20 ft2 (0.0005 acres) wetland (temporary)
#2 98 LF (int/un) stream 7 LF (int/un) stream (temporary)
3,563 ft2 (0.1966 acres) wetland 35 ft2 (0.0008) wetland (temporary)
#3 294 LF (p/imp) stream 5 LF (p/imp) stream (permanent)
6,752 ft (0.1550 acres) wetland 8 LF (p/imp) stream (temporary)
#4 941 ft2 (0.0216 acres) isolated wetland N/A
Charlotte Office: Greensboro Office:
236 LePhillip Court, Suite C 3817-E Lawndale Drive
Concord, NC 28025 Greensboro, NC 27455
Phone: (704) 720-9405 Phone: (336) 540-8234
Fax: (704) 720-9406 Fax: (336) 540-8235
October 19, 2007
S&EC Project #5005.w0
DWQ Project #99-0239, Ver. 2
SAW-2006-20193-292
125 LF (int/un) stream 1 LF (int/un) stream (permanent)
#5 5,940 ft2 (0.1364 acres) wetland 10 LF (int/un) stream (temporary)
l
d
(temporary)
an
115 ft (0.0026 acres) wet
#6 182 LF (int/imp) stream 10 LF (int/imp) stream (temporary)
2
916 ft2 (0.0210 acres) wetland 0 ft
(0 acres) wetland*
#7
31 LF (int/imp) stream 60 LF (int/imp) stream (temporary)
240 ft2 (0.0055 acres) wetland (temporary)*
4,245 ft (0.0975 acres) wetland 48 ft2 (0.0011 acres) (permanent)
*Area may change after restoration plan has been overlaid
Note: int = intermittent, un = unimportant, p = perennial, imp = important
Please see the attached maps for a visual representation of the permitted impacts
compared to the current field conditions and soon to be requested modifications. This is a
preliminary draft of the impact table that will be finalized next week and provided to you
within the formal modification and restoration request. Your office previously reviewed a
draft copy of the restoration plan and a final copy will be incorporated within the PCN
submittal next week.
Please call if you have any questions or require further explanation.
Sincerely,
Sean Clark
Environmental Specialist
F
2
O 20352
IMPACT AREA 1
UPSTREAM SIDE Z
0
SCALE: 1"=10'
DATE: 10/18/07
LEGEND:
+ 012345 SURVEYOR'S CONSTRUCTION STAKING
POINTS FOR HEADWALL
-?- CLEARING LIMITS (PER APPROVED PLAN)
-X- SILT FENCE (PER APPROVED PLAN)
+ NOTES:
1. HEADWALL AND FOOTING TO BE CONSTRUCTED
WITHIN THE PERMITTED IMPACT AREA, AS ILLUSTRATED.
-+- 2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION
ACTIVITY WITHIN THE WETLAND IS NEEDED.
+ 20 SF OF ADDITIONAL TEMPORARY WETLAND
IMPACT FOR FOOTING CONSTRUCTION
+ O 20
20346
20347
914
20348
X PROPOSED HEADWALL
(PER APPROVED PLAN)
PROPOSED FOOTING
(PER SHEET S-8 OF APPROVED HEADWALL PLAN)
-}- PERMITTED WETLAND IMPACT
FOR STORM DRAINAGE INSTALLATION
PERMITTED WETLAND IMPACT
FOR STORM DRAINAGE INSTALLATION
CONSTRUCTION STAKING POINTS
TO BE REVISED BY SURVEYOR
IMPACT AREA 1
DOWNSTREAM SIDE Z
0
SCALE: 1"=10'
DATE: 10/18/07
LEGEND:
012345 SURVEYOR'S CONSTRUCTION STAKING
POINTS FOR HEADWALL
-?- CLEARING LIMITS (PER APPROVED PLAN)
-X- SILT FENCE (PER APPROVED PLAN)
NOTES:
1. HEADWALL AND FOOTING TO BE CONSTRUCTED
WITHIN THE PERMITTED IMPACT AREA, AS ILLUSTRATED.
2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION
ACTIVITY WITHIN THE WETLAND WILL NOT BE NEEDED.
3. CONSTRUCTION STAKING POINTS FOR WINGWALL
WILL BE REVISED TO ACCOUNT FOR WINGWALL ROTATION.
R W
+ + ?'
20344 20343 20 + +
+ N++ PROPOSED HEADWALL +
(PER APPROVED PLAN)
PROPOSED FOOTING
(PER SHEET S-8 OF APPROVED HEADWALL PLAN)
7
20340 I
T 20339
20336
O 20335
O 20337
O .
n
20326
+ 20325
19110
9131
W
PERMITTED WETLAND IMPACT
FOR CULVERT INSTALLATION
PERMITTED INTERMITTENT STREAM
IMPACT FOR CULVERT INSTALLATION
IMPACT AREA 2
UPSTREAM SIDE Z
0
SCALE: 1 °=10'
DATE: 10/18/07
LEGEND:
012345 SURVEYOR'S CONSTRUCTION STAKING
POINTS FOR HEADWALL
-?- CLEARING LIMITS (PER APPROVED PLAN)
-X- SILT FENCE (PER APPROVED PLAN)
NOTES:
1. HEADWALL AND FOOTING TO BE CONSTRUCTED
WITHIN THE PERMITTED IMPACT AREA, AS ILLUSTRATED.
2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION
ACTIVITY WITHIN THE WETLAND WILL NOT BE NEEDED.
3. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION
ACTIVITY WITHIN THE STREAM WILL NOT BE NEEDED.
PROPOSED HEADWALL
(PER APPROVED PLAN)
PROPOSED FOOTING
(PER SHEET S-8 OF APPROVED HEADWALL PL )
203220
0 20337
IMPACT AREA 2
DOWNSTREAM SIDE
Z
0 SCALE: 1"=10'
y DATE: 10/18/07
PROPOSED FOOTING
(PER SHEET S-8 OF APPROVED HEADWALL PLAN)
PERMITTED WETLAND IMPACT
FOR CULVERT INSTALLATION
15 SF OF ADDITIONAL TEMPORARY WETLAND
IMPACT FOR FOOTING CONSTRUCTION
7 LF OF ADDITIONAL TEMPORARY STREAM
IMPACT FOR FOOTING CONSTRUCTION
PERMITTED INTERMITTENT STREAM IMPACT
IMPACT FOR CULVERT INSTALLATION
20 SF OF ADDITIONAL TEMPORARY WETLAND
IMPACT FOR FOOTING CONSTRUCTION
PROPOSED HEADWALL
LEGEND: (PER ADJUSTED LOCATION)
012345 SURVEYOR'S CONSTRUCTION STAKING
POINTS FOR HEADWALL
-O- CLEARING LIMITS (PER APPROVED PLAN)
-X - SILT FENCE (PER APPROVED PLAN)
NOTES:
1. HEADWALL AND FOOTING TO BE CONSTRUCTED
WITHIN THE PERMITTED IMPACT AREA, AS ILLUSTRATED.
2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION
ACTIVITY WITHIN THE WETLAND IS NEEDED.
3. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION
ACTIVITY WITHIN THE STREAM IS NEEDED.
4. ALL CONSTRUCTION STAKING POINTS FOR HEADWALL
WILL BE REVISED TO ACCOUNT FOR 2' SHIFT TOWARD R/W.
+ + i 1 CJ9
+ + + +
+ 22+ + +
+20 2+ + +
+ + + + + +
+ + + +
020331
+ + + + + + 20*1 + - PE61T ED WETLAND IMPACT IMPACT AREA 3
+ + + + + + OR C LVERT INSTALLATION 0 UPSTREAM SIDE
+ + + + + + + + z SCALE: 1°=10'
AS H ADWAL -
(PEI KCI SURVEY) 203
+
+
+
+ LEGEND: DATE: 10/19/07
'
012345 SURVEYOR
S CONSTRUCTION STAKING
+ + + + + + + + POINTS FOR HEADWALL
ED HE
DWALL LIMITS
PER VED PLAN)
(
- CLEARING
?
(PER
+
(PER APPROV ®
PLAN + + + + - SILT FE CE
APPROVED
(PER
-X
+ + + - + + + NOTES:
+ + + + + HEA
PROVAS- IDEDI BY KCIDONL10/8/07OAAND OTING10/1LOCA9/TIONS WERE
+ + + P
CONSTRUCTION
TEM
I?I
AC
V
A
STRE M
IITY WITHIN HE
TI
S
NEEDED.
+ + + 3. 2 LF OF ADDITIONAL PERMANENT PERENNIAL STREAM
IMPACT IS NEEDED TO ACCOUNT FOR AS-BUILT FOOTING.
+ + + + +
+ + 20 + + +
+ P ITTED PERENNIAL STREAM
IM CT F OR CULVERT INSTALLATION
- + + + -
REAM
ADDITIONAL
O
F
-r + T
FOR
FOOTING CONSTRUCTION
IMPACT
9 ADDITIONAL LENGTH OF TEMPORARY STREAM
+- IMPACT SHOULD BE FIELD VERIFIED
(4 LF ESTIMATED)
o +
c
0
AS-BUILT FOOTING
(PER KCI SURVEY)
-AS-BUILT CULVERT
(PER KCI SURVEY)
AS-BUILT HEADWALL
(PER KCI SURVEY)
PROPOSED HEADWALL-
(PER APPROVED PLAN)
R /AW
0 20314
BUILT HEADWALL
KCI SURV
AS-BUILT FOOTING
(PER K
3
IK
20315 PROPOSED HEADWALL
EY)
CI SURVEY)
TIONAL PERMANENT STREAM
OO11NG CONSTRUCTION
(PER APPROVED PLAN)
PERMITTED PERENNIAL STREAM IMPACT
IMPACT FOR CULVERT INSTALLATION
ADDITIONAL LENGTH OF TEMPORARY STREAM
IMPACT SHOULD BE FIELD VERIFIED (4 LF ESTIMATED)
LEGEND:
012345 SURVEYOR'S CONSTRUCTION STAKING
POINTS FOR HEADWALL
-El- CLEARING LIMITS (PER APPROVED PLAN)
-X- SILT FENCE (PER APPROVED PLAN)
NOTES:
1. AS-BUILT HEADWALL AND FOOTING LOCATIONS WERE
PROVIDED BY KCI ON 10/8/07.
2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION
ACTIVITY WITHIN THE STREAM IS NEEDED.
3. 3 LF OF ADDITIONAL PERMANENT PERENNIAL STREAM
IMPACT IS NEEDED TO ACCOUNT FOR AS-BUILT FOOTING.
IMPACT AREA 3
DOWNSTREAM SIDE
SCALE: 1"=10'
DATE: 10/18/07
20318
6
91
020319
i
7
AS-BUILT CULVERT
(PER KCI SURVEY)
AS-BUILT HEADWALL
(PER KCI SURVEY)
PROPOSED HEADWALL
(PER APPROVED PLAN)
R W
+20296
02029
+
+ +
+ +
+ +
+ +
+
+ +
+
+
+
5
+
+
PERMITTED WETLAND IMPACT Z
FOR CULVERT INSTALLATION `
1
+
+
+ +
+ +
+ + +
IMPACT AREA 5
UPSTREAM SIDE
Z
SCALE: 1"=10' 0
DATE: 10/18/07 ?
LEGEND:
012345 SURVEYOR'S CONSTRUCTION STAKING
POINTS FOR HEADWALL
-?- CLEARING LIMITS (PER APPROVED PLAN)
-X- SILT FENCE (PER APPROVED PLAN)
NOTES:
1. AS-BUILT FOOTING LOCATION WAS PROVIDED
BY KCI ON 10/8/07.
2. HEADWALL TO BE CONSTRUCTED WITHIN THE
PERMITTED IMPACT AREA, AS ILLUSTRATED.
2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION
ACTIVITY WITHIN THE WETLAND MAY BE NEEDED.
3. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION
ACTIVITY WITHIN THE STREAM IS NEEDED.
4. 1 LF OF ADDITIONAL PERMANENT INTERMITTENT STREAM
IMPACT IS NEEDED TO ACCOUNT FOR AS-BUILT FOOTING.
ADDITIONAL AREA FOR TEMPORARY WETLAND
IMPACT SHOULD BE FIELD VERIFIED
ADDITIONAL LENGTH OF TEMPORARY STREAM
IMPACT SHOULD BE FIELD VERIFIED (4 LF ESTIMATED)
1 LF OF ADDITIONAL PERMANENT STREAM
IMPACT FOR FOOTING CONSTRUCTION
0
0
20289
220290
PROPOSED HEADWALL
(PER APPROVED PLAN)
AS-BUILT FOOTING
(PER KCI SURVEY)
PERMITTED INTERMITTENT STREA
IMPACT FOR CULVERT INSTALLA
+ + + + + + + +
PERMITTED IN ITTENT TREAM IMPACT
IMPACT FOR CUL N TALLATION + + + + + +
PROPOSED FOOTING
(PER SHEET S-8 OF APPROVE HEADWAL N)
+
+ + + +
+
+
+
+ + + + + +
+ + +
PROPOSED HEADWALL 2 0301 11 + + + +
(PER ADJUSTED LOCATION)
+
x'2
030 PERMITTED WETLAND IMPACT
FOR A VERT-MSTALLKFION +?
+
?- + + + + +
+ + + + +
2030
+ + + + +
20303 + + +
O 0 SF OF ADD ONAL TEMPORARY WETLAND + +
IMPACT FOR DOTING CONSTRUCTION
0 20304 + + +
f
Y ?'
+ ?,
+ +
6 LF OF ADDITIONAL TEMPORARY STREAM + +
IMPACT FOR FOOLING CONSTRUCTION
+ + +
85 SF OF ADDITIONAL TEMPORARY WETLAND
IMPACT FOR FOOTING CONSTRUCTION + -?-
LEGEND:
' 20299
01234 SURVEYOR
S CONSTRUCTION STAKING + + + + 0
POINTS FOR HEADWALL
- - CLEARING LIMITS (PER APPROVED PLAN) + +
X - SILT FENCE (PER APPROVED PLAN)
+ + + +
NOTES:
1. HEADWALL AND FOOTING TO BE CONSTRUCTED + + + 20298
+
WITHIN THE PERMITTED IMPACT AREA, AS ILLUSTRATED. 0
2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION + + +
ACTIVITY WITHIN THE WETLAND IS NEEDED. + + + +
3. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION
ACTIVITY WITHIN THE STREAM IS NEEDED. + + +
4. ALL CONSTRUCTION STAKING POINTS FOR HEADWALL Z
WILL BE REVISED TO ACCOUNT FOR 3' SHIFT TOWARD R/W. + + + + + 020297
IMPACT AREA 5 SCALE: 1"=10' + + + +
DOWNSTREAM SIDE DATE: 10/18/07 + + + + +
LEGEND:
012345 SURVEYOR'S CONSTRUCTION STAKING
IMPACT
AREA 6
POINTS FOR HEADWALL
-?- CLEARING LIMITS (PER APPROVED PLAN)
UPSTREAM SIDE
-X- SILT FENCE (PER APPROVED PLAN)
NOTES: Z SCALE: 1"=10'
DATE: 10/18/07
-?
4
1. AS-BUILT FOOTING LOCATION WAS PROVIDED
BY KCI ON 10/8/07.
2. HEADWALL TO BE CONSTRUCTED WITHIN THE + + + + +
PERMITTED IMPACT AREA, AS ILLUSTRATED. + + + + + + + + +
2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION
ACTIVITY WITHIN THE WETLAND MAY BE NEEDED. + + + + + + + +
3. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION
ACTIVITY WITHIN THE STREAM MAY BE NEEDED. + + + + + + + + 4
+ + + + + + + + + +
+ + + + + + + + + 4
020279
VERIFIED ?TLAN4
+ SHOULD BE FIELD TEMPQRARY
IMPACT
+ + +
?
_kDDITIOiJAL LENATH OF-
MPORtRY SRAM +
+ + +
+ II
M
PACTSHOl?ILDBE_fJELD V}RIFIED I?4 LF E4TIMATEC, .+
_}_
}
.
PERMITTED WETLAN+D IMPA+CT + + + + +
4OR CUPERT *TALLAPON + + + + +
0278
+
P*OPOSE+ HEADW+ALL + +
+ +
AS-BUILT FOOTING + (PER ?APPROV?D PLATN) +
T T +
(PER KCI SURVEY) 202740
IB
R? IED
MPACT FOR LLVERT ?NSTALLATION+ +
\ + + + + +
20275
+ + + + + +
+ + + + +
+ + + +
0277
+
+ / \ AS-BUILT FOOTING
(PER KCI SURVEY)
PERMITTED INTERMITTENT STREAM IMPACT
FOR CULVERT INSTALLATION
PROPOSED FOOTING
(PER SHEET S-8 OF APPROVED HEADWALL PLAN)
PROPOSED HEADWALL-
(PER APPROVED PLAN)
202880
X
6 LF OF ADDITIONAL TEMPORARY STREAM
IMPACT FOR FOOTING CONSTRUCTION
LEGEND:
012345 SURVEYOR'S CONSTRUCTION STAKING
POINTS FOR HEADWALL
-?- CLEARING LIMITS (PER APPROVED PLAN)
-X- SILT FENCE (PER APPROVED PLAN)
NOTES:
1. HEADWALL AND FOOTING TO B
WITHIN THE PERMITTED IMP LLUSTRATED.
2. ADDITIONAL TEMPO FOR CONSTRUCTION
ACTIVITY WITHIN BE NEEDED.
U
SCALE: 1"=10'
DATE: 10/18/07
IMPACT AREA 6
DOWNSTREAM SIDE
LEGEND:
012345
POINTS FOR HEADWALL
-?- CLEARING LIMITS (PER APPROVED PLAN)
-X- SILT FENCE (PER APPROVED PLAN)
NOTES:
1. HEADWALL AND FOOTING TO BE CONSTRUCTED
WITHIN THE PERMITTED IMPACT AREA, AS ILLUSTRATED.
2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION
ACTIVITY WITHIN THE WETLAND IS NEEDED.
3. ADDITIONAL TEMPORARY IMPACT FOR CONS OCTION
ACTIVITY WITHIN THE STREAM IS NEEDED. 220?226g
4. CONSTRUCTION STAKING POINTS FOR WINGWALL4
WILL BE REVISED TO ACCOUNT FOR WINGWALL ROTATION.
20263
CONSTRUCTION STAKING POINTS
TO BE REVISED BY SURVEYOR
2026
PROPOSED FOOTING
(PER SHEET OF?
APPROVED HEADWALL PLAN)
(PER ADJUSTED LOCATION) + +
+ +
+
/ PROPOSED HEADWALL -}
PERMITTED INTERMITTENT STREAM
IMPACT FOR CULVERT INSTALLATION - +
PERMITTED WETLAND IMPACT
FOR CULVERT INSTALLATION
+
+
-I- 4-
+
I-bl P A-C T *R E
TRR-AM+SID
00
SCAL 1"=1
DATE: 10%18/07 +
+ T + + +
+ + ++ + +
ADDITIONAL ARE OF 4MPORARY WEAND
IMPACT SHOULD WIELD 1?RIFIED+ +
-(40 SF ESTIMA )
ADDITIO LEf;kTH OFI-TEMPOTfARY STklEAM
-IMP SHOpULD BE FIELD RIFIED
F ESTIMATED?F + +
?ADDITIOtkAL ARIA OF *MPORA4Y WE
IMPACT SHOULD BE FIELD V RIFIED
-(2* SF E!*MATE* +(
+ + + + +2025-
+ + +
+ + 202*
+
+ + + t -f-
h
K xX ?- + +
) + + +
02610, + + + +
02 +
+ + + +
-4- 4- 4- 4-
PERMITTED WETLAND IMPACT
FOR CULVERT INSTALLATION
LEGEND:
012345 SURVEYORS CONSTRUCTION STAKING
POINTS FOR HEADWALL
APPROVED PLAN)
_x- SILT FENCE (PER APPROVED
NOTES:
1. AS-BUILT HEADWALL AND FOOTING LOCATIONS WERE
PROVIDED BY KCI ON 10/8/07.
2. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION
ACTIVITY WITHIN THE STREAM IS NEEDED.
3. ADDITIONAL TEMPORARY IMPACT FOR CONSTRUCTION
ACTIVITY WITHIN THE WETLAND IS NEEDED.
4. 48 SF OF ADDITIONAL PERMANENT WETLAND IMPACT
IS NEEDED TO ACCOUNT FOR AS-BUILT FOOTING.
20269
+
+ + ++
20270
/`
-?- A3}13UILT -*EADWA*
- +
+
711 `
2027 + (PER +I SURVEY)
+ +
+
20272 +PROPO ED HEAtWALL + + + +
0 + (PY APPRFED PLi N) + + + +
+ AS?BUILT EpOTING+
(PER KCI Sl7RVEY) + +
T SI
+ AS BUI
T F
N
E + +
L
L
E
C
+ + -*PER K+ SURVW) + +
?+ +I +?
+++
+ +
+ + + +
+ + + + A(5bITIONAL LE
N
G* OF R Y STREAM -?
+
+
+ p
p
IMPAC
+(17 LF STIMRIED) FI I
R D
+ + + + + + 48 F L PERMANENT WETLAND ---'
OA
IMP O
TI
CONSTRUCT10N
SCALE: 1"=10'
DATE: 10/18/07 + + + + + + A? AREA OF TEMPORARY WETLAND
+ + + + + + + I OULD BE FIELD VERIFIED
IMPACT AREA 7 + + + + + + +
DOWNSTREAM SIDE + + + + + +
t fi t
+ +
+ + +
+ + +
+ + +
+ + +
+
+ +
+
x
020266
n?0265