Loading...
HomeMy WebLinkAbout20080330 Ver 1_Restoration Site Plans_20080220 e ~1 I~ a Notes: Le end 9 . 1) This is a survey of all of the Deerfield United Methodist Church of Boone, N.C. pro ert described in the followin ~0 P Y 9 Deed Book 084 at page 272; Deed Book 090 at page 271; Deed Book 099 of page 208; Deed Book 199 at pa e in9: ~ 9 577; Book 109 of Records at page 215 and Book 171 of Records at page 905 and also o survey of a 1.923 acre f page acre ~ z tract, being a portion of the East Fork Properties, Inc. property described in Book 171 of Records of page 894. t- EXIStIn 2) Bearings are relative to the North Carolina Geodetic Survey system, NAD '83 and all measurements are horizontal 9 ital, ~ ~ with the exception of the tie from the beginning corner to NCGS monument "CRIPPEN2", it having a 0.99985887 Lowland Area combined factor a lied. All areas were cam '87 ~ pp puted by coordinate geometry. Elevations are relative fo the National Geodetic Vertical Datum of 1929. onal ~ ~ ~ 3) A small portion along the western boundary of the 1,923 acre tract where it crosses the branch is inside of the 500 year flood boundary. A!I other portions of this property are in a Zone X flood zone, an area of minimal he ~ ~ ~ ~ flooding, according to FEMA Flood Insurance Rafe Maps for Watauga County, Community #370253, Panel X0184 E, E, ~ N 4) This property is inside of a Class 1V Watershed. The parcel acquired by Book 109 of Records at a e 215 is Y~ zoned B-2. Ali of the h r P g of a parcels shown on this plat are zoned R-A. 5) There is no specii'fed NC DOT right-of-way width for Deerfield Road. Said road is sub'ect to NC DOT maintenance J from "ditchline to ditchline". once ~ ~ ame am on ~~II S ~d ~ W ® ~ BREMCO Barney Hampton ~ SR 1523 ~ 8" rod \ eer le n l e e o Is urc set Road - ~ c:aeorgia Hamp tc?n ~ ~ Di3 C,~95 at pg. ~ o ~ a "~`~exlsting 36` l~ j U ~ N f W ~~~V ' NCGS monumen `CRIPPEN2` 4 a 0 RO g " N- 902,368.2 F- 1,221,775.J5 W Gl +'C,, C ~ j, NAD '83 ~ Q ~ ~ m e~ 0 S I p ng Hea I 22 ~ ~ 5~8` rod 1 ~~yb set ~8' rod i% ~ ~ , / I ~ J . ' exisfln 3 ~A, ~ ~ 0 g de raded ~ 0 ~ ~ _ goo x 4 i ~ 2 cm + Exlstm 3x36. % ; ~ k~_ i P / V ~ f0 ~L Q 9 , !i-; ~ ~i ~ o ~ ~ U Per 9ra~eo '`8~ ~ o ~ o ~ ~i ~ a' 0 15+ ~ ~ ~ //,,i ~ / % r~~/~' ~ a u1 = king a ~E ' 1 Exis ' ' of ric of edge ~ ~ 4 4 ~ _,~l / ~ ~ i i ~ ~ , ~ / ~ ~ ~ ~ ~ ~ / W ~ Now or Formerly .ro ~ ~ / j~ ~ X. Edith Ham ~ on, e t. al, W 3 ~ / / / ~ / ~ ~ St t p Z Q L_~1!~' ; , e ~Q W a gf ~ lr + C ~ Lowland Area - o a ~o a o 4 W ~ M w d oX ti Currently o As halt Parkin P 9 4 ~ ~ ~ ~ m L ~ ~ CD ~ i N in V) r.. ~ 0 0 Q V) ~ ~ ~ ~ wQ 11 ~ . ~ ~'s . ' ~ k ~ ~ ~ ~ c=i ~ 3 ~ d ~ ~ ~ 0 0 ~ G',, ~4 ~ ~n v , o, S ~ ~ ~ Q O s~ ~ t~ , ~ ° ~ ~ V Q i~ ~ m ~~oa j~ as r ro er les, nc, ~ 5 ~ ~ e monument found P ~ ~ ~ Z w o ~s ~ V ~ ~ ~6 Topographical Survey by.~ ~ G~ O ~ well C~ c • ` ~ A afachian Land S rvi % ~ ~ ~ Z pp e ces, P,A , 1800, Hldden Shadows Drlv, Q ~ ~ 99 -~OS 9~~ ~ r Boone, North Carolina 28b0;~ / (i 254-0290 Q V ~ \ ~ 5 Z~~~ \ New River Township Watauga County North Carolina ~ ~ ~ o a ~C 271 June 13, 1997 ~ v Opropane ej tank f \ nCl Datum: NGVD '29 - - Con tour Interval = 2' ~ ' ~ o Cl ~~a~ 0 0, J a 4W W W ~ W ~ SU' 0` 100' V "M66d~~ i DRAWING NO. 1 11=50' 112 e Sequence of Construction: General & Erosion Control Notes: 1) Upper project Priority 1 & 2 restoration 1) Proposed Conservation Easement area N 2.8 acres ~ a. Excavate Priority 1 channel leaving channel plug (dry 2) Once site construction within an area has ceased, all Symbol Description channel) m disturbed buffer area will be immediately stabilized ~ b. Remove old culvert in the upper parking area and turn Proposed Permanent Conservation water into Priorit 1 channel (temporary seed and coconut matting) the same day ~ ~ Y Easement (to be planted with native c. Install restoratton structures in Priority 1 reach (to 3) Following completion of restoration activities fhe banks z . . ~ grass/herb, shrub, & tree species) ensure longsterm stability of the restored channel will be seeded with a native ~ floodplain mix (permanent) ail ° ° ° d. Slope back parking lot vertical streambanks (2:1 or flatter Proposed Wetland Creation/ 4) Sod matting will be grubbed on-site and used when avail- ~ ~ ° ° ° Enhancement Area creating bankfull bench ° ° ° e. lnsfall restoration structures in Priority 2 channel able to line the near-bank regions of the constructed ~ ~ f. Permanently stabilize all riparian areas with native seed channel Existing vertical sfreambanks ~ ~ will be raded to include mtx 9 bankfull bench and slope not 2) Upper project Priority 1 restoration and culvert installation to exceed 2:1 (see Cross-sections) a. Excavate Priority 1 channel from Station 5+10 to tie-in of f om existing channel (NSta 8+10) leaving channel plug (dry channel) cannel) ~ Log Deflection Jam with Root Wads b. Break asphalt of church parking lot entrance to establish consistent grade S c. Install bottomless arch culvert in the dry J-hook d. Excavate Priority 1 channel from Sta 8+10 through Sta 11+00 +~O ~ ~ e, Pull channel plug allowing water to flow through Priority 1 Sin le Rock Vane (see Details) (newly constructed) channel 9 f. Install restoration structures in upper project Priority 1 reach (preferred to install structures in flowing channel a Cross-vane to ensure long-term stability g. Permanently stabilize all riparian areas with native seed mix ar~_ x Existing channel to be relocated 3) Lower project Priority 2 restoration a. Relocate 3x36" CMPs on David Risk property am e am On Existm Pro osed stream location 9/ P b. Remove invasive Mulfiflora rose c. Install all restoration structures d. Permanently stabilize all riparian areas with native seed mix BREMCO Barney Hampton ~ ~ i o0 o ~ jV~N eer le nl e e o Is urc 0 +.,t~U SR 153 ~ ~Z e'rad Approx. Proposed Conservation Easement W vt~~ set Lower ro 'ect area N 1.7 + -acres Existing Pipe to be removed Road a a ~ ~ m Pl Georgia Kamp ton A rox. Pro osed ConsE PP P CB 09~ ai` pg. ?56 >sed Conservation Easement existing 3s• ~ Degraded portions of the existing pipe will be removed. ct area N 1.1 acres) The stable ortion will remain intact and used as a Up er project area N P P hi h-flow i e. 9 P P I NCGS monumen "CRIPPEN2" i 3 d~ Existm 3x36 GMP s 9 R O ~ N- 90$388.2 E- 1,221, 775.35 ~ 0 NAD '83 ~ Q = . end ~ o i 'n 1 i n to be relocated a rox. Ex sti g Channe Sect o PP 30 linear feet ownstream between oxbow and i e d pp e~f~ o ti Q to be filled N 12-20 ZD ~ ' S 'n Hea P 9 ~ and remain as high-flow 2 ~ . 5~~t rod Z 1 ~ , + /8• rod 0 ~ a . 1 ~j • channel ~ ~ ' ~ Existm Channel Location g ' • ~ . • ~ •a • . -flow channel • ~ a oo ~ as ~ fix. ~ . oD + ~ , • mw raved ~ f . ~ w 3 ~ . o er ~ ~ Q • ~ m a~ . Exis . UpP rea , ~ Z Exis a~knq a . ~ ~e o Q k ~n'•Q, 'Qa~,o~~o. ~o~,o• p~ . t . . W~ of ridge P . _ _ ~ ot~'~~ ~ P Q ~ 4 , • . . 6 k ~ ' , 1 v G ~ ~ Q ~ 0 G 0 ~ d ed 100' x 42'' . k • P~ s ~~o Now or F-orm erl y a . /B rod C7 ~ V ~ ~ . e~ ~ ~ ~ ~ ~ f°'x89 ~e Edith Hampton, e t. a!. ~ 3 at emoU herry X,- Pr osed 90' • • ~ tree •0 ~ i . ~ • ~ • ' • c St ' N ~ `7 G V C' ..7 • ottoml s Arch Culve ~ • 0 st Q ~ . . wQ ~ X}. a ~ 3 ~ ~ ~ Pro osed Channel Location o° e O o 0 ~ rat 2 ^ " do, • o Prio .y ~ ~ ~ o ~ rea X ~ + ~ Pie o Restoration A o As halt Parkin CD ~ 0 0 00 i.. t F k Q N 5~,0~ V G~ L a, a o o ~e ~ 4, ~ ~ 0 Priorit 1 Restoration Ar ' co x ~ ~ ~ s F• ~ ~ ~'s . ~ O k Reltc annel wiN be ~ ~'r / Q ~ v~ _ _ r- ft1 o ~ ~ ~ ~s N ~Q ~ l ` L ~ a X ~ ~r N Q o r~~ ~ 0 ~a~` gad ~ oc 0~ n 5 ,~°'~'~5 con a monument found as or ro er les, c P . ~Oo~ b G~ ~ G~ Topographical Survey by.' W ~ ~ ~ F ~ z ~ ' V / • .eii \ v k ~ 8're6ar 99--208 Appalachian Land Services, ~.A / ?80C Hidden Shadows Dave Q ~ ~ Boone, North Carolina 2f3CG? / (704) 264-0290 W ~ v U 5`°~~° ,~~'r~ ' ~ ec ~J 9 . ti ~ ~o o~ New River Township Watauga County North !,~arolina Z 0 ~ b J ~ 90 271 June 13, 1997 Q Propane 0 - tank Datum: NGVD '29 - - Con tour !n tervai= 2' W ~ e ~ W W ~ 1/2 ipe f rid 50' 0' 100' ~ ~ DRAWING NO. 1 "=50' 212