HomeMy WebLinkAbout20052146 Ver 4_No Written Concurrence_20080507O?oF W A r 10 Michael F. Easley, Governor
William G. Ross Jr., Secretary
7 North Carolina Department of Environment and Natural Resources
-i
Coleen H. Sullins, Director
Division of Water Quality
May 7, 2008
Brunswick County
DWQ Project #: 05 2146 V4
Jeffery & Cheryl Beale
5267 Grovemont Drive
Elkridge, MD 21075
Edward & Annie Dougherty
9821 Brookford Road
Potomac, MD 20854
Subject Property:
Seawatch at Sunset Harbor
Phase 13, Lots 57 & 58
NO WRITTEN CONCURRENCE NEEDED
Dear Mr. & Mrs. Beale and Mr. & Mrs. Dougherty:
You have our approval, in accordance with the attached conditions, to construct a shared docking
facility described in your EXPRESS CAMA Major application dated March 10, 2008. After
reviewing your application, we have decided these impacts are below the threshold for written
authorization as long as all conditions of General Water Quality Certification Number 3687
(GC3687) is met. This certification may also be viewed on our website at
http://h2o.enr.state.nc.us/ncwetlands. This Certification allows you to use the Regional General
# 198700056 Permit when issued by the US Army Corps of Engineers.
This approval is only valid for the purpose and design that is described in your application. If
you change your project, you must notify us and you may be required to send us a new
application. If the property is sold, the new owner must be given a copy of this Certification and
approval letter and is thereby responsible for complying with all conditions. If total wetland fills
for this project (now or in the future) exceed one acre, compensatory mitigation may be required
as described in 15A NCAC 2H.0506 (h) (6) and (7). This approval shall expire when the
corresponding Nationwide Permit expires or as otherwise provided in the General Certification.
For this approval to be valid, you must follow the conditions listed in the attached certification
and any additional conditions listed below.
Conditions of Certification:
1) Upon completion of the project, the applicant shall complete and return the enclosed
"Certification of Completion Form" to notify DWQ that all the work included in the 401
Certification has been completed. The responsible party shall complete the attached form
and return it to the 401 /Wetlands Unit of the Division of Water Quality.
Violations of any condition herein set forth may result in revocation of this Certification and may
result in criminal and/or civil penalties. Ivo"`ncarolina
Naturally
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service
Internet: www.ncwaterquality.ore Location: 512 N. Salisbury St. Raleigh, NC 27604 Fax (919) 733-2496 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer - 50% Recycled110% Post Consumer Paper
Page Two
Jeffery & Cheryl Beale
Edward & Annie Dougherty
DWQ Project #: 05 2146 V4
May 7, 2008
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a
hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General
Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C.
27699-6714. This certification and its conditions are final and binding unless you ask for a
hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean
Water Act. If you have any questions, please telephone Ian McMillan at 919.733.1786 or Joanne
Steenhuis at our Wilmington Regional Office at 910.796.7215.
Sincerely,
Joanne Steenhuis
Senior Environmental Specialist
Enclosures
GC 3687
Certification of Completion
cc: Virginia Johnson - Land Management Group
Ian McMillan - DWQ 401 Oversight Unit
David Timpy - Corps of Engineers Wilmington
Doug Huggett - DCM Morehead City
Jason Dail - DCM Wilmington
Central Files
WiRO