My signature below authorizes Sonny Tyson of Sonny's Construction to act as my agent to file the
abbreviated application form for applying for a 401 Water Quality Certification to impact
FERC (Federal Energy Regulatory Commission) regulated lake shore or bottom under the
U.S. Army corps of Engineers Permit GP 30.
-"IX2 6??- -
Mark Clontz ' 6-? Date
12600 Idlebrook Road
Midland, NC 28107
Zooa
MAC 6
?PSE???P't?RB?N
The following is an abbreviated application form for those applying for a 401Water
Quality Certification to impact FERC (Federal Energy Regulatory Commission)
regulated lake shore or bottom under the U.S. Army corps of Engineers Permit
GP30. This Application cannot be used for wetland or stream impacts. Please
provide seven (7) copies of this application and supporting information as well as a
non-refundable application fee to the Division of Water quality of $240.00 for
impacts of to lake bottom of less than 1 acre and $475.00 for impacts to lake bottom
of greater or equal to 1 acre. 0 8 0 7 8 2
Applications should be sent to:
l?
Division of Water Quality Wetland Unit $PAID
MAY 6 2008
1650 Mail Service Center
Raleigh, NC 27699-1650 DENR-WATER(
WAiT.R BRANCH
WE}WDS AND STORMWAT
1. Applicant Information
1. Owner/Applicant Information
Name: Mark & Debbie Clontz
Mailing Address 12600 Idlebrook Road
Midland, NC 28107
Telephone Number: (704) 888-5787 Fax Number
E-mail address:
2. Agent Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Sonny Tyson
Company Affilaition: Sonny's Construction
Mailing Address: 186 Vineyard Road
Norwood, NC 28128
Telephone Number: (704) 438-1865 Fax Number
E-mail address:
H. Project Information
Attach a vicinity map clearly showing the location of the property with respect to
local landmarks such as towns, rivers, and roads. Also provide a detailed site
plan showing property boundaries and development plans in relation to
surrounding properties. You may use the diagram below to make a hand sketch of
your project. Also see the example below for guidance. Both the vicinity map and
site plan must include a scale and north arrow. The footprints of all buildings,
impervious surfaces, or other facilities must be included.
1. Location
County: Montgomery Nearest town:
Subdivision name or site address(include phase/lot number)
Swift Island Plantation
Lot 54 (176 Forest Lake Court)
Directions to site please include road numbers, landmarks,etc (This is not
necessary if an adequate vivinity map is included)
From Albemarle, NC, east on US Hwy 24-27, Right on US Hwy 73
Turn right on Lilly's Bridge Road, Right on Swift Island Road,
Right on Water Oak Way, Left on Forest Lake Court
2. Describe the existing land use of the site at the time of this
application:
Residential home with grass lawn and natural area
3. Property size (acres)
4. Nearest body of water(stream/river/sound/oceanllake): Lake Tillery
5. Describe the purpose of the proposed work:
Construct new pier and boathouse. Install rip rap at shoreline
6. List the type of equipment to be used to construct the project:
Excavation equipment and carpentry tools
7. Amount of impact (including all excavation, backfill, rip rap, reatining walls,
etc.) below the normal lake pool level in square feet or acres:
604 Square feet
8. a.Amount of impact (including all clearing, backfill, excavation rip rap,
reatianing walls, etc.) above the normal pool lake level and 50 feet landward in
square feet or acres:
450 Square feet
Applicant/Agents's SignatV Date
(Agent's signature is valid only if an authorization letter from the applicant is provided)
.47 acres
Mt Gilead
b. Please describe vegetation above the normal pool lake level and 50 feet land-
ward to be impacted(number of trees for instance):
Lake (Full Pond)
Full Pond
Shoreline
Please approximately sketch the following information on this plan
(please provide dimensions for each item, such as 10 ft x 100 ft)
1) All proposed vegetation clearing (provide dimensions)
2)Location of rip rap or fill to be placed above the full pond elevation
3)Location of rip rap or fill to be placed below the full pond elevation
4)The location of any proposed structures such as buildings, retaining
walls, docks, etc
5)The location of any evacuation or dredging below the Full Pond
elevation.
6)Location of construction access corriders.
4" Rip Rap 2 to 1 slope
V x -
rJ ?4 s 7 LLB' 1? Tr r'
M..
Zcom All Zoorn In Zoom Out Pan Identity Search Q.iery dear Map Print Map Measure Help l
On Label Name
naaaa
On Label Name
1- No dredging to be done
2 Work to be performed
a Build New Boathouse and Pier
b Line shore line with rip rap
3 No resource impact for project as no vegetation or fish habitats will be
disturbed
5 Schedule-To be completed within 6 monthsof Progress Energy approval
6 Agency approvals not required, as no dredging to be performed or
seawall to be built .x;
Dwelling
Proposed Boathouse
u s.
:a Parcels
Da;cei raU
Marc ll Address 7;, FCRE'_?'T L,.KE
Parcet Owner;
iTc MARK E & DEErt4 R.
.Ee
-?
r 4 -
`
" -o t !dumber. LCT 64
. ?.?pal Descriptiow SIFT ISLpaiGl
__?! JT?,TIC?i?
r
j eeReferents B eeJ Pc 215
' a,yd Area: 4 ac.i?s
yFar Buiit:
f :ildlnRValue.SO
_
/ w? and Vekltie?S24i"i U'
rather Valrle'.w,
ota! Tax Value•£2-10 700
? ? Sale Year: ir;.
u
}
?,
Sage Price::242 UiJfj
r s
Vie%v Property Carcl,:s
.e Zoorn to
th? ^'nC to i:ieniit another
p?t in Parcels
?a w
A 3,11,1'.L
I
Stanly j C
':0 -&x
Mark & Debbie Clontz
176 Forest Lake Court Mt. Gilead, NC
4 ( J. 0 4'
r
i
?
..t .?;
:?, we 1 ,?{ T: •_ -.
^"a?alie+THdl:*d R%. c'%W'aw+:.?, iy?; ww:?+ir.?..+l.xiM'?rGi>v, ?9'r-...w.w nSdwr ^?
,. aau: `ihp?yY? .
v ?.
... ht!L ac,. CM =,.,
mt gilead, nc - Google Maps -tr ahoC'. Maps, Dn Ing Daemt cns, a..,
CA ?.? •t`?A.ta,4 rtlgiead.nc
L.. Search the snap
Ng aiCh Pr Solt=. !3 8..
•
? QE
? Cr r
{2a?
C2.j
?52
Q7i)
_ 527
,...°arpn 0 g4Cns
'mss. ?2?i
176 forest Lake Court
Mt. Gilead, NC
, r1
From Albemarle, NC, east on US Hwy 24-27, Right on US Hwy 73
Turn right on Lilly's Bridge Road, Right on Swift Island Road,
Right on Water Oak Way, Left on Forest Lake Court
s x
1.1ap _lide T-rral:
(2 :7) L )