Loading...
HomeMy WebLinkAbout20051272 Ver 2_401 Application_20080505JIMBLANCHARD AssooTES A PROFESSIONAL SERVICES COMPANY SOLJT:GNS `,WE 1936 SURVEYING, MAPPING & PLANNING ENGINEERING & DESIGN April 29, 2008 Jim Blanchard Associates P.O. Box 5 Kenansville, NC 28349 Mr. Chad Coburn Division of Water Quality 401 /Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 os -1a.01 a-NJ 2 MAY 200 DENk - GYP i t rYET MWANDSTURmWA7in ?c?I?'Ea ?1? rao? SUBJECT: Indian Grave Creek PCN Application, Duplin County. PA 11) Mr. Coburn, Please find enclosed seven copies of the Pre-Construction Notification Application Form and associated backup documentation for Indian Grave Creek Bank Stabilization, previously submitted to the Corps of Engineers for a 404 permit. I am also enclosing five copies of the project plans and a check in the amount of $570.00 for the project fee per our previous discussions. The project is located in town limits of Kenansville, Duplin County. This project previously had a DWQ Project # 05-1272. Project was previously submitted as a "Restoration" project and now is being resubmitted as a "Stabilization" project. The design submitted in 2005 created a meandering stream and was ultimately determined by the Kenansville Town Board to be inappropriate for the residential neighborhood. Therefore, the project is being resubmitted with the revised design focused on stabilization of the erosion areas that have the potential to damage utilities, roadbeds, and private property. Design is based on gabion gravity retaining walls to stabilize streambanks. If additional information or clarification is required, please feel free to contact me at (910) 271- 0613. Sincerely, ephen T. Blanchard, PE P.O. Box 5 Phone: 910.296.1921 Kenansville, NC 28349 Fax: 910.296.1922 ,? i .y ;? . . a'1 . ..rl + .?{ ABLAxmo AssocmTEs. A PROFESSIONAL SERVICES COMPANY sc!_ r;cri SINCE. 976 SURVEYING, MAPPING & PLANNING ENGINEERING & DESIGN January 31, 2008 Jim Blanchard Associates P.O. Box 5 Kenansville, NC 28349 Wilmington Regulatory Field Office U. S. Army Corps of Engineers P.O. Box 1890 Wilmington, NC 28402-1890 SUBJECT: Indian Grave Creek PCN Application, Duplin County. Gentlemen, Please find enclosed one copy of the Pre-Construction Notification Application Form for Indian Grave Creek Bank Stabilization. The application includes PCN form, Vicinity Map, Project Plans, and summary descriptions of erosion areas with photos. The project is located in town limits of Kenansville, Duplin County. This project previously received a 404 Permit on 13 Jan 2005, Action ID 200401273. Project was previously submitted as a "Restoration" project and now is being resubmitted as a "Stabilization" project. The design submitted in 2005 created a meandering stream and was ultimately determined by the Kenansville Town Board to be inappropriate for the residential neighborhood. Therefore, the project is being resubmitted with the revised design focused on stabilization of the erosion areas that have the potential to damage utilities, roadbeds, and private property. Design is based on gabion gravity retaining walls to stabilize streambanks. If additional information or clarification is required, please feel free to contact me at (910) 271- 0613. Sincerely, ,s Step en T. Blanchard, PE Phone: 910.296.1921 Fax: 910.296.1922 Office Use Only: Form Version March 05 USACE Action ID No. DWQ No. OS ` I Wi a. V Z (if any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) tA& PA it FY 1. Processing Nip Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: 13 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: r=3 II. Applicant Information D p 1. Owner/Applicant Information MAY 5 2008 QUAUTY lA 2 BRA Name: Town of Kenansville DW waT?? ma Mailing Address: P.O. Box 370 VYET1,&NM AMU Kenansville, NC 28349 &ttw- Lang, Telephone Number: 910 296 0369 Fax Number: 910 296 0707 E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Steve Blanchard, PE Company Affiliation: Jim Blanchard Associates Mailing Address: P.O. Box 5 Kenansville, NC 28349 Telephone Number: 910 296 1921 Fax Number: 910 296 1922 E-mail Address: steveAiimblanchardassociates.com Updated 11/1/2005 Page 5 of 13 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable snaps are provided. 1. Name of project: Indian Grave Creek Bank Stabilization 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): N/A 4. Location County: Duplin Nearest Town: Kenansville Subdivision name (include phase/lot number): N/A Directions to site (include road numbers/names, landmarks, etc.): I-40 to NC Hwy 24 Take Hwy 24 East to NC Hwy 50, turn left towards Kenansville on Hwy 50, go about I mile Lee Street will be on the right, project is at the end of Lee Street. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 34 deg 57'24.5" °N 77 deg 57'08.1" °W 6. Property size (acres): Approximately 493 LF of Streambank stabilization 7. Name of nearest receiving body of water: Tea Swamp 8. River Basin: Cape Fear (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.st ite.nc.tis/adinin/inaps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Residential, Streambank erosion threatening property Owner structures Updated 11/1/2005 Page 6 of 13 10. Describe the overall project in detail, including the type of equipment to be used: Streambank stabilization using gabion structures and storm water drainage piping. EQUiDment - Backhoe 11. Explain the purpose of the proposed work: Stabilize an existing streambank to prevent bank Migration and protect town citizens property. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Project previously received a 404 Permit on 13 Jan 05, Action ID 200401273, DWQ Project # 05-1272. Project was previously submitted as a "Restoration" project. The project objective has chanced and the scobe of work is now a "Stabilization" broiect. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Updated 11/1/2005 Page 7 of 13 The proposed impacts are installing 10 gabion structures along the creek bank at areas identified with moderate to significant bank erosion. Gabions will be gravity retaining wall structures with low level gabion weirs to reduce velocity. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain (yes/no) Distance to Nearest Stream (linear feet) Area of Impact (acres) Total Wetland Impact (acres) 3. List the total acreage (estimated) of all existing wetlands on the property: 1,200 LF of streambed. 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Number (indicate on map) Stream Name Type of Impact Perennial or I Intermittent? Average Stream Width Before Impact Impact Length (linear feet) Area of Impact (acres) AC1 Indian Grave Creek Perm; Gabion Intermittent 10' 24' .01 AC2 Indian Grave Creek Perm; Gabion Intermittent 5' 96' .01 AC3 Indian Grave Creek Perm; Gabion Intermittent 5' 60' .01 AC5 Indian Grave Creek Perm; Gabion Intermittent 5' 115' .01 AC6 Indian Grave Creek Perm; Gabion Intermittent 5' 45' .01 AC7 Indian Grave Creek Perm; Gabion Intermittent 5' 9' .01 AC8 Indian Grave Creek Perm; Gabion Intermittent 5' 27' .01 ACIO Indian Grave Creek Perm; Gabion Intermittent 10' 63' .01 AC12 Indian Grave Creek Perm; Gabion Intermittent 10' 9' .01 AC13 Indian Grave Creek Perm; Gabion Intermittent to, 45' .01 Total Stream Impact (by length and acreage) 493' 1 Updated 11/1/2005 Page 8 of 13 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill. excavation, dredaina. flooding, drainage, bulkheads. etc. Open Water Impact Site Number indicate on ma (p) Name Waterbody (if applicable) ) ap Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean etc. ) Area of Impact (acres) Total Open Water Impact (acres) 6. List the cumulative impact to all Waters of the U.S. resulting from the project Stream Impact (acres): 0.1 Wetland Impact (acres): Open Water Impact (acres): Total Impact to Waters of the U.S. (acres) Total Stream Impact (linear feet): 493' 7. Isolated Waters Do any isolated waters exist on the property? ? Yes ® No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Updated 11/1/2005 Page 9 of 13 Previous design submitted in 2005 created a meandering restoration stream. This design was rejected by the citizens due to the negative impacts on private property, the increase in stream cross section and the legal aspects of moving a stream that is a recognized property line. This plan adopted by the Town of Kenansville addresses the specific erosion areas of concern and is targeting resolving erosion problems that, left uncorrected could eventually damage water lines, sanitary sewer lines, road beds and buildings. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina (see DWQ website for most current version.). Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Updated 11/1/2005 Page 10 of 13 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://www.nceep.net/pages/inlieureplace.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ® No ? 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No Updated 11/1/2005 Page 11 of 13 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact Multiplier Required (sauare feet) Mititzation I 1 3 (2 for Catawba) 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel. Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. Project will not add any impervious area. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Proiect will not create anv sewage. XIIL Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No Updated 11/1/2005 Page 12 of 13 If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: Project will not increase development stream is in an established residential neighborhood. XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Updated 1111/2005 Page 13 of 13 (Agent's signature is valid only it an authonzarion letter trom the applicant is proviaea.) a r` 3f' ;z -Cem ';36.5 .;Cem 1 ' i ?/r' l r ` cn Trailer. Park Laco __? 91 C m _ w ?245? I yet Dunn i? l ' sewage eu i V\ ' i \ Drkposal 22.9 -- ?. I •?? G.t•o. 17 1R ----- - -- -- pTalr''` omtledge h 9- .j{- Ro i r Cern7 °- em. a u Smith b \?? '.V9T To,. r s / Jr High &k: ° n o em U ,96. 38.3 C 36. c Cent` I Oo 1 i ?? i •" f _ 38.5 Radio Prison! Dennis Hitanl o' o I -4ti? i ? Tower -- Cem , ? f 7i ct A i • ??1A I i Lm aw. •' Zv 0 JuBrA!c8W ASSOCIATES A PROFESSIONAL SERVICES COMPANY AC I SURVEYING MAPPING 8 PIANNING ENGINEERING 8 DESIGN CONDITION: Minor LOCATION: North Bank, downstream of 48" culvert PROPERTY OWNER: Mrs. Edna Brinson DESCRIPTION: Minor bank erosion at end of rock armor. STABILIZATION: Small Gravity Gabion Wall, Step Pool Structure JuBLOCHMD AssocwES AC2 A PROFESSIONAL SERVICES COMPANY SURVEYING MAPPING &PLANNING ENGLNFER ING & DFSIGN CONDITION: Major LOCATION: North Bank, Near Greenhouse PROPERTY OWNER: Mrs. Edna Brinson DESCRIPTION: Major Bank Erosion, Probably Created by Fallen Tree STABILIZATION: Medium Gravity Gabion Wall, Restore Creek Alignment JW BL4NC ASSOCIATES A PROFESSIONAL SERVICES COMPANY AC3 SURVEYING MAPPING A PLANNING ENGINEERING & DESIGN CONDITION: Major LOCATION: North and South Bank, Church Drainage Ditch PROPERTY OWNER: Mrs. Edna Brinson Woodrow Brinson Heirs Kenansville Baptist Church DESCRIPTION: Major Bank Erosion STABILIZATION: Medium Gravity Wall Gabion, Restore Creek Alignment, Realign Church Ditch, Step Pool Structure JJMBAKHm AssocIATEs A PROFESSIONAL SERVICES COMPANY AC5 SURVEYING, MAPPING 8 PLANNING ENGINEERING & DESIGN CONDITION: Major LOCATION: South Bank, Outlaw Outbuilding PROPERTY OWNER: Mr. Woodrow Outlaw DESCRIPTION: Major Bank Erosion STABILIZATION: Medium Gravity Gabion Wall, Restore Creek Alignment AJIM&MCHAM ssocmTEs A PROFESSIONAL SERVICES COMPANY AC6 SURVEYING. MAPPING & PLANNING ENGINFF'RING 8 DESIGN CONDITION: LOCATION: PROPERTY OWNER: DESCRIPTION: Minor South Bank, Brinson Outbuilding Mrs. Pat Brinson Minor Bank Erosion, Undercut STABILIZATION: Medium Gravity Gabion Wall AC7 ?lm&mgKw ASSOGATES A PROFESSIONAL SERVICES COMPANY SURVEYING MAPPINGS PLANNING ENGINFERING 8 DESIGN CONDITION: Minor LOCATION: South Bank, Brinson Property PROPERTY OWNER: Mrs. Pat Brinson DESCRIPTION: Minor Bank Erosion, Vertical Cut STABILIZATION: Medium Gravity Gabion Wall, Reshape Channel Cross Section, Step Pool Structure "'a: • ? 1v ° r ? Mud i AC8 JIMBLOCIA0 AssocmTEs A PROFESSIONAL SERVICES COMPANY SURVEYING. MAPPING & PANNING ENGINEERING & DESIGN CONDITION: LOCATION: PROPERTY OWNER: DESCRIPTION: STABILIZATION: Major South Bank, Brinson Pecan Tree Mrs. Pat Brinson Major Bank Erosion, Undercut Medium Gravity Gabion Wall a y t sN 4.I ,+x'15 c r Ar .w A t rr i 4? ..ems.. AC I 0 JIMBL_A_NCHMD ASSOCIATES A PROFESSIONAL SERVICES COMPANY SURVEYING, MAPPING 8 PLANNING ENGINEERING & DESIGN CONDITION: Major LOCATION: South Bank, Across From Ben Williamson Jr. Property PROPERTY OWNER: Town of Kenansville Mrs. Pat Brinson DESCRIPTION: Major Bank Erosion, Threatening Damage to Sanitary Sewer and Lee St. STABILIZATION: Restore Bank, Medium Gravity Gabion Wall, Restore Creek Alignment ,t" x! q{. s ?_ AC12 JIMBLANCi ASSOCIATES A PROFESSIONAL SERVICES COMPANY SURVEYING MAPPING B PLAN ING ENGINEERING B DESIGN CONDITION: Major LOCATION: South Bank, Across From Thurman Brown Property PROPERTY OWNER: Town of Kenansville Mrs. Hortense Hasty DESCRIPTION: Major Bank Erosion, Threatening Damage to Sanitary Sewer and Lee St. STABILIZATION: Restore Bank, Medium Gravity Gabion Wall, Restore Creek Alignment, Step Pool Structure arq t w ? ? ? lh fir, JR4 kr t+ 4 yN : •i5? jP?L t vyAaF` A #roµ 4 # r t S ? ?q{ .. .+}e.t? -ai'7 ca4 _ ?" , _3 'tiTMY J. .. 1. N. e. 9?.'? .. X ?i ] A. °A?q,P?.. d .. w _ ? _ .. r...?,?f ,A"". ?.' x 1Y.Y.? .i. -,. .... ,r?'S. AC 13 JYBAC840 Assoc,IATES A PROFESSIONAL SERVICES COMPANY SURVEYING MAPPINGS Pt ANNING ENGINFERING 8 DESIGN CONDITION: Major LOCATION: South Bank, Hortense Hasty Property PROPERTY OWNER: Mrs. Hortense Hasty DESCRIPTION: Major Bank Erosion, Threatening Damage to Sanitary Sewer and Lee St. STABILIZATION: Restore Bank, Medium Gravity Gabion Wall, Restore Creek Alignment i p p