April 28, 2008
DWQ# 08-0722
Mecklenburg County
Mr. Barry Shearin
Charlotte/Mecklenburg Utilities
5100 Brookshire Blvd.
Charlotte, NC 28216
Subject: Southwest Water Phase C, Charlotte
APPROVAL of 401 Water Quality Certification with Additional Conditions
Dear Mr. Shearin:
You have our approval, in accordance the general certification and those conditions listed below, to
impact 60 linear feet (If) of stream to (Walker Branch and tributary) in order to construct the project in
Mecklenburg County, as described in your application received by the Division of Water Quality (DWQ) on April
25, 2008. After reviewing your application, we have determined that this project is covered by Water Quality
General Certification Number 3699, which can be viewed on our web site at
http://h2o.enr.state.nc.us/ncwetlands. The General Certification allows you to use Nationwide Permit Number
12 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other
federal, state or local permits before proceeding with your project, including those required by (but not limited
to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations.
The above noted Certification will expire when the associated 404 permit expires unless otherwise
specified in the General Certification. This approval is only valid for the purpose and design that you described
in your application. If you change your project, you must notify us in writing, and you may be required to send
us a new application for a new certification. If the property is sold, the new owner must be given a copy of the
Certification and approval letter; and is thereby responsible for complying with all conditions.
In addition to the requirements of the certification, you must also comply with the following conditions:
The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas
has commenced.
2. All wetlands, streams, surface waters, and riparian buffers located on the project site where impacts are
not allowed shall be clearly marked (example- orange fabric fencing) prior to any land disturbing activities.
3. Use of native vegetation and other soft stream bank stabilization techniques must be used where
practicable instead of riprap or other bank hardening methods. If riprap is necessary, its use shall be
minimized to the maximum extent practicable.
4. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the
footprint of the impacts depicted in the Preconstruction Notification application. All construction activities
associated with this project shall meet, and/or exceed, those requirements specified in the most recent
version of the North Carolina Sediment and Erosion Control Manual and shall be conducted so that no
violations of state water quality standards, statutes, or rules occur.
"o?e
NhCarolina
Ntilumlly
North Carolina Division of Water Quality 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone (704) 663-1699 Customer Service
Internet: ncwaterqulaity.org FAX (704) 663-6040 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper
5. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent
practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable,
they shall be removed and the natural grade restored within two months of the date the Division of Land
Resources has released the project.
6. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of
Completion" form to the 401/Wetlands Unit of the NC Division of Water Quality
Continuing Compliance. The applicant (Charlotte/Mecklenburg Utilities) shall conduct all activities in a
manner so as not to contravene any state water quality standard (including any requirements for
compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of state
and federal law. If DWQ determines that such standards or laws are not being met (including the failure to
sustain a designated or achieved use) or that state or federal law is being violated, or that further
conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification to
include conditions appropriate to assure compliance with such standards and requirements in accordance
with 15 A NCAC 2H.0507(d). Before codifying the certification, DWQ shall notify the applicant and the US
Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503, and provide
opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall
be provided to the applicant in writing, shall be provided to the United States Army Corps of Engineers for
reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become
conditions of the 404 Permit for the project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing.
You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written
petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final
and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act.
If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-663-
1699 or Ms. Cyndi Karoly in the Central Office in Raleigh 919-733-9721.
Sincerely,
e- ?/ /S -
for Coleen H. Sullins
Attachment
cc: Army Corps of Engineers, Asheville
Ian McMillan, Wetlands Unit
MRO, Land Quality
Central Files
File Copy
Tommy Cousins, Kimley-Horn, 4651 Charlote Park Dr., Ste. 300, Charlotte, 28217
Certificate of Completion
DWQ Project No.
County:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules,
and any subsequent modifications, the applicant is required to return this certificate to the
401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh,
NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized
agent, or the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature:
Date:
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
1, , as a duly registered Professional
(i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been
authorized to observe (periodically, weekly, full time) the construction of the project, for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans
and specifications, and other supporting materials.
Signature: Registration No.: Date: