Loading...
HomeMy WebLinkAbout20080394 Ver 1_Approval Letter_20080428\o??r V r cgQG Caw Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality April 28, 2008 DWQ# 08-0394 Cabarrus County Mr. Lindsey McAlpine McAlpine Group, LLC 1329 East Morehead St. Charlotte, NC 28204 APPROVAL of 401 Water Quality Certification and Isolated Wetlands Permit with Additional Conditions Dear Mr. McAlpine: You have our approval, in accordance with the attached conditions, to place permanent fill in 0.36 acre of isolated wetlands in order to develop the site at the intersection of Highway 73 and Macedonia Church Road in Cabarrus County, as described in your application received by the Division of Water Quality on February 27, 2008. After reviewing your application, we have determined that this fill is covered by the State General Permit for Impacts to Isolated Wetlands and Isolated Waters (IWGP100000). Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter; and is thereby responsible for complying with all conditions. In addition to the requirements of the certification, you must also comply with the following conditions The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas has commenced. 2. Storm water discharge structures at this site shall be constructed in a manner such that the potential receiving streams (of the discharge) will not be impacted due to sediment accumulations, scouring or erosion of the stream banks. 3. Prior to construction, a final, written storm water management plan (including a signed and notarized Operation and Maintenance Agreement) shall be submitted to the 401 Oversight and Express Permitting Unit (2321 Crabtree Blvd., Suite 250, Raleigh, NC, 27604 or local governing authority) within 60 days of the issuance of the 401 Water Quality Certification. The storm water management plans shall be approved in writing by this Office (or local delegated authority, copy of plan and approval letter submitted to DWQ). You have the option of using the Express Reyjew Program for expedited approval of these plans If you propose to use the Express Revie Not ""Carolina alura!!Y North Carolina Division of Water Quality 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone (704) 663-1699 Customer Service Internet: ncwaterqulaity org FAX (704) 663-6040 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Program, remember to include the appropriate fee with the plan. The storm water management plan must include construction plans, specifications, storm water BMP worksheets, and supporting calculations. The storm water best management practices are required to be appropriate for the surface water classification and designed to remove at least 85% TSS according to the most recent version of the NC DENR Storm water Best Management Practices Manual. These facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality. Also, before any permanent building is occupied at the subject site, the facilities (as approved by this Office or local delegated authority) shall be constructed and operational, and the storm water management plan (as approved by this Office or local delegated authority) shall be implemented. The structural storm water practices as approved by this Office as well as drainage patterns must be maintained in perpetuity. No changes to the structural storm water practices shall be made without written authorization from the Division of Water Quality. 4. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Preconstruction Notification application. All construction activities associated with this project shall meet, and/or exceed, those requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual and shall be conducted so that no violations of state water quality standards, statutes, or rules occur. 5. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within two months of the date the Division of Land Resources has released the project. 6. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of Completion" form to the 401/Wetlands Unit of the NC Division of Water Quality. 7. Continuing Compliance. The applicant (McAlpine Group, LLC) shall conduct all activities in a manner so as not to contravene any state water quality standard (including any requirements for compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of state and federal law. If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15 A NCAC 2H.0507(d). Before codifying the certification, DWQ shall notify the applicant and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503, and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to the applicant in writing, shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-663-1699 or Ms. Cyndi Karoly in the Central Office in Raleigh 919-733-9721. Sincerely, / /? I/"-- for Coleen H. Sullins Attachments cc: Army Corps of Engineers, Asheville Ian McMillan, Wetlands Unit Cabarrus County Sediment/Erosion Central Files File Copy Renee Gallimore, ESP Assoc. Certificate of Completion DWQ Project No. Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: County: Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: If this project was designed by a Certified Professional Date: I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No.: Date: