Loading...
HomeMy WebLinkAbout20080398 Ver 1_Staff Comments_20080425RE: Peddler's Square 08- 03'0 Subject: RE: Peddler's Square From: "Patrick Bradshaw" <pbradshaw@civildesignconcepts.com> Date: Fri, 25 Apr 2008 14:25:18 -0400 To: "Annette Lucas" <Annette.Lucas@NCMail.net> Thanks Annette - We will be back in touch. Thanks Patrick Bradshaw, P.E. obradshaw@civildesianconce-ots.com Civil Design Concepts, P.A. Waynesville Office 1210 S. Main Street Waynesville, NC 28786 Tele: (828) 452-4410 Fax: (828) 456-5455 Privileged and Confidential: The information contained in this email message and any attachments is confidential information intended only for the use of individuals or entities named above. If the reader of this message is not the intended recipient you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this email in error, please notify us immediately by email at the originating address. -----Original Message----- From: Annette Lucas (mailto:Annette. Sent: Friday, April 25, 2008 2:13 PM To: Patrick Bradshaw Subject: Peddler's Square Patrick, Here are the comments that I sent out regarding the stormwater plan for Peddler's Square: 1. The DWQ does not recommend the use of three separate stormwater wetlands in series due to the risk of embankment failure between the systems. If possible, please combine the three stormwater wetlands into a single, properly designed stormwater wetland. This may involve reconfiguring the wetland so that the stormwater does not undergo such a significant elevation change as it flows through the wetland. 2. Please provide a soils report that verifies that the level of the seasonal low water table is at 2940.0 fmsl. If the water table is truly at that level, wetland number three will need to be redesigned because the embankment elevation at the outlet of this wetland is only at approximately 2937.75 fmsl. 3. The proposed orifice diameter of eight inches is oversized and will result in a drawdown rate of much less than two days. Please resize the orifice for a two to five day drawdown rate. 4. The planting plan that has been provided does not meet the requirements listed in Item 4 of the Required Items Checklist. Please provide a planting plan at a 1" = 20' scale that shows the Lucas@NCMail.netl 1 of 2 4/28/2008 11:17 AM RE: Peddler's Square sizes, spacing and locations of plantings, the total quantity of each type of plant specified, a planting detail, the source nursery for plants, as well as fertilizer and watering requirements to establish vegetation. 5. Please provide an up to date Wetland Operation and Maintenance Agreement (available at: http://h2o.enr.state.nc.us/su/bmp fora*„s.htm). This form must be signed and notarized. Let me know if you have questions. Annette 2 of 2 4/28/2008 11:17 AM