Loading...
HomeMy WebLinkAbout20052212 Ver 2_Approval Letter_20080423. o` `"i ~ ~z,~ C, iT~" } ,-i p ~' Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality Apri123, 2008 Jackson County DWQ Project No. 052212V.2 US Highway 64 (Climbing Lanes) APPROVAL of 401 Water Quality Certification with Additional Conditions Mr. J. B. Setzer, P.E. Division 14 Engineer N C Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Dear Mr. Setzer: You have our approval, in accordance with the attached conditions and those listed below, for the following impacts in an unnamed tributary to the Horsepasture River, in order to construct new climbing lanes as part of US Highway 64 in Jackson County: Stream Im acts in the Savannah River Basin Site Permanent Stream Protection Permanent Fill in Temporary Total Stream Stream Fill in in Perennial Perennial Stream Dewatering in Impact Impacts Intermittent Stream (linear ft) (linear ft) Perennial Stream (linear ft) Requiring Stream (linear .Energy Dissipator (linear ft) Mitigation ft linear ft Site 1 0 0 25 0 25 0 Site 2 0 40 0 0 40 0 Total 0 40 25 0 65 0 Total Stream Permanent Impact for Project: 651inear feet. The project should be constructed in accordance with your application dated March 17, 2008 (received March 20, 2008), including the environmental commitments made in the application letter. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification Nos. 3704 and 3688, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Numbers 14 and 33. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. Please note that new 401 Water Quality Certifications went into effect on November 1, 2007. These Certifications contain additional requirements that were not in the old certifications. You are strongly urged to review these new certifications (attached) and become familiar with their requirements. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. NorthCarolina JVaturalfy North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Phone (828) 296-4500 Customer Service Internet: www.ncwaterquality.org FAX (828)299-7043 ]-877-623-6748 An Equal OpportunitylAffirmative Action Employer Mr. J. B. Setzer, P.E. Apri123, 2008 Page Two 1. This modification is applicable only to the additional proposed activities associated with the construction of climbing lanes on US Highway 64, east of Cashiers, Jackson County. All authorized activities and conditions of the certification associated with the original Water Quality Certification dated January 11, 2006 still apply except where superseded by this certification. 2. Construction of the culvert extension and energy dissipater shall not be conducted in flowing water. This construction shall be sequenced to temporarily route this unnamed tributary to the Horsepasture River through a diversion channel or other best management practice described in NCDOT's Construction and Maintenance Activities manual to prevent construction in flowing water. 3. There shall be no excavation from or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. 4. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored upon completion of the project. 5. Adequate sedimentation and erosion control measures must be installed and maintained on the project site to minimize sediment transport to downstream aquatic resources. Temporary cover (wheat, millet or similar annual grain) or permanent herbaceous cover shall be planted on all bare soil as soon as possible following ground disturbing activities. Erosion control mating shall be used in conjunction with appropriate seeding on disturbed soils in steep slope and riparian areas. Matting should be secured in place with staples or wherever possible, live stakes of native trees. Straw mulch and tall fescue shall not be used in riparian areas. 6. If multiple pipes or barrels are required, they shall be designed to mimic the natural stream cross section as closely as possible including pipes or. barrels at flood plain elevation and/or sills where appropriate. Widening the stream shall be avoided. Stream channel widening at the inlet or outlet end of structures typically decreases water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage. 7. For projects impacting waters classified by the NC Environmental Management Commission as Trout (Tr), High Quality Waters (HQW) or Water Supply I or II (WS-I, WS-II), stormwater shall be directed to vegetated buffer areas, grass-lined ditches or other means appropriate to the site for the purpose of pre-treating stormwater runoff prior to discharging directly into streams. Mowing of existing vegetated buffer areas is strongly'discouraged. 8. Native riparian vegetation (e.g. rhododendron, dog hobble, willows, alders, sycamores, dogwoods, black walnut and red maple) must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 9. The use of riprap above the Normal High Water Mark shall be minimized. Any riprap placed. for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. 10. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage. Bioengineering boulders or structures should be properly designed, sized and installed. 11. Heavy equipment shall be operated from the banks rather than in the stream channels in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. 12. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 13. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. 14. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 15. No rock, sand or other materials .shall be dredged from the stream channel, except where authorized by this certification. 16. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification. Mr. J. B. Setzer, P.E. Apri123, 2008 Page Three 17. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site project manager. 18. The issuance of this certification does not exempt the Permittee form complying with any and all statutes, rules, regulations or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 19. The Permittee shall report any violations of this certification to the Division of Water Quality within 24-hours of discovery. 20. Upon completion of the project, the NCDOT Division Engineer shall complete and return the enclosed "Certificate of Completion Form" to notify NCDWQ when all work included in the §401 Certification has been completed. This form shall be returned to the Transportation Permitting Unit of the NC Division of Water Quality, 2321 Crabtree Blvd., Suite 250, Raleigh, North Carolina 27604. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Mike Parker of the Asheville Regional Office at 828.296.4500. Sincerely, ~'^"Coleen H. Sullins, Director Division of Water Quality cc: Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental David Baker, USACE, Asheville Field Office Transportation Permitting Unit Mike Parker, Asheville Regional Office 052212V.2 (Setzer) US Highway 64 Climbing Lanes