HomeMy WebLinkAbout20071579 Ver 1_Stormwater Info_20080422 (24)1 1 1 1 1 Dq- l5 1q STORMWATER NARRATIVE AND SUPPORTING CALCULATIONS Loi kii i NORTH CAROLINA CENTER FOR AUTOMOTIVE RESEARCH North Carolina Center for Automotive Research Garysburg, Northampton County, North Carolina April 2008 Prepared for: NCCAR, Inc. Prepared By: LTG ANDS ?N S"+t F th'r 46 e4 4 .44*,?NFIOW&CREED 1730 Varsity Drive Raleigh, North Carolina 27606 Phone: (919) 233.8091 Fax: (919) 233.8031 M&C Project No. 04921-0003 ?H 4?\ "9y °•e,?GiN 40'*,,+??k f f f t Ca v MCKW&CREED v PROJECT DESCRIPITON ' The purpose of the North Carolina Center for Automotive Research (NCCAR) is to construct a non-profit facility to meet the ever-evolving product research, testing and development demands of the automotive industry. NCCAR is designed to provide real-world vehicle testing capability that will enable its clients to apply research to improve vehicular performance, efficiency and safety. ' These goals will be achieved through the development of several main components. The site will feature a 4.2 mile Ride and Handling course, two vehicle dynamics areas, multiple test laboratories, client garages, a refueling station and operations and administrations buildings. Collaboratively, these elements will provide a world-class center that will allow engineers to ' evaluate and develop new vehicles and prove out new systems in the controlled environment of a test facility. ' SITE DESCRIPTION The existing site is a 619 acre tract located in Northampton County, northwest of Garysburg, 1 North Carolina. A site delineation of 404 wetlands was performed by Land Management Group, Inc. and was approved in the field by the U.S. Army Corps of Engineers. As approved, the site contains approximately 140 acres of freshwater wetlands, most of which are headwaters of the ' Roanoke River. These unnamed tributaries of Arthur's Creek form nearly the entire perimeter of the site. These tributaries converge in the southern portion of the site and flow into Arthur's Creek (Stream Classification C) and eventually into the Roanoke River. The North Carolina Division of Water Quality implements no watershed development or discharge restrictions for Class C water bodies. The tract has elevations ranging from 150' to 105', generally sloping from north to south. Slopes ' on the site average 1-2% in most directions, but intensify near the edges of the wetlands. SOILS 1 According to the Northampton County Generalized Soil Survey, the majority of uplands within the site are classified as Bonneau sandy loam and Caroline fine sandy loam. Interspersed are ' small pockets of Craven fine sandy loam, Goldsboro sandy loam and Norfolk sandy loam. Soils along major stream channels consist of Wehadkee loam. Bethera silt loam and Roanoke silt loam are located in wetland areas further upstream. ' A subsurface exploration report has been performed by S&ME, Inc. Through soil test borings ranging from 10 to 60 feet, the following was found in the existing soils: A. Topsoil depths range from 4 to 18 inches deep. B. Highly plastic clayey silts and silty clays extend below the topsoil in depths ranging from 5 to 15 feet. C. Low plasticity silty and sandy clays were found beneath highly plastic soils. ' D. Groundwater levels were recorded at approximate depths of 3.5 to 19 feet below existing ground elevations. n S&ME, Inc. concludes that, based on drought conditions in North Carolina at the time of drilling, measured groundwater levels are likely to rise as more normal rainfall patterns return. The soils ' report also concludes that generally, field measured soils patterns generally align with those found the Northampton County Generalized Soil Survey Map. A second S&ME, Inc. report has also been performed to determine the seasonally high water table depths in the areas of proposed stormwater BMPs. As found at most locations, the SHWT is found within 6" of the existing ground surface. STORMWATER IMPROVEMENTS This project will provide stormwater management based on the guidelines set forth in the North ' Carolina Divions of Water Quality's Stormwater Best Management Practices Manual. As the site spans approximately 619 acres, a large portion of the site will remain undisturbed. ' Based solely on impervious areas in relation to the site acreage, the site can be classified as low density according to the "BMP Manual" in that the total impervious area for the site is less than 24%. (See attached table for impervious area breakdown) 4,705,966sf *100%=17.5% 26,963,640sf ' Also, a drainage area breakdown as required by SWU-101 shows that several individual drainage areas will be classified as high density based upon the amount of impervious surfaces within ' those watersheds. Further analysis of drainage areas shows that, due to the large amount of wetlands on the site, some areas in low density drainage areas will require discrete stormwater management devices. Likewise, not all watersheds in high density drainage areas will require ' discrete stormwater management devices. To simplify, each drainage area is broken down individually respective of possible wetland impacts and to justify our conclusions for each watershed. 1 Drainage Area # 1 As shown on the attached table, the proposed impervious area in drainage area #I equates to only approximately 8.70% over the drainage area. Therefore, this meets the low density impervious percentage requirement. Also, due to the nature of the construction, stormwater ' runoff will be directed into the wetland areas by means of non-erosive flow which would not be detrimental to the existing wetlands. Drainage Area #2 As shown on the attached table, the proposed impervious area is approximately 8.55% of the total drainage area. For overall project aesthetics, an amenity pond will be located on the ' north side of the Security Kiosk. During rain events, stormwater runoff from the north side main road will be directed into the pond to recharge water levels. To keep the pond hydrated during dry periods, the pond bottom will be cut into existing grade where the seasonally high water table is located less than 6" below existing ground surface, as located by S&ME, Inc. This pond will be an amenity only and is not to serve as or to be permitted as a stormwater quality device as defined by DWQ. During large storm events, an overflow device is designed to safely pass runoff without negatively impacting downstream wetlands. A fountain will be provided and the ' pump designed according to the guidelines in section 10.3.10 of the BMP manual to ensure the health of pond in drought periods. This pond will be maintained in accordance with the attached Operations and Maintenance Agreement. Drainage Area #3 As shown on the attached table, drainage area #3 will contain 4.87% impervious area. This drainage area meets the impervious area requirements set forth by DWQ to qualify as low density. All stormwater runoff will be directed into wetland areas by means of sheet flow and will pass through a 30' vegetated filter. Drainage Area #3 will not require a discrete stormwater management device. Drainage Area #4 As shown on the attached table, drainage area #4 will only contain approximately 8.86% impervious area. Based solely on impervious area, this drainage area qualifies as a low density area. However, a quick glance might suggest that the amount of wetlands in this area far outnumbers upland areas. Upon further analysis, the amount of wetlands does create a couple ' of distinctive watersheds. On the far west of the site and west of the largest wetlands area is where the Emissions and Fuel Cell Labs are located. The total impervious surface in this "pocket" is 4.60 acres, compared to 36.07 acres of non-impervious area. Thus, only 12.7% impervious 1 surface area and no need for a BMP. Similarly, in the northern part of this drainage area, an uplands "pocket" sites the proposed engine combustion lab. The total area of the uplands pocket is 13.22 acres whereas the impervious area is 2.18 acres. This equates to 16.5% impervious and no need for a BMP. The conclusion is that the drainage area #4 will not require a discrete stormwater management device. Drainage Area #5 1 As shown on the attached table, drainage area #5 will contain no impervious area. The only development within this watershed will be as a result of grading from construction of either the Fuel Cell or Emissions Labs. No impervious surface is planned for drainage area #5. Therefore, a discrete stormwater management device will not be required. Drainage Area #6 ' As shown on the attached table, drainage area #6 will contain approximately 3.80% impervious area. The impervious area will be from the north part of the Large VDA. As the roadway loops, most of the area will remain as pervious surfaces, thus eliminating the need for a BMP. Drainage Area #7 ' As shown on the attached table, drainage area #7 will contain approximately 2.03% impervious area. Much like Drainage Area #6, the impervious area in Drainage Area #7 will be from the northern loop of the Large VDA. All of the runoff from the main portions of the Large VDA will be directed into Drainage Areas #8 and #9 and treated as needed in these areas. Therefore, Drainage Area #7 will not require a BMP. Drainage Area #8 As shown on the attached table, drainage area #8 will contain approximately 40.951% impervious area. Based on regulations, drainage area #8 will require a BMP. Based on proposed grades in relation to natural drainage patterns, at least one BMP will be designed per Phase II guidelines as set forth in the BMP Manual. ' Drainage Area #9 As shown on the attached table, drainage area #9 will contain approximately 27.87% impervious area. Based on regulations, drainage area #9 will require a BMP. Due to the amount of wetlands throughout the watershed, several separated areas of uplands exist. The proposed Large VDA will contribute approximately 25.22 acres of impervious area into the drainage area. ' As proposed grades in relation with existing drainage patterns dictate, 2 BMPs will provide stormwater management. As the Client Garage A is situated within a pocket of wetlands, a BMP will be required to protect the wetlands from adverse affects from concentrated runoff. The proposed ride & handling course in this drainage area contributes approximately 3.26 acres of impervious area. Compared to the total drainage area from the area (36.69 acres), the impervious area is only 10% of the entire area. As required, all stormwater runoff from this area will be directed into wetland areas by sheet flow and through a minimum 30' vegetated buffer. Drainage Area # 10 As shown on the attached table, drainage area # 10 will contain approximately 21.77% impervious area. Though overall impervious surface area requirements are met, a BMP will be designed to provide stormwater management for a large portion of the area. Some of the Ride & Handling course portions are to be designed as low density areas, and as required, all stormwater runoff will be directed into wetlands areas by sheet flow and through a minimum 30' vegetated buffer. Most of the impervious areas will drain into one of two designed wet detention ponds that will provide water quality treatment as well as quantity control for the 1-yr, 24-hr storm as required. Runoff from the proposed operations, engineering & client garages (phase 1) building will provide an insignificant amount of runoff into the wetlands based on the adjacent drainage area, thus no BMP will be provided. A similar situation exists for Drainage Area #11 (see below). Much of Drainage Area # 10 naturally drained to an isolated wetland pocket. As required by the project, and if approved, this area will be filled and most of the area will drain as an addition to Drainage Area # 10. Drainaae Area #I 1 As shown on the attached table, drainage area # 1 1 will contain approximately 2.13% impervious area. Therefore, no BMP will be provided in this area. All impervious areas resulting from the construction of the Administration and Operations Building and associated parking areas will be directed into wetland areas by sheet flow. ' MAINTENANCE CONSIDERATIONS The property owner, NCCAR, Inc. shall be responsible for periodic inspection and maintenance of all permanent indicated stormwater devices. Any measure that fails to function as intended shall be repaired immediately. CALCULATIONS Calculations are included in this package. 1 Impervious Area Description Impervious Area (sq. ff.) Security Kiosk 485 Operations, Engineering & Client Garages (Phase 1) 15,435 Operations, Engineering & Client Garages Parking/Driveway Phase 1 52,835 Ride and Handling Course 1,079,411 Covered Parking Lots 28,050 Covered Parking Lots Drive Area 108,442 Event Parking 65,280 Fueling Station 9,350 Fueling Station Parking 12,856 Maintenance & Dry Storage Building 3,150 Maintenance & Dry Storage Building Parking 13,144 Operations, Engineering & Client Garages (Phase 2) 33,609 Operations, Engineering & Client Garages Parking/ Driveway Phase 2 150,842 CD lab 9,800 CD Lab Parking 6,150 Small Vehicle Dynamics Area 401,805 Large Vehicle Dynamics Area 1,842,704 Large VDA Labs 18,700 Large VDA Labs Parking 19,166 Emissions Lab 45,024 Emissions Lab Parking 42,864 Fuel Cell Lab 39,744 Fuel Cell Lab Parking 42,733 Engine Combustion Lab 45,024 Engine Combustion Lab Parking 34,545 Client Garage A 31,414 Client Garage A Parking 57,777 1 Client Garage B 31,414 Client Garage B Parking 57,458 Roadway 407,135 Total 4,715,316 i f SITE i k i r` 'Boundaries are approximate and are not meant to be absolute. SCALE 1" = 1 Mile Map Source: North Carolina Atlas & Gazetteer. Pg 22-23.2003 NCCAR Project Land Management Group, Inc. Environmental Consultants FI ure 1. Vicinit Ma Northampton County, NC Wilmington, N.C. 9 y p September 2007 tl? U- f . tl , SCALE 1" = 1200' NCCAR Project Northampton County, NC Land Management Group, Inc. Environmental Consultants Wilmington, N.C. September 2007 Figure 2. USGS Topo a6 r NOA CaA Cab ftzz. 14. _c$_ x CaB Wr ? i 'N f _ P - .. c QA e- Land Management Group, Inc. NCCAR Project Environmental Consultants Figure 3. NRCS Soils Map Northampton County, NC Wilmington, N.C. September 2007 Land Management Group, Inc. NCCAR Project Environmental Consultants Northampton County, NC Wilmington, N.C. September 2007 Figure 4. 1998 NAPP Aerial Photograph ' BMP #1 Type// 24-hr Rainfall=2.81 " Prepared by McKim & Creed, PA HydroCADO 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/18/2008 ' Subcatchment 1S: BMP #1 - Pre-Development Runoff = 24.04 cfs @ 13.35 hrs, Volume= 6.264 af, Depth> 0.76" ' Runoff by SCS TR-20 method, UH=SCS, Time Span= 1.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr Rainfall=2.81" ' Area (ac) CN Description 99.110 74 Pasture/grassland/range, Good, HSG C 99.110 Pervious Area Tc Length Slope Velocity Capacity Description ' (min) (feet) (ft/ft) (ft/sec) (cfs) 38.0 250 0.0100 0.11 Sheet Flow, Grass: Dense n= 0.240 P2= 3.40" 68.3 2,868 0.0100 0.70 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 106.3 3,118 Total 1 L 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 N i Z N N C d E Q _O d d L IL 1 T - U CL U m J J N r o ++ d E O V o ? Q cn U 0 a- o O a N ? U N rn 06 ? O E° U CD -000 a° U Q 0 a) '0 O C 7 N I m a. 2 N M N N N r N I O N r CC) r ti r O r LO r h ? U r ? L O L m a rO L S O `~ CN 4) _ m me O N zo Bo _ o ? Cfl 1` ? 4M (2 n M co . ? 00 M =1 0 Q ?.r ?t N L 0 0 O M N Q > _ 0 O O ?M 0 v Z M U. co N r co 4. N O a0 O "t N O co O N O N N N N r r r r r (SM M01=1 BMP #1 Type// 24-hr Rainfall=2.81 " Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/18/2008 Subcatchment 2S: BMP #1 - Post - Development Runoff = 43.05 cfs @ 13.33 hrs, Volume= 10.351 af, Depth> 1.25" Runoff by SCS TR-20 method, UH=SCS, Time Span= 1.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr Rainfall=2.81" Area (ac) CN Description 35.910 98 Paved parking & roofs 63.200 74 >75% Grass cover, Good, HSG C 99.110 83 Weighted Average 63.200 Pervious Area 35.910 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.5 100 0.2000 0.30 Sheet Flow, Grass: Dense n= 0.240 P2= 3.40" 102.9 5,070 0.0030 0.82 Shallow Concentrated Flow, Grassed Waterwav Kv= 15.0 fDs 108.4 5,170 Total u BMP #1 Type// 24-hr Rainfall=2.81" Prepared by McKim & Creed, PA HydroCADB 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/18/2008 Pond 3P: BMP #1 - Pond Design 1 Inflow Area = 99.110 ac, Inflow Depth > 1.25" Inflow 43.05 cfs @ 13.33 hrs, Volume= 10.351 of Outflow = 23.78 cfs @ 14.29 hrs, Volume= 6.459 af, Atten= 45%, Lag= 57.6 min Primary = 23.78 cfs @ 14.29 hrs, Volume= 6.459 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 109.52'@ 14.29 hrs Surf.Area= 1.687 ac Storage= 4.597 of Plug-Flow detention time= 202.9 min calculated for 6.445 of (62% of inflow) Center-of-Mass det. time= 99.0 min ( 1,011.2 - 912.1 ) ' Volume Invert Avail.Stora a Stora -ge Description #1 106.50' 7.272 of Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (acres) (feet) (acre-feet) (acre-feet) (acres) 106.50 1.316 1,106.0 0.000 0.000 1.316 107.00 1.444 1,137.0 0.690 0.690 1.444 108.00 1.523 1,156.0 1.483 2.173 1.528 109.00 1.604 1,175.0 1.563 3.736 1.613 110.00 1.765 1,772.0 1.684 5.420 4.827 111.00 1.940 2,379.0 1.852 7.272 9.430 ' Device Routing Invert Outlet Devices #1 Primary 105.00' 30.0" x 70.0' long Culvert X 2.00 RCP, square edge headwall, Ke= 0.500 Outlet Invert= 104.50' S= 0.0071 '/' Cc= 0.900 n= 0.013 #2 Device 1 106.50' 6.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 108.65' 60.0 deg x 1.0' long x 0.45' rise Sharp-Crested Vee/Trap Weir ' C= 2.53 #4 Device 1 109.10' 4.00' x 7.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 #5 Secondary 109.60' 35.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=23.76 cfs @ 14.29 hrs HW=109.52' (Free Discharge) L1=Culvert (Passes 23.76 cfs of 85.39 cfs potential flow) 2=Orifice/Grate (Orifice Controls 1.84 cfs @ 7.99 fps) 3=Sharp-Crested Vee/Trap Weir (Orifice Controls 2.13 cfs @ 3.75 fps) =Orifice/Grate (Weir Controls 19.79 cfs @ 2.13 fps) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=106.50' (Free Discharge) L5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 00 N L N UU U J J 0 Q U 0 < o 0 N a) 0 a? Urn °6 o Eo c Y n V CD 0 00 T- -00 T- N Q U CL CL o m IL 2 c .y c O CL a m M V c O a Q 0 2 m p M c 0= F= 0 N ?0CL U) N 0 M (SID) MOI=l 14, N co N N N N 0 N m T- oo r CD LO v i M O .C d _o 0) co r- CO LO v M N r BMP #1 Type 1124-hr Rainfall=1.00" Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/18/2008 Pond 3P: BMP #1 - Pond Design Inflow Area = 99.110 ac, Inflow Depth = 0.13" Inflow _ 2.97 cfs @ 13.59 hrs, Volume= 1.091 of Outflow 0.51 cfs @ 21.63 hrs, Volume= 0.925 af, Atten= 83%, Lag= 482.7 min Primary = 0.51 cfs @ 21.63 hrs, Volume= 0.925 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 106.98'@ 21.63 hrs Surf.Area= 1.439 ac Storage= 0.663 of Plug-Flow detention time= 782.3 min calculated for 0.925 of (85% of inflow) Center-of-Mass det. time= 711.7 min ( 1,723.6 - 1,011.9 ) ' Volume Invert Avail.Storage Storage Description #1 106.50' 7.272 of Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (acres) (feet) (acre-feet) (acre-feet) (acres) 106.50 1.316 1,106.0 0.000 0.000 1.316 107.00 1.444 1,137.0 0.690 0.690 1.444 108.00 1.523 1,156.0 1.483 2.173 1.528 109.00 1.604 1,175.0 1.563 3.736 1.613 110.00 1.765 1,772.0 1.684 5.420 4.827 111.00 1.940 2,379.0 1.852 7.272 9.430 Device Routing Invert Outlet Devices #1 Primary 105.00' 30.0" x 70.0' long Culvert X 2.00 RCP, square edge headwall, Ke= 0.500 Outlet Invert= 104.50' S= 0.0071 '/' Cc= 0.900 n= 0.013 #2 Device 1 106.50' 6.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 108.65' 60.0 deg x 1.0' long x 0.45' rise Sharp-Crested Vee/Trap Weir C= 2.53 #4 Device 1 109.10' 4.00' x 7.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 #5 Secondary 109.60' 35.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.51 cfs @ 21.63 hrs HW=106.98' (Free Discharge) t--1 =Culvert (Passes 0.51 cfs of 33.87 cfs potential flow) ' 2=Orifice/Grate (Orifice Controls 0.51 cfs @ 2.36 fps) 3=Sharp-Crested Vee/Trap Weir ( Controls 0.00 cfs) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=106.50' (Free Discharge) L5=Broad-Crested Rectangular Weir (Controls 0.00 cfs) 1 C) 0 N Q) U N O U U O O N N ? ? N U a, °6 C) Eo c Y i U o 00 6 Q CL Q U o m ? 2 C .N O 0. r a m M M c O CL aM (S;O) MOij O co O LO O LO 14- LO N LO O LO co CO N O 'IT O Cl) O M v M ` M O o? M d 00 E N (0 N Iq N N N 0 N co O IT _N O OD CO N t 1 WATER QUALITY POND CALCULATIONS Project Name NCCAR BMP #1 Project Number 04921-0003 Date April 17, 2008 3rd revision 2nd revision 1st revision t Water Quality Pond Drainage Area Data Project Project No. Date Total site area NCCAR BMP #1 04921-0003 April 17, 2008 4,317,035 square feet = Dra inage area to pond Other Drai nage Area Impervious areas Existing [sf] Proposed s Change s Existing sf] Proposed [sf] On-site buildings 0 28,050 28,050 0 0 On-site streets 0 0 0 0 0 On-site parkin 0 108,442 108,442 0 0 On-site sidewalks 0 0 0 0 0 Other on-site 0 1,427,821 1,427,821 0 0 Total off-site impervious 0 0 0 0 0 Total Impervious 0 1,564,313 1,564,313 0 0 Dra inage area to pond Other Drai nage Area Non-impervious areas Existing s Proposed s Change s Existing [sf] Proposed [s On-site grass/landscape 0 0 0 0 0 On-site woods 0 0 0 0 0 Other undeveloped 0 0 0 0 0 Total off-site non-impervious 0 0 0 0 0 Total non-impervious 0 0 0 0 0 Total Drainage Area 4,317,035 4,317,035 0 3,167,850 3,167,850 Percent Impervious 0.0 36.2 36.2 0.0 0.0 Notes: BMP #1.xls Site Drainage Area Data Page 1 of 1 99.11 acres Printed 4/18/2008 11:11 AM 1 t 1 1 1 1 Water Quality Pond Surface Area Calculations Project Project No Date NCCAR BMP #1 04921-0003 April 17, 2008 Total on-site drainage area to pond 4,317,035 square feet Total impervious area in drainage area 1,564,313 square feet Average water depth of basin at normal pool 4.0 feet Location of site Northampton County Site region Piedmont % Impervious cover 36.2 percent If the site is in a coastal area, will a vegetative filter be used? n/a Surface Area/Drainage Area Ratios: For a site in the Piedmont 1.3 percent For a site in a Coastal County w/ Vegetative Filter 2.3 percent For a site in a Coastal County w/out Vegetative Filter 3.2 percent Required surface area of pond: For a site in the Piedmont 56,050.0 square feet For a site in a Coastal County w/ Vegetative Filter 100,870.0 square feet For a site in a Coastal County w/out Vegetative Filter 138,100.0 square feet Notes: BMP #1.xls Pond Surface Area Calcs Page 1 of 1 Printed 4/18/2008 11:11 AM 1 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Stormwater Runoff Volume Calculations Project Project No. Date Drainage area Impervious area Rainfall depth NCCAR BMP #1 04921-0003 April 17, 2008 4,317,035 square feet 1,564,313 square feet 1.00 inches Percent Impervious 36.2 R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.38 percent in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 135,311.1 cubic feet Notes: BMP #1.xls Runoff Volume Calcs Page 1 of 1 Printed 4/18/2008 11:11 AM 1 1 Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Temporary Pool Project NCCAR BMP #1 Project No. 04921-0003 Date April 17, 2008 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 106.5 0 57,304.0 1.316 57,304.0 1.3 0.0 0.0 0.0 0.0 107 0.5 62,912.0 1.444 5,608.0 0.1 30,054.0 0.7 30,054.0 0.7 108 1.5 66,353.0 1.523 3,441.0 0.1 64,632.5 1.5 94,686.5 2.2 108.65 109 110 111 2.15 2.5 3.5 4.5 68,620.0 69,850.0 76,894.0 84,512.0 1.575 1.604 1.765 1.940 2,267.0 1,230.0 7,044.0 7,618.0 0.1 0.0 0.2 0.2 43,866.2 24,232.2 73,372.0 80,703.0 1.0 0.6 1.7 1.9 138,552.7 162,785.0 236,157.0 316,860.0 2.5 1.6 2.2 3.5 BMP #1.xls Stage Storage (Temp Pool) Page 1 of 1 Printed 4/1812008 11:11 AM 1 1 Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Permanent Pool Project NCCAR BMP #1 Project No. 04921-0003 Date April 17, 2008 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 100 0 17,889.0 0.411 17,889.0 0.4 0.0 0.0 0.0 0.0 101 1 20,894.0 0.480 3,005.0 0.1 19,391.5 0.4 19,391.5 0.4 102 2 31,297.0 0.718 10,403.0 0.2 26,095.5 0.6 45,487.0 1.0 103 3 35,515.0 0.815 4,218.0 0.1 33,406.0 0.8 78,893.0 1.4 104 4 39,847.0 0.915 4,332.0 0.1 37,681.0 0.9 116,574.0 1.6 105 5 44,291.0 1.017 4,444.0 0.1 42,069.0 1.0 158,643.0 1.8 106 6 48,849.0 1.121 4,558.0 0.1 46,570.0 1.1 205,213.0 2.0 106.5 6.5 57,304.0 1.316 8,455.0 0.2 26,538.3 0.6 231,751.3 1.7 BMP #1.xls Stage Storage (Perm Pool) Page 1 of 1 Printed 4/18/2008 11:11 AM 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Volume Calculations Stage-Storage Data for Pond -Forebays Project NCCAR BMP #1 Project No. 04921-0003 Date April 17, 2008 Contour ID Stage Area s . ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 102 0 7,334.0 0.168 7,334.0 0.2 0.0 0.0 0.0 0.0 103 1 8,435.0 0.194 1,101.0 0.0 7,884.5 0.2 7,884.5 0.2 104 2 9,593.0 0.220 1,158.0 0.0 9,014.0 0.2 16, 898.5 0.4 105 3 10,807.0 0.248 1,214.0 0.0 10,200.0 0.2 27,098.5 0.4 106 4 12,078.0 0.277 1,271.0 0.0 11,442.5 0.3 38,541.0 0.5 106.5 4.5 14,510.0 0.333 2,432.0 0.1 6,647.0 0.2 45,188.0 0.4 BMP #1.xls Stage Storage (Forebays) Page 1 of 1 Printed 4/18/2008 11:11 AM 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Basin Dewatering Time Calculations Project NCCAR BMP #1 Project No. 04921-0003 Date April 17, 2008 Maximum surface area of basin 68,620 square feet Maximum head of water above dewatering hole 2.15 feet Orifice coefficient 0.60 Diameter of each hole 6.5 inches Number of holes 1 Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for basin = Dewatering time for basin = Notes: 0.230 square feet 33.2 square inches 0.230 square feet 33.2 square inches 50.4 hours 2.10 days 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Summary Information Project NCCAR BMP #1 Project No. 04921-0003 Date April 17, 2008 Drainage area to pond 4,317,035 square feet = 99.11 acres Impervious area in drainage area 1,564,313 square feet = 35.91 acres Bottom of pond elevation 101.00 feet Normal pool elevation 106.50 feet Pond volume at normal pool 231,751 cubic feet Required volume for design rainfall 135,311 cubic feet Required surface area for pond 56,050 square feet Volume provided for storage of design rainfall = 138,553 cubic feet at elevation 108.65 Surface area provided at normal pool 57,304 square feet BMP #1.xls Summary Data Page 1 of 1 Printed 4/18/2008 11:12 AM 00 CO 0 0 Q O O U N O ?- N ? O m N aU) U O O a cu U U U U (0ON0) o6 o 000 000 LO N ? NLo MNL' U r- v co cV N N M N E a) N 7 V V O 2 O 0 LL M (D LL r> d7 N E a) 0) 0).Cn CO 2 C 0 N fn 4- O > ?Um QL L N N a) U m==?- m=E- LL co ?v Q ?C U 010 Z .c U C LO co U U L L L L U 0 0 0 0 (D O In (q 00 N N 00 L6 00 O co O L N N O N't n O O O O t* O 0) O V ti C) 'T N Lo N r N 0) - (o 0) N M r- ?- r 00 I- 00 ? N N N C O ? •? O 7 N 2 (n " w C: w L +' C E o , 4- a 0 '- O N (n 7 LL O . L 00 z- N L LD) E5 C N E J O L L C ..L. . > O C L V m N U O -0 L Q rL.., In ca O . C C U C CO O O LL cm B O -p C m L C C L C) C U 7 m r-• 'O c a) J O N Q F- 0) O E ?- 0) T U) M U) t0 n 0 U O N } cu -0 a) a) to U) 0 CT «. ???E _ ??1- 0 0 f--Q> mm =cn }, F. . f :::•:?::}::•f;{.'•::+?ii'ri::':ij'ri:::::: iti::i:;v:tti::::::.' :i: 4Y f •: • .N : ?::f :•::::':::':}}}•':'} ATE ESIGN PHASE :....., .. .: : ? r r: : ::?i•:v::::........•r}}}}:?4:•}'f::}:•}}::•}i:•}......:n... .. .....v...v:.:::.: i' ' y :•.:..:.v:.: F v.•.v:w:::w:::::::: fv..:.. n. u:?.:.... ::'r?:y;;;•5;. v :•}::??:: •::.x•}•r+;:: •}•.} •:.}•:.}:.<;f::::::.:?::::::•r`.r:x;.•,;;r?•:.:::r:?•}:..:::::: f.. . 22'.:,.,:,.:;.; }}; .; .. v; ?.:::r.:<r:.:.::..}..::::•:::•: r..•::.•.... r.. r. rrr.:•:.:•::: •: f:._ ,•::..:.:::•:i?.::::. 4/21/08 RELIM PROJECT NAME PROJECT NO CONSTR NCCAR 4921-0003 REVISION LOCATION BY RECORD Garysburg, NC GCA OTHER BMP #1 CHECKED BY (SPECIFY) GML Storm Outlet Structure Structure= BMP #1 Size= 30 in Q10 = 39.62 cfs Qfull = 34.50 cfs Vfull = 7.02 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Q10/Qfull = 1.15 V/Vfull = 1.15 V = 8.1 fps Zone = 2 D5o = 8 in DMAx = 12 in Riprap Class = B Apron Thickness = 12 in Apron Length = 15.0 ft Apron Width = 3xDia = 7.5 ft 1 BMP #2 Type// 24-hr Rainfall=2.81 " Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/16/2008 ' Subcatchment 1S: BMP #2 - Pre-Development ' Runoff = 9.60 cfs @ 12.45 hrs, Volume= 1.311 af, Depth> 0.78" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr Rainfall=2.81" Area (ac) CN Description 20.230 74 Pasture/grassland/range, Good, HSG C ' 20.230 Pervious Area Tc Length Slope Velocity Capacity Description ' (min) (feet) (ft/ft) (ft/sec) (cfs) 33.2 250 0.0140 0.13 Sheet Flow, Grass: Dense n= 0.240 P2= 3.40" 9.7 980 0.0110 1.69 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 42.9 1,230 Total 1 1 1 00 oo °o N N Z:= 1 c0 O c v1-0 ?t cri ? ¦ i t 04 LEE sm mm Bo 0.- a? O ? r4*- N M E II N N N M O B O CZ . s II N I .r..? 4) C-4 CIE CL C W L - J O a > E. O 0 0 ? r o LIE. L a N a U m ? J L J ? to r ? O = a 0 S. U u 01 V O .a U o cn Q U O ao O N N ? UN O °6 o ?o c Y in U O O co Q O O) co ti C, Lo M ?- a U ° (SIO) nnOl:j m a. _ IT N M N N N N O N 00 r- r O t co r N r r 0 O CC) r- C0 1 LO O BMP #2 Type 1124-hr Rainfall=2.81" 1 Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/16/2008 ' Subcatchment 2S: BMP #2 - Post-Development Runoff = 30.02 cfs @ 12.04 hrs, Volume= 1.767 af, Depth> 1.05" Runoff by SCS T R-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr Rainfall=2.81" ' Area (ac) CN Description 4.370 98 Paved parking & roofs 15.860 74 >75% Grass cover, Good, HSG C 20.230 79 Weighted Average 15.860 Pervious Area 4.370 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.2 100 0.0200 1.42 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.40" 10.6 1,083 0.0130 1.71 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 11.8 1,183 Total ?J BMP #2 Type// 24-hr Rainfall=2.81" Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/17/2008 r Pond 3P: BMP #2 - Pond Design Inflow Area 20.230 ac, Inflow Depth > 1.05" Inflow 30.02 cfs @ 12.04 hrs, Volume= 1.767 of Outflow = 8.04 cfs @ 12.29 hrs, Volume= 1.337 af, Atten= 73%, Lag= 14.8 min Primary = 8.04 cfs @ 12.29 hrs, Volume= 1.337 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 116.41'@ 12.29 hrs Surf.Area= 0.373 ac Storage= 0.642 of Plug-Flow detention time= 152.1 min calculated for 1.337 of (76% of inflow) ' Center-of-Mass det. time= 55.3 min ( 908.5 - 853.2 ) Volume Invert Avail.Storage Storage Description #1 114.50' 1.759 of Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (acres) (feet) (acre-feet) (acre-feet) (acres) 114.50 0.273 442.0 0.000 0.000 0.273 115.00 0.326 474.0 0.150 0.150 0.327 116.00 0.359 493.0 0.342 0.492 0.362 117.00 0.394 512.0 0.376 0.868 0.399 118.00 0.430 530.0 0.412 1.280 0.435 119.00 0.530 958.0 0.479 1.759 1.599 ' Device Routing Invert Outlet Devices #1 Primary 113.50' 15.0" x 68.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 113.10' S= 0.0059 '/' Cc= 0.900 n=0.013 #2 Device 1 114.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 115.80' 4.00'x 4.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 117.50' 35.0' long x 10.0' breadth Broad-Crested Rectangular Weir 1 Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=8.04 cfs @ 12.29 hrs HW=116.41' (Free Discharge) L1 =Culvert (Barrel Controls 8.04 cfs @ 6.55 fps) 1:3=Orifice/G 2=Orifice/G rate (Passes < 0.22 cfs potential flow) rate (Passes < 24.77 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=114.50' (Free Discharge) L4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 1 1 1 1 N .C i N N F- U J J Q U 0 < o 0 N O Urn °6 o Eo c Y i U O O .>% 00 N 0 Q `U a ao L- >1 .y d V C O a N a a M .d 0 CL C. L 0 L 21, m O ?c O N 0 ?Oa(/) NONE (SIO) MOIZI IT N M N N N N O N _M co r ti cfl r N Lo 3 0 t ?E M r N r 0 co I- CO Lo ' BMP #2 Type 11 24-hr Rainfall=1.00" Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 @ 2006 HydroCAD Software Solutions LLC 4/17/2008 Pond 3P: BMP #2 - Pond Design Inflow Area 20.230 ac, Inflow Depth = 0.07" Inflow 0.70 cfs @ 12.11 hrs, Volume= 0.118 of Outflow = 0.06 cfs @ 24.04 hrs, Volume= 0.106 af, Atten= 91%, Lag= 715.7 min Primary = 0.06 cfs @ 24.04 hrs, Volume= 0.106 of ' Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-60.00 hrs, dt= 0.05 hrs ' Peak Elev= 114.74'@ 24.04 hrs Surf.Area= 0.298 ac Storage= 0.069 of Plug-Flow detention time= 703.8 min calculated for 0.106 of (90% of inflow) ' Center-of-Mass det. time= 657.2 min ( 1,628.3 - 971.1 ) Volume Invert Avail.Storage Storage Description #1 114.50' 1.759 of Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (acres) (feet) (acre-feet) (acre-feet) (acres) ' 114.50 0.273 442.0 0.000 0.000 0.273 115.00 0.326 474.0 0.150 0.150 0.327 116.00 0.359 493.0 0.342 0.492 0.362 117.00 0.394 512.0 0.376 0.868 0.399 118.00 0.430 530.0 0.412 1.280 0.435 119.00 0.530 958.0 0.479 1.759 1.599 Device Routing Invert Outlet Devices #1 Primary 113.50' 15.0" x 68.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 113.10' S=0.0059'/' Cc= 0.900 n=0.013 #2 Device 1 114.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 115.80' 4.00'x 4.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 117.50' 35.0' long x 10.0' breadth Broad-Crested Rectangular Weir ' Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.06 cfs @ 24.04 hrs HW=114.74' (Free Discharge) t1=Culvert (Passes 0.06 cfs of 4.01 cfs potential flow) 1:3=Orifice/G 2=Orifice/G rate (Orifice Controls 0.06 cfs @ 1.78 fps) rate ( Controls 0.00 cfs) ' Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=114.50' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 11 1 1 1 1 1 1 1 1 1 t 1 0 O n w i r N R U J J cn 2 m O (n O O N N ? N ? UN O 06 O O C Y n U O O O -ag 700 N # CD U d Qo M 2 O in a- M' C .y 0 C O CL N a a M O a C. m O V 21 co OC o ccu O o SOCL E L) Co o o o o° x 0 0 0 0 0 (SID) MOIj O c0 0 LO 0 LO 44- LO N LO O LO O .t O N V- O V- o M c0 - M y V M O N M O M CC) N O N d' N N N O N co r c0 r V' N_ O r O O O 1 1 1 1 1 1 1 1 1 1 WATER QUALITY POND CALCULATIONS Project Name NCCAR BMP #2 Project Number 04921-0003 Date April 17, 2008 3rd revision 2nd revision 1 st revision 17 Water Quality Pond Drainage Area Data Project Project No. Date Total site area Dra inage area to pond Other Drai nage Area Impervious areas Existing sf] Proposed Isf] Change [s Existing Isf] Proposed Isf] On-site buildings 0 46,109 46,109 0 0 On-site streets 0 0 0 0 0 On-site parkin 0 144,115 144,115 0 0 On-site sidewalks 0 0 0 0 0 Other on-site 0 0 0 0 0 Total off-site impervious 0 0 0 0 0 Total Impervious 0 190,224 190,224 0 0 Dra inage area to pond Other Dra inage Area Non-impervious areas Existing [sf] Proposed [sf] Change [s Existing Isf] Proposed sf] On-site grass/landscape 0 137,267 137,267 0 0 On-site woods 0 0 0 0 0 Other undeveloped 0 0 0 0 0 Total off-site non-impervious 0 0 0 0 0 Total non-impervious 0 137,267 137,267 0 0 Total Drainage Area 881,416 881,416 0 3,167,850 3,167,850 Percent Impervious 0.0 21.6 21.6 0.0 0.0 NCCAR BMP #2 04921-0003 April 17, 2008 881,416 square feet = 20.23 acres Notes: BMP #2.xls Site Drainage Area Data Page 1 of 1 Printed 4/16/2008 3:18 PM 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Surface Area Calculations Project Project No Date NCCAR BMP #2 04921-0003 April 17, 2008 Total on-site drainage area to pond 881,416 square feet Total impervious area in drainage area 190,224 square feet Average water depth of basin at normal pool 3.0 feet Location of site Northampton County Site region Piedmont % Impervious cover 21.6 percent If the site is in a coastal area, will a vegetative filter be used? n/a Surface Area/Drainage Area Ratios: For a site in the Piedmont 1.0 percent For a site in a Coastal County w/ Vegetative Filter 1.8 percent For a site in a Coastal County w/out Vegetative Filter 2.6 percent Required surface area of pond: For a site in the Piedmont 9,070.0 square feet For a site in a Coastal County w/ Vegetative Filter 16,100.0 square feet For a site in a Coastal County w/out Vegetative Filter 22,690.0 square feet Notes: BMP #2.xls Pond Surface Area Calcs Page 1 of 1 Printed 4/16/2008 3:18 PM Water Quality Pond Stormwater Runoff Volume Calculations Project Project No. Date Drainage area Impervious area Rainfall depth NCCAR BMP #2 04921-0003 April 17, 2008 881,416 square feet 190,224 square feet 1.00 inches Percent Impervious 21.6 R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.24 percent in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 17,939.4 cubic feet Notes: BMP #2.xls Runoff Volume Calcs Page 1 of 1 Printed 4/16/2008 3:18 PM 1 1 Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Temporary Pool Project NCCAR BMP #2 Project No. 04921-0003 Date April 17, 2008 Contour ID Stage Area [s q. ft. Area acres Incremental Area (s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 114.5 0 11,905.0 0.273 11,905.0 0.3 0.0 0.0 0.0 0.0 115 0.5 14,196.0 0.326 2,291.0 0.1 6,525.3 0.1 6,525.3 0.1 115.8 1.3 15,351.0 0.352 1,155.0 0.0 11,818.8 0.3 18,344.1 0.4 116 1.5 15,646.0 0.359 295.0 0.0 3,099.7 0.1 21,443.8 0.3 117 2.5 17,152.0 0.394 1,506.0 0.0 16,399.0 0.4 37,842.8 0.4 118 3.5 18,715.0 0.430 1,563.0 0.0 17,933.5 0.4 55,776.3 0.8 119 4.5 23,080.0 0.530 4,365.0 0.1 20,897.5 0.5 76,673.8 0.9 BMP #2.xls ' Stage Storage (Temp Pool) Page 1 of 1 Printed 4/16/2008 3:18 PM fl C! u F Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Permanent Pool Project NCCAR BMP #2 Project No. 04921-0003 Date April 17, 2008 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 107 0 816.0 0.019 816.0 0.0 0.0 0.0 0.0 0.0 108 1 1,450.0 0.033 634.0 0.0 1,133.0 0.0 1,133.0 0.0 109 2 2,268.0 0.052 818.0 0.0 1,859.0 0.0 2,992.0 0.1 110 3 3,115.0 0.072 847.0 0.0 2,691.5 0.1 5,683.5 0.1 111 4 4,932.0 0.113 1,817.0 0.0 4,023.5 0.1 9,707.0 0.2 112 5 6,265.0 0.144 1,333.0 0.0 5,598.5 0.1 15,305.5 0.2 113 6 7,712.0 0.177 1,447.0 0.0 6,988.5 0.2 22,294.0 0.3 114 7 9,361.0 0.215 1,649.0 0.0 8,536.5 0.2 30,830.5 0.4 114.5 7.5 11,905.0 0.273 2,544.0 0.1 5,316.5 0.1 36,147.0 0.3 BMP #2.xls Stage Storage (Perm Pool) Page 1 of 1 Printed 4/16/2008 3:18 PM 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Forebay Project NCCAR BMP #2 Project No. 04921-0003 Date April 17, 2008 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 110 0 592.0 0.014 592.0 0.0 0.0 0.0 0.0 0.0 111 1 911.0 0.021 319.0 0.0 751.5 0.0 751.5 0.0 112 2 1,283.0 0.029 372.0 0.0 1,097.0 0.0 1,848.5 0.0 113 3 1,712.0 0.039 429.0 0.0 1,497.5 0.0 3,346.0 0.1 114 4 2,197.0 0.050 485.0 0.0 1,954.5 0.0 5,300.5 0.1 114.5 4.5 3,072.0 0.071 875.0 0.0 1,317.3 0.0 6,617.8 0.1 BMP #2.xls Stage Storage (Forebay) Page 1 of 1 Printed 4/16/2008 3:18 PM 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Basin Dewatering Time Calculations Project NCCAR BMP #2 Project No. 04921-0003 Date April 17, 2008 Maximum surface area of basin 15,351.0 square feet Maximum head of water above dewatering hole 1.5 feet Orifice coefficient 0.60 Diameter of each hole 2.5 inches Number of holes 1 Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for basin = Dewatering time for basin = Notes: 0.034 square feet 4.9 square inches 0.034 square feet 4.9 square inches 62.6 hours 2.6 days 1 1 1 1 f 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Summary Information Project NCCAR BMP #2 Project No. 04921-0003 Date April 17, 2008 Drainage area to pond 881,416 square feet = 20.23 acres Impervious area in drainage area 190,224 square feet = 4.37 acres Bottom of pond elevation 107.00 feet Normal pool elevation 114.50 feet Pond volume at normal pool 36,080 cubic feet Required volume for design rainfall 17,939 cubic feet Required surface area for pond 9,070 square feet Volume provided for storage of design rainfall = 18,344 cubic feet at elevation 115.8 Surface area provided at normal pool 11,905 square feet BMP #2.xls Summary Data Page 1 of 1 Printed 4/16/2008 3:18 PM 00 M O O Q 0 O U N 0 N N O co N N C L-3 O O CL N _U U L W C 7 V U N IL 2 m Q U U z U 00 N M O 000 000 ? ?' N I? ? ? 00 ?- 1- CO M a) (D U U 0 = l1 a) 2:' rn E L N L L +_ N 7 a) C .? ,? .? fn O C p a) a) a) O > U m N Q) (D (uV a) Fo U w a? L U C m 7 m a= U U L :2 LL F L U $= CD OOO co Nco O O' NNO AO 1`O O O In OD O co L' LO r- V O O M U') V O N N M I? r V ti t0 0 r ?P M (D N a) a) ? U O L N p` ?> 0 O C ° O C rn ? v LL o °3 L m o w rn -a w E a i i C: C .. C m a) 0 . L N Q L m O a) - O Y U O C ?, 0 f0 LL 0 O ' 0) 'D C m L _ C C C a) Cam C p CUm N N >? (C C p 9 J 0 rr ? > a) N N >N N W(D (?0 C (A M a O N N 07 0 E>E ??1- 0 0 F-Q> mm 01-1 U) 1 1 1 1 1 1 1 1 f r ; .,.. :.: i3 DATE DESIGN PHASE :{{•fi"hy;{•i'•i':•ihiii:4:•i:•iii:Siiiii:•: Y{•:? :•i ?:>•: i:i::ii:Li::ii::+:::::::• .. f/.. r ............. ii:^y:+i:•i:•i:•ii:•ii iii:;: }:::{: {p:iY•i'{•{•+ { :.:'.::.:::.....................::f:+:iiyiiiii}:•:{•.'•ii';'::::.`•::'t'v::SS.`•:i'r,:'riii::i :.i•.>.:.04/21/08 PRELIM PROJECT NAME PROJECT NO CONSTR NCCAR 4921-0003 REVISION LOCATION BY RECORD Garysburg, NC GCA OTHER BMP #2 CHECKED BY (SPECIFY) GML Storm Outlet Structure Structure= BMP #2 Quo/Qfull = 2.24 Size= 15 in VNfull = 2.24 Qio = 11.10 cfs V = 9.0 fps Qfull = 4.95 cfs Vfull = 4.04 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAx = 12 in Riprap Class = B L Apron Thickness = 12 in Full 3 Apron Length = 7.5 ft Apron Width = 3xDia = 3.75 ft Length BMP #4 Type 1124-hr Rainfall=2.81" Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/16/2008 ' Subcatchment 1 S: BMP #4 - Pre-Development Runoff = 4.48 cfs @ 12.03 hrs, Volume= 0.258 af, Depth> 0.79" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr Rainfall=2.81" 1 Area (sf) CN Description 171,001 74 Pasture/grassland/range, Good, HSG C ' 171,001 Pervious Area Tc Length Slope Velocity Capacity Description ' (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, t 1 1 1 1 1 1 1 1 00 N 4211 i t i N J J C O 7 O U) N (2B L 0 0 Q U 0 Qo C) 0 N N UN m °6 o Eo c Y N U O O a Qo m ? 2 C d E CL _C d d L a a m r .C V V .G 7 t Q. 2 L cm O L 2 0 c ¦ v N Cl) N N N N O N CY) r 00 r r LO , o t ? C1 r M r N 0 rn 00 (D LO O uJ Q (7 N ?- (SIO) Molj BMP #4 Type // 24-hr Rainfall=2.81" Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/16/2008 ' Subcatchment 2S: BMP #4 - Post-Development [46] Hint: Tc=O (Instant runoff peak depends on dt) Runoff = 12.51 cfs @ 11.89 hrs, Volume= 0.515 af, Depth> 1.57" 1 Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr Rainfall=2.81" Area (sf) CN Description 89,064 98 Paved parking & roofs 81,937 74 >75% Grass cover, Good, HSG C 171,001 87 Weighted Average ' 81,937 Pervious Area 89,064 Impervious Area F 1 1 1 BMP #4 Type// 24-hr Rainfall=2.81 " Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/16/2008 Pond 3P: BMP #4 - Wetland Routing Inflow Area = 3.926 ac, Inflow Depth > 1.57" Inflow = 12.51 cfs @ 11.89 hrs, Volume= 0.515 of Outflow = 4.26 cfs @ 12.00 hrs, Volume= 0.326 af, Atten= 66%, Lag= 6.3 min Primary = 0.12 cfs @ 12.00 hrs, Volume= 0.112 of Secondary = 4.14 cfs @ 12.00 hrs, Volume= 0.213 of Routing by Stor-Ind method, Time Span= 5.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 126.29'@ 12.00 hrs Surf.Area= 9,815 sf Storage= 10,066 cf Plug-Flow detention time= 189.3 min calculated for 0.325 of (63% of inflow) Center-of-Mass det. time= 81.0 min ( 896.8 - 815.8 ) Volume Invert Avail.Storage Storage Description #1 125.00' 17,763 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) 125.00 5,770 529.0 0 0 5,770 126.00 9,016 419.0 7,333 7,333 14,082 127.00 11,912 440.0 10,430 17,763 15,580 Device Routing Invert Outlet Devices #1 Primary 125.00' 2.0" Vert. Orifice/Grate C= 0.600 #2 Secondary 126.10' 20.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.12 cfs @ 12.00 hrs HW=126.29' (Free Discharge) t1=Orifice/Grate (Orifice Controls 0.12 cfs @ 5.29 fps) Secondary OutFlow Max=4.08 cfs @ 12.00 hrs HW=126.29' (Free Discharge) L2=Broad-Crested Rectangular Weir (Weir Controls 4.08 cfs @ 1.08 fps) 1 1 1 1 1 1 n N 11 ZZ: i N N U J J C O 7 O 2 O IL O O N O L ? UN O °6 o Eo c Y n U C) O O d' -00 `U 4. Qo m ? 2 C O w C d d' Ma W a M C O IL t Q. L O L. 13 ¦¦ Z cu p c0 c _O E O c0CL (n N EIM (SIO) MOl:j It N M N N N r N O N _O co ti r N O M ~ N r r O r- O co r- CD Ln BMP #4 Type 11 24-hr Rainfall=1.00" Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/16/2008 Pond 3P: BMP #4 - Wetland Routing Inflow Area Inflow 3.926 ac, 1.74 cfs @ Inflow Depth = 0.22" 11.90 hrs, Volume= 0.073 of Outflow = 0.05 cfs @ 15.84 hrs, Volume= 0.070 af, Atten= 97%, Lag= 236.3 min Primary = 0.05 cfs @ 15.84 hrs, Volume= 0.070 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-60.00 hrs, dt= 0.05 hrs 1 Peak Elev= 125.27'@ 15.84 hrs Surf.Area= 6,587 sf Storage= 1,689 cf Plug-Flow detention time= 555.4 min calculated for 0.070 of (95% of inflow) Center-of-Mass det. time= 531.1 min ( 1,407.2 - 876.1 ) Volume Invert Avail.Storage Storage Description #1 125.00' 17,763 cf Custom Stage Data (irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) 1 125.00 5,770 529.0 0 0 5,770 126.00 9,016 419.0 7,333 7,333 14,082 127.00 11,912 440.0 10,430 17,763 15,580 Device Routing Invert Outlet Devices #1 Primary 125.00' 2.0" Vert. Orifice/Grate C= 0.600 #2 Secondary 126.10' 20.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.05 cfs @ 15.84 hrs HW=125.27' (Free Discharge) t-1=Orifice/Grate (Orifice Controls 0.05 cfs @ 2.10 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=125.00' (Free Discharge) t--2=Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 1 1 1 0 0 u c i 4 N N U J J N Q (c) d CJ C) N N U N p °6 o C p C Y U O p ?co ? N UI d Qo N? a`= ca tm C O C r..r a m a M C O a t Q. L O Z cu 3:2:1-0 3: o o c o E o .s0a_m NONE (SIO) MO1j C) CO co LO CO v Cn N LO C) LO co 'IT CO 't 'IT N C) d co M Cfl M N M O N M p I-- co N CD N N N N C N co r CO N_ C) co Co 1 1 1 1 1 1 1 1 1 1 1 1 STORMWATER WETLAND WATER QUALITY CALCULATIONS Project Name NCCAR BMP #4 Project Number 04921-0003 Date April 17, 2008 3rd revision 2nd revision 1 st revision 1 1 1 1 1 1 1 1 1 1 1 Stormwater Wetland Drainage Area Data Project NCCAR BMP #4 Project No. Date Total site area 04921-0003 April 17, 2008 171,001 square feet = acres Dra inage area to pond Other Drai nage Area Impervious areas Existing [sf] Proposed [sf] Change [sf] Existing [sf] Proposed [sf] On-site buildings 0 31,414 31,414 0 0 On-site streets 0 0 0 0 0 On-site parkin 0 57,650 57,650 0 0 On-site sidewalks 0 0 0 0 0 Other on-site 0 0 0 0 0 Total off-site impervious 0 0 0 0 0 Total Impervious 0 89,064 89,064 0 0 Drainage area to pond Other Drai nage Area Non-impervious areas Existing [sf] Proposed [sf] Change [sf] Existing [sf] Proposed [sf] On-site grass/landscape 0 0 0 0 On-site woods 0 0 0 0 0 Other undeveloped 0 0 0 0 0 Total off-site non-impervious 0 0 0 0 0 Total non-impervious 0 0 0 0 0 Total Drainage Area 171,001 171,001 0 3,167,850 3,167,850 Percent Impervious 0.0 52.1 52.1 0.0 0.0 Notes: BMP #4.xls Site Drainage Area Data Page 1 of 1 3.93 Printed 4/16/2008 3:23 PM 1 1 1 1 1 1 1 1 1 1 1 1 Stormwater Wetland Stormwater Runoff Volume Calculations Project Project No. Date Drainage area Impervious area Rainfall depth Percent Impervious NCCAR BMP #4 04921-0003 April 17, 2008 171,001 square feet 89,064 square feet 1.00 inches 52.1 percent R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.52 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 7,392.3 cubic feet Notes: BMP #4.xls Runoff Volume Calcs Page 1 of 1 Printed 4/16/2008 3:23 PM i 1 Stormwater Wetland Volume Calculations Stage-Storage Data for Wetland - Temporary Pool Project NCCAR BMP #4 Project No. 04921-0003 Date April 17, 2008 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 124 0 5,770.0 0.132 5,770.0 0.1 0.0 0.0 0.0 0.0 125 1 9,016.0 0.207 3,246.0 0.1 7,393.0 0.2 7,393.0 0.2 126 2 10,434.0 0.240 1,418.0 0.0 9,725.0 0.2 17,118.0 0.4 127 3 11,912.0 0.273 1,478.0 0.0 11,173.0 0.3 28,291.0 0.5 BMP #4.xls ' Stage Storage (Temp Pool) Page 1 of 1 Printed 4/16/2008 3:23 PM t 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Stormwater Wetland Dewatering Time Calculations Project NCCAR BMP #4 Project No. 04921-0003 Date April 17, 2008 Maximum surface area of basin 9,016 square feet Maximum head of water above dewatering hole 1.0 feet Orifice coefficient 0.60 Diameter of each hole 2.00 inches Number of holes 1 Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for basin = Dewatering time for basin = Notes: 0.022 square feet 3.1 square inches 0.022 square feet 3.1 square inches 47.7 hours 2.0 days 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Stormwater Wetland Summary Information Date April 17, 2008 Project NCCAR BMP #4 Project No. 04921-0003 Drainage area to pond 171,001 square feet = Impervious area in drainage area 89,064 square feet = Bottom of pond elevation 120.50 feet Normal pool elevation 124.00 feet 3.93 acres 2.04 acres Required volume for design rainfall 7,392 cubic feet Volume provided for storage of design rainfall = 7,393 cubic feet at elevation 125 BMP #4.xls Summary Data Page 1 of 1 Printed 4/16/2008 3:23 PM J ' BMP #5 Type /I 24-hr Rainfall=2.81" Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/16/2008 ' Subcatchment 11 S: BMP #5 Pre-Development ' Runoff = 4.43 cfs @ 12.50 hrs, Volume= 0.640 af, Depth> 0.78" Runoff by SCS TR-20 method, UH=SCS, Time Span= 1.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr Rainfall=2.81" Area (ac) CN Description 9.880 74 Pasture/grassland/range, Good, HSG C ' 9.880 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 38.0 250 0.0100 0.11 Sheet Flow, Grass: Dense n= 0.240 P2= 3.40" ' 8.4 1,825 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 46.4 2,075 Total 7 1 1 1 00 CV I I z Sz L N a? a C O O rn N O rA Q U O a o 0 N U N rn °6 It Eo C Y U n c? o O ?@ # `U a ao m IL 2 O C 7 L ?, r V `v Bo LO r ¦? N d' O Q r". O II N N N co CD n N N N CO A ' V _ m C m II ¦? d' N i.. `\/ W V N ? ? G1 Q ? ? D ? Q ? u. cfl d a LO a m Q w L r 0 r tm U v v N r E P V O r V ? cn co r` 0 LO v co N co I N ?- O ? (SID) mou ' BMP #5 Type// 24-hr Rainfall=2.81" Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/16/2008 ' Subcatchment 7S: BMP #5 Post-Development ' Runoff = 13.32 cfs @ 12.36 hrs, Volume= 1.546 af, Depth> 1.88" Runoff by SCS TR-20 method, UH=SCS, Time Span= 1.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr Rainfall=2.81" Area (ac) CN Description 6.826 98 Paved VDA 3.054 74 >75% Grass cover, Good, HSG C 9.880 91 Weighted Average 3.054 Pervious Area ' 6.826 Impervious Area Tc Length Slope Velocity Capacity Description 1 (min) (feet) (ft/ft) (ft/sec) (cfs) 18.1 180 0.0330 0.17 Sheet Flow, Grass. Dense n= 0.240 P2= 3.40" 22.0 1,895 0.0050 1.44 Shallow Concentrated Flow, ' Paved Kv= 20.3 fps 40.1 2,075 Total n ' BMP #5 Type// 24-hr Rainfall=2.81" Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/17/2008 Pond 8P: BMP #5 Pond Design Inflow Area 9.880 ac, Inflow Depth > 1.88" Inflow 13.32 cfs @ 12.36 hrs, Volume= 1.546 of Outflow = 4.23 cfs @ 12.99 hrs, Volume= 0.990 af, Atten= 68%, Lag= 37.9 min Primary = 4.23 cfs @ 12.99 hrs, Volume= 0.990 of ' Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 126.39'@ 12.99 hrs Surf.Area= 0.431 ac Storage= 0.742 of Plug-Flow detention time= 185.6 min calculated for 0.988 of (64% of inflow) Center-of-Mass det. time= 86.8 min ( 917.0 - 830.2 ) ' Volume Invert Avail.Storage Storage Description #1 124.50' 2.464 of Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (acres) (feet) (acre-feet) (acre-feet) (acres) ' 124.50 0.322 508.0 0.000 0.000 0.322 125.00 0.382 539.0 0.176 0.176 0.382 126.00 0.418 558.0 0.400 0.576 0.422 127.00 0.451 577.0 0.434 1.010 0.463 128.00 0.459 596.0 0.455 1.465 0.506 129.00 0.499 615.0 0.479 1.944 0.550 130.00 0.541 751.0 0.520 2.464 0.890 Device Routing Invert Outlet Devices #1 Primary 124.50' 12.0" x 86.0' long Culvert RCP, sq.cut end projecting, Ke= 0.500 Outlet Invert= 123.50' S=0.0116'/' Cc= 0.900 n=0.013 #2 Device 1 124.50' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 125.95' 4.00'x 4.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 128.25' 30.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=4.23 cfs @ 12.99 hrs HW=126.39' (Free Discharge) t-1=Culvert (Barrel Controls 4.23 cfs @ 5.38 fps) 2=Orifice/Grate (Passes < 0.31 cfs potential flow) L3=Orifice/Grate (Passes < 15.31 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=124.50' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) i 1 00 (V II 42 co L vt N N co cu 0". 0 COILCO N EIM N M N N N r N O N tm Z O .a C O a Ul) a m a Qo c O a a L 0 2 0) T 00 r- CD LA v ce) o O W Qc ac ?` ?r U c C16 N c YE c _ c ? U ?c c Aq LO < a a, ? Z m ? (S}O) MOlj co LO IT co N 1 BMP #5 Type // 24-hr Rainfall=1.00" Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/17/2008 Pond 8P: BMP #5 Pond Design Inflow Area 9.880 ac, Inflow Depth = 0.36" Inflow 2.38 cfs @ 12.39 hrs, Volume= 0.296 of Outflow = 0.15 cfs @ 16.83 hrs, Volume= 0.277 af, Atten= 94%, Lag= 266.4 min Primary = 0.15 cfs @ 16.83 hrs, Volume= 0.277 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 125.01'@ 16.83 hrs Surf.Area= 0.382 ac Storage= 0.181 of Plug-Flow detention time= 722.6 min calculated for 0.277 of (94% of inflow) Center-of-Mass det. time= 689.9 min ( 1,573.9 - 884.0 ) Volume Invert Avail.Storage Storage Description #1 124.50' 2.464 of Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (acres) (feet) (acre-feet) (acre-feet) (acres) 1 124.50 0.322 508.0 0.000 0.000 0.322 125.00 0.382 539.0 0.176 0.176 0.382 126.00 0.418 558.0 0.400 0.576 0.422 127.00 0.451 577.0 0.434 1.010 0.463 128.00 0.459 596.0 0.455 1.465 0.506 129.00 0.499 615.0 0.479 1.944 0.550 130.00 0.541 751.0 0.520 2.464 0.890 I Device Routing Invert Outlet Devices #1 Primary 124.50' 12.0" x 86.0' long Culvert RCP, sq.cut end projecting, Ke= 0.500 1 Outlet Invert= 123.50' S=0.0116'/' Cc= 0.900 n=0.013 #2 Device 1 124.50' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 125.95' 4.00'x 4.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 1 #4 Secondary 128.25' 30.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.15 cfs @ 16.83 hrs HW=125.01' (Free Discharge) t-1=Culvert (Passes 0.15 cfs of 0.99 cfs potential flow) L2=Orifice/Grate (Orifice Controls 0.15 cfs @ 3.00 fps) 3=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=124.50' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) i 1 r 1 1 1 1 1 1 1 1 1 1 1 1 0 C) n i ?1- N N U J J c 0 c Cl) cu U) O O N NOS N U rn °6 o EO c Y n U O O "D r) Q IL ao m ? 2 .y O CL LO C? G m co 'a C O IL t R O A 3ocac o o I E c O a ui (SIO) mou O co LO M LO It LO N LO O LO 00 IT O v N O co M CO M It M N M O O? M ? O N N 14, N N N O N co (O r N_ O co M N i 1 WATER QUALITY POND CALCULATIONS Project Name NCCAR - BMP #5 Project Number 04921-0003 Date April 17, 2008 3rd revision 2nd revision 1 st revision i 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Drainage Area Data Project Project No. Date Total site area NCCAR - BMP #5 04921-0003 April 17, 2008 430,393 square feet = acres Dra inage area to pond Other Drai nage Area Impervious areas Existing [sf] Proposed [sf] Change [sf] Existing [sf] Proposed [sf] On-site buildings 0 0 0 0 0 On-site streets 0 0 0 0 0 On-site parkin 0 0 0 0 0 On-site sidewalks 0 0 0 0 0 Other on-site 0 297,357 297,357 0 0 Total off-site impervious 0 0 0 0 0 Total Impervious 0 297,357 297,357--- f- 0 0 Drainage area to pond Other Dra inage Area Non-impervious areas On-site grass/landscape Existing [sf] 0 Proposed [sf] 137,267 Change [sf] 137,267 Existing [sf] 0 Proposed [sf] 0 On-site woods 0 0 0 0 0 Other undeveloped 0 0 0 0 0 Total off-site non-impervious 0 0 0 0 0 Total non-impervious 0 137,267 137,267 0 0 Total Drainage Area 430,393 430,393 0 3,167,850 3,167,850 Percent Impervious 0.0 69.1 69.1 0.0 0.0 Notes: BMP #5.xls Site Drainage Area Data Page 1 of 1 9.88 Printed 4/16/2008 3:27 PM 1 1 Water Quality Pond Surface Area Calculations Project Project No Date NCCAR - BMP #5 04921-0003 April 17, 2008 Total on-site drainage area to pond 430,393 square feet Total impervious area in drainage area 297,357 square feet Average water depth of basin at normal pool 3.0 feet Location of site Site region % Impervious cover Northampton County Piedmont 69.1 percent If the site is in a coastal area, will a vegetative filter be used? n/a Surface Area/Drainage Area Ratios: For a site in the Piedmont 2.8 percent For a site in a Coastal County w/ Vegetative Filter 5.9 percent For a site in a Coastal County w/out Vegetative Filter 8.0 percent Required surface area of pond: For a site in the Piedmont 12,210.0 square feet For a site in a Coastal County w/ Vegetative Filter 25,440.0 square feet For a site in a Coastal County w/out Vegetative Filter 34,440.0 square feet Notes: BMP #5.xls Pond Surface Area Calcs Page 1 of 1 Printed 4/16/2008 3:27 PM 1 1 1 Water Quality Pond Stormwater Runoff Volume Calculations Project NCCAR -BMP #5 Project No. 04921-0003 Date April 17, 2008 Drainage area 430,393 square feet Impervious area 297,357 square feet Rainfall depth 1.00 inches Percent Impervious 69.1 percent R(v)=0.05+0.009*(Perce nt impervious) Runoff coefficient - R(v) 0.67 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 24,095.1 cubic feet Notes: BMP #5.xls Runoff Volume Calcs Page 1 of 1 Printed 4/16/2008 3:27 PM t Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Temporary Pool Project NCCAR - BMP #5 Project No. 04921-0003 Date April 17, 2008 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 124.5 0 14,030.0 0.322 14,030.0 0.3 0.0 0.0 0.0 0.0 125 0.5 16,647.0 0.382 2,617.0 0.1 7,669.3 0.2 7,669.3 0.2 125.95 1.45 18,209.0 0.418 1,562.0 0.0 16,556.6 0.4 24,225.9 0.6 126 1.5 19,651.0 0.451 1,442.0 0.0 946.5 0.0 25,172.4 0.4 127 2.5 19,996.0 0.459 345.0 0.0 19,823.5 0.5 44,995.9 0.5 128 3.5 21,755.0 0.499 1,759.0 0.0 20,875.5 0.5 65,871.4 0.9 129 4.5 23,571.0 0.541 1,816.0 0.0 22,663.0 0.5 88,534.4 1.0 130 5.5 26,148.0 0.600 2,577.0 0.1 24,859.5 0.6 113,393.9 1.1 BMP #5.xls Stage Storage (Temp Pool) Page 1 of 1 Printed 4/16/2008 3:27 PM F 1 1 Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Permanent Pool Project NCCAR - BMP #5 Project No. 04921-0003 Date April 17, 2008 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 118 0 1,912.0 0.044 1,912.0 0.0 0.0 0.0 0.0 0.0 119 1 2,799.0 0.064 887.0 0.0 2,355.5 0.1 2,355.5 0.1 120 2 4,678.0 0.107 1,879.0 0.0 3,738.5 0.1 6,094.0 0.1 121 3 6,045.0 0.139 1,367.0 0.0 5,361.5 0.1 11,455.5 0.2 122 4 7,521.0 0.173 76.0 0.0 6,783.0 0.2 18,238.5 0.3 123 5 9,111.0 0.209 90.0 g 0.0 8,316.0 0.2 26,554.5 0.3 124 6 10,814.0 0.248 03.0 0.0 9,962.5 0.2 36,517.0 0.4 124.5 6.5 14,030.0 0.322 3,216.0 0.1 6,211.0 0.1 42,728.0 0.4 BMP #5.xls ' Stage Storage (Perm Pool) Page 1 of 1 Printed 4/16/2008 3:27 PM 11 1 1 Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Forebay Project NCCAR - BMP #5 Project No. 04921-0003 Date April 17, 2008 Contour ID Stage Area [s q. ft. Area acres Incremental Area s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 120 0 941.0 0.022 941.0 0.0 0.0 0.0 0.0 0.0 121 1 1,310.0 0.030 369.0 0.0 1,125.5 0.0 1,125.5 0.0 122 2 1,735.0 0.040 425.0 0.0 1,522.5 0.0 2,648.0 0.1 123 3 2,217.0 0.051 482.0 0.0 1,976.0 0.0 4,624.0 0.1 124 4 2,756.0 0.063 539.0 0.0 2,486.5 0.1 7,110.5 0.1 124.5 4.5 3,832.0 0.088 1,076.0 0.0 1,647.0 0.0 8,757.5 0.1 BMP #5.xls Stage Storage (Forebay) Page 1 of 1 Printed 4/16/2008 3:27 PM f 1 1 Water Quality Basin Dewatering Time Calculations Project NCCAR - BMP #5 Project No. 04921-0003 Date April 17, 2008 Maximum surface area of basin 18,209.0 square feet Maximum head of water above dewatering hole 1.45 feet Orifice coefficient 0.60 Diameter of each hole 3.0 inches Number of holes 1 Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for basin = Dewatering time for basin = Notes: 0.049 square feet 7.1 square inches 0.049 square feet 7.1 square inches 51.5 hours 2.1 days 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Summary Information Project NCCAR - BMP #5 Project No. 04921-0003 Date April 17, 2008 Drainage area to pond 430,393 square feet = Impervious area in drainage area 297,357 square feet = Bottom of pond elevation 120.00 feet Normal pool elevation 124.50 feet Pond volume at normal pool 38,431 cubic feet 9.88 acres 6.83 acres Required volume for design rainfall 24,095 cubic feet Required surface area for pond 12,210 square feet Volume provided for storage of design rainfall = 24,226 cubic feet at elevation 125.95 Surface area provided at normal pool 14,030 square feet BMP #5.xls Summary Data Page 1 of 1 Printed 4/16/2008 3:28 PM 1 1 1 1 1 1 1 1 1 00 M C) 0 Q o C) N 9 V IN 1041 v m 0 Cl) o 'o o d N 7 U M U C LO co V Q m lo (.)I U Z 0 m Cl) a) s U C r r LL 0 00LO N Lf) N M O M?-d' 00 LO Q" (D 0 Lf) 0 L V' M LO (O M M O O O)o ,q V O r M r-- O (C s- lA C (D (fl O M N a) ? U O E ` (D ° o V tea) a) U C a L rn E> O p CL o D c O to O c .?v w a ) 'o E C am a) j U> m N ,. 3: Q s L L9 O ,, O O U? . J a) O O U- 0) O r+ "a C ED L C C Q c U m 2 'R) C a) J a) CL " a) a) (D a O c 7 ;o v ? 0 (n «t (nn t n 0 0 a) 0 'D 0 cu cu a) a) Q' CE ?: E ip-0'? U m F- Q> m m wU) U U U Q (M N LO 00 O CV) Cf) LO (n 00 co co ? C IL co Cfl O LO LO N 00 a? U U O O E > O L N U- L ' a) 0 > N c p) +J +? C 0) (n C C ? a) .- cn a) O U > m ? 0 a) a) N a) c?0 U m w w? m w l- LL 1 1 1 1 1 1 1 1 1 1 1 1 1 f Jr ?rt•.•???.•?•::.: :>?:>??. : DATE DESIGN PHASE ..: fib :.: wn+n:v.vn•:::: ?i :•:::: n:.:...... :xF..: rn:v::: n•:::;.+.::i: n:vv: n•n.:: r:.:::•i:•ii:•iii:•:i•$ii:4:tf:::::•:t:•,?jig:•,::,::::i:.'•:??:ii::::+iii?: 04/21/08 PRELIM PROJECT NAME PROJECT NO CONSTR NCCAR 4921-0003 REVISION LOCATION BY RECORD Garysburg, NC GCA OTHER BMP #5 CHECKED BY (SPECIFY) GML Storm Outlet Structure Structure= BMP #5 Size= 12 in Q1o = 6.08 cfs Qfull = 3.83 cfs Vfull = 4.88 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Q1o/Qfull = 1.59 VNfull = 1.59 V = 7.7 fps Zone = 2 D5o = 8 in DMAx = 12 in Riprap Class = B Apron Thickness = 12 in Apron Length = 6.0 ft Apron Width = 3xDia = 3 ft 0 ' BMP #6 Type 1124-hr Rainfall=2.81" Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/16/2008 Subcatchment 1S: BMP #6 - Pre-Development ' Runoff = 8.45 cfs @ 12.99 hrs, Volume= 1.809 af, Depth> 0.77" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr Rainfall=2.81" ' Area (ac) CN Description 28.330 74 Pasture/grassland/range, Good, HSG C ' 28.330 Pervious Area Tc Length Slope Velocity Capacity Description ' (min) (feet) (ft/ft) (ft/sec) (cfs) 43.9 250 0.0070 0.10 Sheet Flow, Grass: Dense n= 0.240 P2= 3.40" ' 36.7 3,025 0.0073 1.38 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 80.6 3,275 Total 1 1 1 1 1 co N L d' N N R U J J Q N N U 06 E Y U ?D _0 G. a m ? w O C Tom Lo N N II M c? O CO p M Z V . W s *3 i ? co C = N CL II W c Ii L ? ? ? C Q 75 O o O r. O L - .. - a ? a a 42 W N U v r L Q? E s ea v Cl) f- (O LO IT M N (S;O) mou ICT N CO N N N N O N 0) 00 CD r LO O M t d r r 0 rn 00 LO M N BMP #6 Type// 24-hr Rainfall=2.81" Prepared by McKim & Creed, PA HydroCADO 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/16/2008 i Subcatchment 2S: BMP #6 - Post-development Runoff = 30.62 cfs @ 12.66 hrs, Volume= 5.045 af, Depth> 2.14" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr Rainfall=2.81" Area (ac) CN Description 24.080 98 Paved parking & roofs 4.250 74 >75% Grass cover, Good, HSG C 28.330 94 Weighted Average 4.250 Pervious Area 24.080 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) ' 30.5 300 0.0250 0.16 Sheet Flow, Grass: Dense n= 0.240 P2= 3.40" 34.5 2,975 0.0050 1.44 Shallow Concentrated Flow, ' Paved Kv= 20.3 fps 65.0 3,275 Total u n ' BMP #6 Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC Type// 24-hr Rainfall=2.81" 4/16/2008 Pond 3P: BMP #6 - Pond Design Inflow Area 28.330 ac, Inflow Depth > 2.14" Inflow 30.62 cfs @ 12.66 hrs, Volume= 5.045 of Outflow = 6.62 cfs @ 14.00 hrs, Volume= 3.097 af, Atten= 78%, Lag= 80.7 min Primary = 6.62 cfs @ 14.00 hrs, Volume= 3.097 of Secondary = 0.00 cfs @ 2.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 2.00-24.00 hrs, dt= 0.05 hrs 1 Peak Elev= 121.97'@ 14.00 hrs Surf.Area= 1.261 ac Storage= 2.879 of Plug-Flow detention time= 234.7 min calculated for 3.097 of (61 % of inflow) Center-of-Mass det. time= 134.8 min ( 968.9 - 834.1 ) Volume Invert Avail.Storage Storage Descrip tion #1 119.50' 7.035 of Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (acres) (feet) (acre-feet) (acre-feet) (acres) 119.50 1.011 962.0 0.000 0.000 1.011 120.00 1.124 994.0 0.534 0.534 1.126 121.00 1.193 1,013.0 1.158 1.692 1.199 ' 122.00 1.263 1,031.0 1.228 123.00 1.335 1,050.0 1.299 2.920 4.218 1.270 1.347 124.00 1.408 1,069.0 1.371 5.590 1.424 125.00 1.482 1,088.0 1.445 7.035 1.503 1 Device Routina Invert Outlet Devices #1 Primary 117.70' 12.0" x 58.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 117.30' S=0.0069'/' Cc= 0.900 n=0.013 #2 Device 1 119.50' 5.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 121.20' 4.00'x 4.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 123.40' 30.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=6.62 cfs @ 14.00 hrs HW=121.97' (Free Discharge) t1=Culvert (Barrel Controls 6.62 cfs @ 8.43 fps) 2=Orifice/Grate (Passes < 0.99 cfs potential flow) L ' 3=Orifice/Grate (Passes < 35.17 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 2.00 hrs HW=119.50' (Free Discharge) t4=Broad-Crested Rectangular Weir (Controls 0.00 cfs) 1 co N 1 1.2 C N N F- .N d 0 M C O CL m a U ? J m J 0 M 0 O a 0 U) 0 Q U 0 0- C? O N a 0 a? UN rn °6 o Eo c Yn v ?o 0 A OD NU a Qo m ? 2 O. L O L i 0 3 Z? 0caC O .,I E u 5.c 0 CL (00 ie¦ (SID) MO1j ICT N M N N N N O N CX) LO r L M ,_ r v 0 r O rn co rl- CD LO V' M N BMP #6 Type 1124-hr Rainfall=1.00" Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/16/2008 Pond 3P: BMP #6 - Pond Design Inflow Area = 28.330 ac, Inflow Depth = 0.50" Inflow = 7.11 cfs @ 12.69 hrs, Volume= 1.189 of Outflow = 0.48 cfs @ 17.83 hrs, Volume= 1.045 af, Atten= 93%, Lag= 308.2 min Primary = 0.48 cfs @ 17.83 hrs, Volume= 1.045 of Secondary = 0.00 cfs @ 2.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 2.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 120.24'@ 17.83 hrs Surf.Area= 1.140 ac Storage= 0.804 of Plug-Flow detention time= 893.0 min calculated for 1.044 of (88% of inflow) Center-of-Mass det. time= 834.8 min ( 1,719.1 - 884.3 ) Volume Invert Avail.Storage Storage Description #1 119.50' 7.035 of Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (acres) (feet) (acre-feet) (acre-feet) (acres) 119.50 1.011 962.0 0.000 0.000 1.011 120.00 1.124 994.0 0.534 0.534 1.126 121.00 1.193 1,013.0 1.158 1.692 1.199 122.00 1.263 1,031.0 1.228 2.920 1.270 123.00 1.335 1,050.0 1.299 4.218 1.347 124.00 1.408 1,069.0 1.371 5.590 1.424 125.00 1.482 1,088.0 1.445 7.035 1.503 Device Routing Invert Outlet Devices #1 Primary 117.70' 12.0" x 58.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 117.30' S= 0.0069T Cc= 0.900 n= 0.013 #2 Device 1 119.50' 5.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 121.20' 4.00'x 4.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 123.40' 30.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.48 cfs @ 17.83 hrs HW=120.24' (Free Discharge) t-1=Culvert (Passes 0.48 cfs of 4.82 cfs potential flow) ?__3=Orifice/G 2=Orifice/G rate (Orifice Controls 0.48 cfs @ 3.51 fps) rate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 2.00 hrs HW=119.50' (Free Discharge) L4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 0 Q) u Ct) N U J J N a O O N U N rn °6 o Eoc _ Y n U 00 Aco -0 O co -00 U o m ? 2 C .y Q M C O a CL m m a M C O CL Q O 2 z cu o c o-oo ?Oacn io¦s (SIO) MO1j 0 0 00 LO LO v LO N LO O LO CC) qq CO It d' N 14 O lq* 00 co CD ch ,,;r .-. M 7 N O M = 0 co Q .0 9 N 1- N V N N N O N co r co r r N 0 co CD v N 1 1 1 1 1 1 1 1 1 1 WATER QUALITY POND CALCULATIONS Project Name NCCAR - BMP #6 Project Number 04921-0003 Date April 17, 2008 3rd revision 2nd revision 1 st revision Water Quality Pond Drainage Area Data Project Project No. Date NCCAR -BMP #6 Total site area 04921-0003 April 17, 2008 1,233,932 square feet = 28.33 acres 1 1 1 1 1 1 Drai nage area to pond Other Drai nage Area Impervious areas Existing [sf] Proposed s Change s Existing [sf] Proposed [s On-site buildings 0 0 0 0 0 On-site streets 0 0 0 0 0 On-site parking 0 0 0 0 0 On-site sidewalks 0 0 0 0 0 Other on-site 0 1,048,845 1,048,845 0 0 Total off-site impervious 0 0 0 0 0 Total impervious 0 1,048,845 1,048,845 0 0 Dra inage area to pond Other Drai nage Area Non-impervious areas Existing [sf] Proposed [sf] Change [s Existing [sf] Proposed [sf] On-site grass/landscape 0 137,267 137,267 0 0 On-site woods 0 0 0 0 0 Other undeveloped 0 0 0 0 0 Total off-site non-impervious 0 0 0 0 0 Total non-impervious 0 137,267 137,267 0 0 Total Drainage Area 1,233,932 1,233,932 0 3,167,850 3,167,850 Percent Impervious 0.0 85.0 85.0 0.0 0.0 Notes: BMP #6.xls Site Drainage Area Data Page 1 of 1 Printed 4/16/2008 3:36 PM 1 Water Quality Pond Surface Area Calculations Project Project No Date NCCAR - BMP #6 04921-0003 April 17, 2008 Total on-site drainage area to pond 1,233,932 square feet Total impervious area in drainage area 1,048,845 square feet Average water depth of basin at normal pool 3.0 feet Location of site Northampton County Site region Piedmont % Impervious cover 85.0 percent If the site is in a coastal area, will a vegetative filter be used? n/a Surface Area/Drainage Area Ratios: For a site in the Piedmont 3.6 percent For a site in a Coastal County w/ Vegetative Filter 7.2 percent For a site in a Coastal County w/out Vegetative Filter 10.1 percent Required surface area of pond: For a site in the Piedmont 43,810.0 square feet For a site in a Coastal County w/ Vegetative Filter 88,230.0 square feet For a site in a Coastal County w/out Vegetative Filter 124,020.0 square feet Notes: BMP #6.xls Pond Surface Area Calcs Page 1 of 1 Printed 4/16/2008 3:36 PM 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Stormwater Runoff Volume Calculations Project NCCAR - BMP #6 Project No. 04921-0003 Date April 17, 2008 Drainage area 1,233,932 square feet Impervious area 1,048,845 square feet Rainfall depth 1.00 inches Percent Impervious 85.0 percent R(v)=0.05+0.009*(Perce nt impervious) Runoff coefficient - R(v) 0.82 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 83,804.8 cubic feet Notes: BMP #6.xls Runoff Volume Calcs Page 1 of 1 Printed 4/16/2008 3:36 PM 11 I 1 1 Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Temporary Pool Project NCCAR - BMP #6 Project No. 04921-0003 Date April 17, 2008 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 119.5 0 44,048.0 1.011 44,048.0 1.0 0.0 0.0 0.0 0.0 120 0.5 48,940.0 1.124 4,892.0 0.1 23,247.0 0.5 23,247.0 0.5 121 1.5 51,952.0 1.193 3,012.0 0.1 50,446.0 1.2 73,693.0 1.7 121.2 1.7 52,561.0 1.207 609.0 0.0 10,451.3 0.2 84,144.3 1.4 122 2.5 55,018.0 1.263 2,457.0 0.1 43,031.6 1.0 127,175.9 1.2 123 3.5 58,142.0 1.335 3,124.0 0.1 56,580.0 1.3 183,755.9 2.3 124 4.5 61,323.0 1.408 3,181.0 0.1 59,732.5 1.4 243,488.4 2.7 125 5.5 64,560.0 1.482 3,237.0 0.1 62,941.5 1.4 306,429.9 2.8 BMP #6.xls Stage Storage (Temp Pool) Page 1 of 1 Printed 4/16/2008 3:36 PM 11 1 1 I Water Quality Pond Volume Calculations Stage-Storage Data for Pond -Permanent Pool Project NCCAR -BMP #6 Project No. 04921-0003 Date April 17, 2008 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 113 0 14,648.0 0.336 14,648.0 0.3 0.0 0.0 0.0 0.0 114 1 16,467.0 0.378 1,819.0 0.0 15,557.5 0.4 15,557.5 0.4 115 2 18,343.0 0.421 1,876.0 0.0 17,405.0 0.4 32,962.5 0.8 116 3 28,480.0 0.654 10,137.0 0.2 23,411.5 0.5 56,374.0 0.9 117 4 31,677.0 0.727 3,197.0 0.1 30,078.5 0.7 86,452.5 1.2 118 5 34,987.0 0.803 3,310.0 0.1 33,332.0 0.8 119,784.5 1.5 119 6 38,522.0 0.884 3,535.0 0.1 36,754.5 0.8 156,539.0 1.6 119.5 6.5 44,048.0 1.011 5,526.0 0.1 20,642.5 0.5 177,181.5 1.3 BMP #6.xls Stage Storage (Perm Pool) Page 1 of 1 Printed 4/16/2008 3:37 PM 1 1 Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Forebay Project NCCAR - BMP #6 Project No. 04921-0003 Date April 17, 2008 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 116 0 8,204.0 0.188 8,204.0 0.2 0.0 0.0 0.0 0.0 117 1 9,412.0 0.216 1,208.0 0.0 8,808.0 0.2 8,808.0 0.2 118 2 10,677.0 0.245 1,265.0 0.0 10,044.5 0.2 18,852.5 0.4 119 3 11,998.0 0.275 1,321.0 0.0 11,337.5 0.3 30,190.0 0.5 119.5 3.5 14,138.0 0.325 2,140.0 0.0 6,534.0 0.2 36, 724.0 0.4 BMP #6.xls Stage Storage (Forebay) Page 1 of 1 Printed 4/16/2008 3:37 PM Water Quality Basin Dewatering Time Calculations Project NCCAR - BMP #6 Project No. 04921-0003 Date April 17, 2008 Maximum surface area of basin Maximum head of water above dewatering hole Orifice coefficient Diameter of each hole Number of holes Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for basin = Dewatering time for basin = 52,561 square feet 1.7 feet 5.0 inches 0.136 square feet 19.6 square inches 0.136 square feet 19.6 square inches 58.0 hours 2.4 days Notes: i Water Quality Pond Summary Information Project NCCAR - BMP #6 Project No. 04921-0003 Date April 17, 2008 Drainage area to pond 1,233,932 square feet = Impervious area in drainage area 1,048,845 square feet = Bottom of pond elevation 114.00 feet Normal pool elevation 119.50 feet Pond volume at normal pool 161,540 cubic feet 28.33 acres 24.08 acres Required volume for design rainfall 83,805 cubic feet Required surface area for pond 43,810 square feet Volume provided for storage of design rainfall = 84,717 cubic feet at elevation Surface area provided at normal pool 44,048 square feet BMP #6.xls Summary Data Page 1 of 1 121.4 Printed 4/16/2008 3:37 PM 1 1 i 11 00 CO O O Q O O O U c\v U rn m cu a?i U) 2' O IL (Q 7 U N U O a 2 m Q U U Z U U U -0-0-0 NIt (OM 000 r- I? O M ? 000 V N O O LO (D N E (D N ? V U > O LL E LL N m 211 N N C + + C N E L (0 U T L L O ?.N m U) 2 O C O? _ N N N O > C U co Of L L L N N N (?D L N O O U co waf mwi-- LL N L U C M N m U U L L LL .2 L U O OOO It (D C) O O O0O C) C) LO C) O O (n O (D MIct O U*) (0 (0 1l- O O O O O ?J N Vt r M O (b (D V- N (C LO O M N L O U O N (D =3 U N Q _ c C y O U N U- O (D N E -i a) L L CL > N C >O 0 2N O N ca 0 ,, Y a) C U T a) 0 > cu / Cn ' co L C N C C t C p C U N a "O N (6 O C N O_ C .+ -p . N m ) i a) fn cm En a) N '6 C 0 (n $ "p 0 N N m cu C7 Q) a) ??? ?iE 0 o E-¢> mm =(n %:{{ •: ifr r iJl:':'•.titi::ti;:'::::::::i:?i::.: :?<.•?>?? .:. ?<?1. DATE DESIGN PHASE ?',?..,... f ?::?:rr+ti::r.•::: r. /.• r ••.,r, ; l: G'//%rr//.Gib;.?{::s::;di::S:t:••r':::;b':;:: ::: f{{ • • ; {,:{'.::r+.{{•::: {{{.;,,...•,ss'•.••:r:: i • l.......... ::.:;s.{•..J{{/,r ;,;,lll; l: •; :: .::,?„G„w,:;?:?:.;::...: •• .:::fi/ :•:{{{{{{lull{ •...1 { • •llll::CGCrif/,r.;:?:•:il:,`.s•ls .::.,.:::::::::,,{,::,::?.::::^::::i:.i:.ii:.>:.ii{:.... ...>....»> .. r.::•?>?»:::::>::::;:;:?;:>;::::: 04/21/08 PRELIM PROJECT NAME PROJECT NO CONSTR NCCAR 4921-0003 REVISION LOCATION BY RECORD Ga sburg, NC GCA OTHER BMP #6 CHECKED BY (SPECIFY) GML Storm Outlet Structure Structure= BMP #6 Size= 12 in Q1o = 8.40 cfs Qfull = 2.95 cfs Vfull = 7.02 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Quo/Qfull = 2.85 V/Vfull = 1.52 V = 10.7 fps Zone = 2 D5o = 8 in DMAx = 12 in Riprap Class = B Apron Thickness = 12 in Apron Length = 6.0 ft Apron Width = 3xDia = 3 ft 1 ' BMP #7 Type// 24-hr Rainfall=2.81" Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/16/2008 ' Subcatchment 1S: BMP #7 - Pre-deviopment ' Runoff = 6.01 cfs @ 12.57 hrs, Volume= 0.934 af, Depth> 0.78" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr Rainfall=2.81" Area (ac) CN Description 14.460 74 Pasture/grassland/range, Good, HSG C ' 14.460 Pervious Area Tc Length Slope Velocity Capacity Description ' (min) (feet) (ft/ft) (ft/sec) (cfs) 32.3 250 0.0150 0.13 Sheet Flow, Grass: Dense n= 0.240 P2= 3.40" ' 19.1 2,100 0.0130 1.84 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 51.4 2,350 Total 1 1 N i N N U J J N c O O co N O W I"1 4 L O O N N ? U rn 06 NT O EO c Y n U O O >O Q 4t `U CL Qo M m-8 mat 0 c ¦ 4 0 O N ti M 11 N N CO LO a C " d' ? II N V ? LA CL CQL O ?? O p UL ti Ii a m a r C ? ? 41 E _ t V V co U 0 O L M (SID) mou N T O co co LO O LO Iq LO N O O LO CO O lq- lq' ,qT N '4f O d' O co CO M co N 7 M G v M N ? (O N "It N N N O N co T ,^ W T N T O T O CO N I I BMP #7 Type 11 24-hr Rainfall=2.81" Prepared by McKim & Creed, PA HydroCADO 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/16/2008 ' Subcatchment 2S: BMP #7 - Post-development ' Runoff = 20.90 cfs @ 12.36 hrs, Volume= 2.476 af, Depth> 2.05" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr Rainfall=2.81" 0 1 Area (ac) CN Description 11.370 98 Paved parking & roofs 3.090 74 >75% Grass cover, Good, HSG C 14.460 93 Weighted Average 3.090 Pervious Area 11.370 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.5 175 0.0460 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.40" 25.3 2,175 0.0050 1.44 Shallow Concentrated Flow, Paved Kv= 20.3 fas 40.8 2,350 Total 1 BMP #7 Type 1124-hr Rainfall=2.81" Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/16/2008 Pond 3P: BMP #3 - Pond Design Inflow Area = 14.460 ac, Inflow Depth > 2.05" Inflow = 20.90 cfs @ 12.36 hrs, Volume= 2.476 of Outflow = 5.90 cfs @ 13.06 hrs, Volume= 1.508 af, Atten= 72%, Lag= 41.9 min Primary = 5.90 cfs @ 13.06 hrs, Volume= 1.508 of Secondary = 0.00 cfs @ 2.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 2.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 125.77'@ 13.06 hrs Surf.Area= 0.648 ac Storage= 1.333 of Plug-Flow detention time= 219.8 min calculated for 1.504 of (61 % of inflow) Center-of-Mass det. time= 119.5 min ( 940.2 - 820.7 ) Volume Invert Avail.Storage Storage Description #1 123.50' 3.335 of Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (acres) (feet) (acre-feet) (acre-feet) (acres) 123.50 0.490 635.0 0.000 0.000 0.490 124.00 0.565 666.0 0.264 0.264 0.564 125.00 0.611 685.0 0.588 0.851 0.613 126.00 0.659 704.0 0.635 1.486 0.664 127.00 0.708 723.0 0.683 2.170 0.716 128.00 0.802 815.0 0.755 2.924 0.975 128.50 0.841 921.0 0.411 3.335 1.312 Device Routing Invert Outlet Devices #1 Primary 120.50' 30.0" x 63.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 120.00' S= 0.0079 '/' Cc= 0.900 n=0.013 #2 Device 1 123.50' 3.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 125.15' 3.50'W x 3.50' H Vert. Orifice/Grate C= 0.600 #4 Secondary 127.40' 30.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=5.89 cfs @ 13.06 hrs HW=125.77' (Free Discharge) L1=Culvert (Passes 5.89 cfs of 47.36 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.47 cfs @ 7.01 fps) L3=Orifice/Grate (Orifice Controls 5.42 cfs @ 2.52 fps) Secondary OutFlow Max=0.00 cfs @ 2.00 hrs HW=123.50' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 1 1 1 t t t 00 N N N N O ?C:) O N Urn °6 o Eo c Y i U C) O k ?- U a CL 0I m ? 21 C .N d C O a M a m M C O a z Q. m O 2 m a O Z' c 3 - O O O w E U ? O'C N COd? ¦o¦e (SIO) M01:A 14- N co N N N N O N rn co ti LO 'c}' N M t S G1 c-4 E 0 0) co LO v M N BMp #7 Type// 24-hr Rainfall=1.00" Prepared by McKim & Creed, PA HydroCAD® 8.00 s/n 004927 © 2006 HydroCAD Software Solutions LLC 4/16/2008 Pond 3P: BMP #3 - Pond Design Inflow Area = 14.460 ac, Inflow Depth = 0.45" Inflow 4.49 cfs @ 12.39 hrs, Volume= 0.543 of Outflow 0.23 cfs @ 17.35 hrs, Volume= 0.497 af, Atten= 95%, Lag= 297.7 min Primary = 0.23 cfs @ 17.35 hrs, Volume= 0.497 of Secondary = 0.00 cfs @ 2.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 2.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 124.16'@ 17.35 hrs Surf.Area= 0.572 ac Storage= 0.356 of Plug-Flow detention time= 846.0 min calculated for 0.497 of (92% of inflow) Center-of-Mass det. time= 803.3 min ( 1,673.1 - 869.9 ) Volume Invert Avail.Storage Storage Description #1 123.50' 3.335 of Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (acres) (feet) (acre-feet) (acre-feet) (acres) 123.50 0.490 635.0 0.000 0.000 0.490 124.00 0.565 666.0 0.264 0.264 0.564 125.00 0.611 685.0 0.588 0.851 0.613 126.00 0.659 704.0 0.635 1.486 0.664 127.00 0.708 723.0 0.683 2.170, 0.716 128.00 0.802 815.0 0.755 2.924 0.975 128.50 0.841 921.0 0.411 3.335 1.312 Device Routing Invert Outlet Devices #1 Primary 120.50' 30.0" x 63.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 120.00' S=0.0079'/' Cc= 0.900 n=0.013 #2 Device 1 123.50' 3.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 125.15' 3.50'W x 3.50' H Vert. Orifice/Grate C= 0.600 #4 Secondary 127.40' 30.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.23 cfs @ 17.35 hrs HW=124.16' (Free Discharge) t1=Culvert (Passes 0.23 cfs of 35.20 cfs potential flow) ?__3=Oriflce/G 2=Orifice/G rate (Orifice Controls 0.23 cfs @ 3.46 fps) rate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 2.00 hrs HW=123.50' (Free Discharge) t4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) n I 1 1 C) 0 n i r ?f- N N RZ c c c C (2r Uc a °6 c E c c Y cl U c >%« C. ? Na C as C .N d 'C C O IL M it a M2 W M C O CL Q L O L Z m o c a o 0 0- NM® (SIO) MOIJ O CD 0 0 co LO 'IT LO N LO O LO 0 V N d' 0 0 M O M M N 0 Cl) t O co Q 009 N F- O N IT N N N O N co O r N 0 0 O 'IT N WATER QUALITY POND CALCULATIONS Project Name BMP #7 Project Number 04921-0003 Date April 17, 2008 3rd revision 2nd revision 1 st revision 1 1 1 1 1 1 1 1 Water Quality Pond Drainage Area Data Project BMP #7 Project No. 04921-0003 Date April 17, 2008 Total site area 630,043 square feet = 14.46 acres Drai nage area to pond Other Drai nage Area Impervious areas Existing sf] Proposed [sf] Change [s Existing s Proposed sf] On-site buildings 0 0 0 0 0 On-site streets 0 0 0 0 0 On-site parkin 0 0 0 0 0 On-site sidewalks 0 0 0 0 0 Other on-site 0 495,265 495,265 0 0 Total off-site impervious 0 0 0 0 0 Total Impervious 0 495,265 495,265 0 0 Drai nage area to pond Other Drai nage Area Non-impervious areas Existing [sf] Proposed [sf] Change [s Existing [sf] Proposed [sf] On-site grass/landscape 0 137,267 137,267 0 0 On-site woods 0 0 0 0 0 Other undeveloped 0 0 0 0 0 Total off-site non-impervious 0 0 0 0 0 Total non-impervious 0 137,267 137,267 0 0 Total Drainage Area 630,043 630,043 0 3,167,850 3,167,850 Percent impervious 0.0 78.6 78.6 0.0 0.0 Notes: BMP #7.xls Site Drainage Area Data Page 1 of 1 Printed 4/16/2008 3:41 PM t 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Surface Area Calculations Project Project No Date BMP #7 04921-0003 April 17, 2008 Total on-site drainage area to pond 630,043 square feet Total impervious area in drainage area 495,265 square feet Average water depth of basin at normal pool 3.0 feet Location of site Northampton County Site region Piedmont % Impervious cover 78.6 percent If the site is in a coastal area, will a vegetative filter be used? n/a Surface Area/Drainage Area Ratios: For a site in the Piedmont 3.3 percent For a site in a Coastal County w/ Vegetative Filter 6.7 percent For a site in a Coastal County w/out Vegetative Filter 9.2 percent Required surface area of pond: For a site in the Piedmont 20,750.0 square feet For a site in a Coastal County w/ Vegetative Filter 42,150.0 square feet For a site in a Coastal County w/out Vegetative Filter 58,090.0 square feet Notes: BMP #7.xls Pond Surface Area Calcs Page 1 of 1 Printed 4/16/2008 3:41 PM 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Stormwater Runoff Volume Calculations Project BMP #7 Project No. 04921-0003 Date April 17, 2008 Drainage area 630,043 square feet Impervious area 495,265 square feet Rainfall depth 1.00 inches Percent Impervious 78.6 percent R(v)=0.05+0.009*(Perce nt impervious) Runoff coefficient - R(v) 0.76 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 39,770.1 cubic feet Notes: BMP #7.xls Runoff Volume Calcs Page 1 of 1 Printed 4/16/2008 3:41 PM 11 11 ?I 1 1 Water Quality Pond Volume Calculations Stage-Storage Data for Pond -Temporary Pool Project BMP #7 Project No. 04921-0003 Date April 17, 2008 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 123.5 0 21,345.0 0.490 21,345.0 0.5 0.0 0.0 0.0 0.0 124 0.5 24,597.0 0.565 3,252.0 0.1 11,485.5 0.3 11,485.5 0.3 125 1.5 26,624.0 0.611 2,027.0 0.0 25,610.5 0.6 37,096.0 0.9 125.15 1.65 26,933.0 0.618 309.0 0.0 4,016.8 0.1 41,112.8 0.7 126 2.5 28,707.0 0.659 1,774.0 0.0 23,647.0 0.5 64,759.8 0.6 127 3.5 30,847.0 0.708 2,140.0 0.0 29,777.0 0.7 94,536.8 1.2 128 4.5 34,941.0 0.802 4,094.0 0.1 32,894.0 0.8 127,430.8 1.4 128.5 5 36,638.0 0.841 1,697.0 0.0 17,894.8 0.4 145,325.5 1.2 BMP #7.xls Stage Storage (Temp Pool) Page 1 of 1 Printed 4/16/2008 3:41 PM Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Permanent Pool Project BMP #7 Project No. 04921-0003 Date April 17, 2008 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 118 0 5,966.0 0.137 5,966.0 0.1 0.0 0.0 0.0 0.0 119 1 7,169.0 0.165 1,203.0 0.0 6,567.5 0.2 6,567.5 0.2 120 2 10,249.0 0.235 3,080.0 0.1 8,709.0 0.2 15,276.5 0.4 121 3 12,349.0 0.283 2,100.0 0.0 11,299.0 0.3 26,575.5 0.5 122 4 14,617.0 0.336 2,268.0 0.1 13,483.0 0.3 40,058.5 0.6 123 5 17,055.0 0.392 2,438.0 0.1 15,836.0 0.4 55,894.5 0.7 123.5 5.5 21,345.0 0.490 4,290.0 0.1 9,600.0 0.2 65,494.5 0.6 BMP #7.xls Stage Storage (Perm Pool) Page 1 of 1 Printed 4/16/2008 3:41 PM 1 1 Water Quality Pond Volume Calculations Stage-Storage Data for Pond - Forebays Project BMP #7 Project No. 04921-0003 Date April 17, 2008 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 120 0 1,820.0 0.042 1,820.0 0.0 0.0 0.0 0.0 0.0 121 1 2,603.0 0.060 783.0 0.0 2,211.5 0.1 2,211.5 0.1 122 2 3,498.0 0.080 895.0 0.0 3,050.5 0.1 5,262.0 0.1 123 3 4,506.0 0.103 1,008.0 0.0 4,002.0 0.1 9,264.0 0.2 123.5 3.5 6,437.0 0.148 1,931.0 0.0 2,735.8 0.1 11,999.8 0.2 BMP #7.xls Stage Storage (Forebays) Page 1 of 1 Printed 4/16/2008 3:41 PM Water Quality Basin Dewatering Time Calculations Project BMP #7 Project No. 04921-0003 Date April 17, 2008 Maximum surface area of basin 26,933 square feet Maximum head of water above dewatering hole 1.7 feet Orifice coefficient 0.60 Diameter of each hole 3.5 inches Number of holes 1 Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for basin = Dewatering time for basin = 0.067 square feet 9.6 square inches 0.067 square feet 9.6 square inches 59.7 hours 2.5 days Notes: 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Summary Information Project BMP #7 Project No. 04921-0003 Date April 17, 2008 Drainage area to pond 630,043 square feet = 14.46 acres Impervious area in drainage area 495,265 square feet = 11.37 acres Bottom of pond elevation 119.00 feet Normal pool elevation 123.50 feet Pond volume at normal pool 58,927 cubic feet Required volume for design rainfall 39,770 cubic feet Required surface area for pond 20,750 square feet Volume provided for storage of design rainfall = 41,113 cubic feet at elevation 125.15 Surface area provided at normal pool 21,345 square feet BMP #7.xls Summary Data Page 1 of 1 Printed 4/16/2008 3:41 PM i i i t i 00 CO O O ¢ O O U N O v 0) m m (D c 'o o n cu 7 U I9 U a co U U Z U U U -0-0-0 N m N O 0 0 C N r? 1-, O O co 00 0 co O O -- O) O O CO CO co (0 a) U O O U > O U a) U- - 0 a)a)c a ?c N E L L 0 ++ Mn - m 7 a) C 0 c 0 • •- a) O > S U m O . w O L Na)a)c u Na)c?o } co ww ma'F- LL N a) t U C r N LL U U : ?2 U O O O LO LO N co O O (M O O Cfl O 10 100- ? O 00 U') CO co CO O O 1l- O co c) O U-) O Lo - .- r- V) O cD N (6 CO O C M CO rte.. N L 'O U N O E 'c cr U a) ` c o U) aa) L a) ca c Q_ Eo ? a) 0 c cn (D LL Lm O N E c L o .. > O U r 0¢ w O L L te C C V ) W C C L C p 0 =3 a) LL _0 a) N O a c J (? m a) O a) ~ L a) a) W (D (Da) U) U) m (n a)a) - U) T (n m? cn U) a-_ ?ii 3: E ELF- 0 0 F-¢> mm wco 1 1 1 1 1 1 1 1 1 1 ?k•a is?l:{::;:i$5::•'::ii{iiii:•Y. ::: . . ?: f/•.: ri t+l: ': ;tip.. .f. r. S. N.. :}.ter.: :c•1:.::: ATE ESIGN PHASE :.}'.}..::: .... r:.:::......:::::.}.:. ........:::::::• 04/21/08 PRELIM PROJECT NAME PROJECT NO CONSTR NCCAR 4921-0003 REVISION LOCATION BY RECORD Garysburg, NC I GCA OTHER BMP #7 CHECKED BY (SPECIFY) GML Storm Outlet Structure Structure= BMP #7 Size= 30 in Q10 = 26.61 cfs Qfull = 36.40 cfs Vfull = 7.41 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Q1o/Qfull = 0.73 V/Vfull = 0.73 V = 5.4 fps Zone = 2 D50 = 8 in DMAx = 12 in Riprap Class = B Apron Thickness = 12 in Apron Length = 15.0 ft Apron Width = 3xDia = 7.5 ft