Loading...
HomeMy WebLinkAbout20071995 Ver 1_More Info Received_20080423F:? STV/Ralph Whitehead Associates 1000 West Morehead Street, Suite 200 Charlotte, North Carolina 28208 (704)372-1885 tax:(704)372-3393 April 17, 2008 Via FEDERAL EXPRESS North Carolina Division of Water Quality Winston-Salem Regional Office 585 Waughtown Street Winston-Salem, NC 27107 Attention: Ms. Sue Homewood Subject: Request for Additional Information Hartley Drive Widening and Extension p ( k City of High Point, Guilford County, NC I NCDWQ #07-1995 APR USACE Action I.D. #2006-20795 RWA Project No. 3202000 DENR-Mr'-i c. +•;I7 WETLANDS AND STORMIA'ATBR BRMC h Dear Ms. Homewood: On behalf of the City of High Point, STV/Ralph Whitehead Associates, Inc. (STV/RWA) is submitting this letter of intent to submit the additional information that was requested by the Division of Water Quality (DWQ) in a letter addressed to Mr. Keith Pugh of the City of High Point dated January 29th, 2008, after our January 29th, 2008 field visit. Although the requested information was first anticipated to be prepared by the end of March, and then anticipated to be prepared by the middle of April, we now anticipate getting the requested information to your office by the end of April. Therefore, we request that the DWQ keep this project file open in anticipation of these permit materials. The City of High Point has proposed extending and widening the existing Hartley Drive from US 311 (North Main Street) approximately 6,000 feet to the west, to the intersection of Westover Drive and Shadow Valley Road. The City of High Point has contracted STV/RWA to be the acting agent and perform wetland-permitting services for this project that is called "Hartley Drive Widening and Extension". The following information will be submitted to the DWQ as soon as it has been prepared: 1. A copy of the proposed stormwater management plan, including drawings indicating the location of the proposed stormwater treatment systems. an employee-owned company providing quality service since 1912 2. A detailed on-site mitigation plan including plan views, profiles, planting plans, and monitoring proposal. 3. A description of temporary impacts associated with utility relocations. 4. A copy of the response to the USACE public comments received. 5. A profile view and cross section for all the proposed stream culverts. 6. A description and quantification of temporary impacts to streams and wetlands resulting from Sediment and Erosion Control measures. As stated previously, we intend to submit the requested materials to your office before April 30th, 2008. Please do not hesitate to contact either of the undersigned at 704-372- 1885, if you have any questions. Sincerely, STV/RALPH WHITEHEAD ASSOCIATES, INC Brandon Phillips, H.M.M. Sr. Environmental Specialist Michael A. la c , P.W.S. Senior Scienti cc: Keith Pugh, P.E., City of High Point Ian McMillan, DWQ