Loading...
HomeMy WebLinkAbout20060911 Ver 3_Other Agency Comments_20080403c~~ ~~ ~ .~ ~~ IN REPLY REFER TO Regulatory Division DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS Washington Regulatory Field Office P.O. Box 1000 Washington, North Carolina 27889-1000 Apri13, 2008 Subject: Action ID No. SAW 2008-01185 and Nationwide Permit No. 23 (Approved Categorical Exclusions) Dr. Gregory J. Thorpe, Ph.D. Environmental Management Director, PDEA N.C. Department of Transportation 1548 Mail Service Center Raleigh, North Carolina 27699-1548 Dear Dr. Thorpe: "''Gj J'~ Reference your previous permit SAW 2006-41494-174, issued on November 22, 2006, and your subsequent request dated October 30, 2007, to re-authorize the replacement of Bridge No. 53 on NC Highway 102 over Swift Creek, Federal Aid Project No. BRSTP-102 (2), WBS No. 33574.1.1, T.I.P. No. B-4231, Pitt County, North Carolina. The project involves an off site detour and will replace the existing structure in the same location with a 100-foot box beam bridge utilizing top-down construction adversely impacting 0.342 acres of riverine wetlands adjacent to Swift Creek. For the purposes of the Corps of Engineers Regulatory Program, Title 33, Code of Federal Regulations (CFR), Part 330.6, published in the Federal Register on November 22, 1991, lists nationwide permits. Authorization pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act, was provided for activities undertaken, assisted, authorized, regulated, funded or financed, in whole or part, by another Federal agency or department where that agency or department has determined, pursuant to the CEQ Regulation for the Implementing the Procedural Provisions of the National Environmental Policy Act, that the activity, work or discharge is categorically excluded from environmental documentation because it is included within a category of actions which neither individually nor cumulatively have a significant effect on the human environment, and the Office of the Chief of Engineers has been furnished notice of the agency's or department's application for the categorical exclusion and concurs with that determination. Review of this project indicates that the construction of the new bridge will adversely impact 0.342 acres of riverine wetlands consisting of 0.216 acres of permanent fill and 0.126 acres of mechanized land clearing in wetlands. The permanent wetland impacts are for the widening of the approach fills which are needed for the replacement bridge. ~~ i -t-+- ~„~ ~7 Your work is authorized under Nationwide Permit 23, Categorical Exclusion, provided it is accomplished in strict accordance with the enclosed Nationwide Permit Conditions and the following special conditions: a. Compensatory mitigation for the unavoidable impacts to 0.342 acres of riparian wetlands associated with the proposed project shall be provided by the Ecosystem Enhancement Program (EEP), as outlined in the letter dated September 11, 2006, from William D. Gilmore, EEP Director. Pursuant to the EEP Memorandum of Agreement (MOA) between the State of North Carolina and the US Army Corps of Engineers signed on July 22, 2003, the EEP will provide 0.684 acres of restoration equivalent riparian wetlands in the Neuse River Basin (Hydrologic Cataloging Unit 03020202) in accordance with Section X of the MOA. For wetlands, a minimum of 1:1 (impact to mitigation) must be in the form of wetland restoration. The NCDOT shall, within 30 days of the issue date of this permit, certify that sufficient funds have been provided to EEP to complete the required mitigation, pursuant to Paragraph V. of the MOA. b. To avoid adverse impacts to spawning populations offish, anadromous and resident species at the project site, NCDOT will follow the "Stream Crossing Guidelines for Anadromous Fish Passage." c. To avoid adverse impacts to spawning populations offish, anadromous and resident species at this project site, no in-water work will be conducted between February 15 and June 30. For the purpose of this moratorium, in water is defined as those areas that are inundated at mean high water. d. All measures will be taken to avoid any temporary fill from entering into Swift Creek from bridge demolition. Bridge demolition shall follow NCDOT best management practices for construction and maintenance activities dated August 2003 and incorporate NCDOT policy entitled "Bridge Demolition and Removal in Waters of the United States" dated September 20, 1999. e. No bridge demolition debris or excavated or fill material will be placed at any time, in any wetlands or surrounding waters, outside of the alignment of the fill area indicated on the work plans. f. All excavated materials will be confined above normal high water and landward of regularly or irregularly flooded wetlands behind adequate dikes or retaining structures to prevent spillover of solids into any wetlands or surrounding waters. g. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill, or mechanized land-clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands, or any activities that cause the degradation of waters or wetlands, except as authorized by this permit, or any modification to this permit. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. There shall be no excavation from, waste disposal into, or degradation of, jurisdictional waters or wetlands associated with this permit without appropriate modification of this permit, including appropriate compensatory mitigation. This prohibition applies to all borrow and fill activities connected with this project. h. To ensure that all borrow and waste activities occur on high ground and do not result in the degradation of adjacent wetlands and streams, except as authorized by this permit, the permittee shall require its contractors and/or agents to identify all areas to be used to borrow material, or to dispose of dredged, fill, or waste material. The permittee shall provide the USACE with appropriate maps indicating the locations of proposed borrow or waste sites as soon as the permittee has that information. The permittee will coordinate with the USACE before approving any borrow or waste sites that are within 400 feet of any streams or wetlands. The permittee shall ensure that all such areas comply with condition (g) of this permit, and shall require and maintain documentation of the location and characteristics of all borrow and disposal sites associated with this project. This information will include data regarding soils, vegetation and hydrology sufficient to clearly demonstrate compliance with the preceding condition (g). All information will be available to the USACE upon request. NCDOT shall require its contractors to complete and. execute reclamation plans for each waste and borrow site and provide written documentation that the reclamation plans have been implemented and all work is completed. This documentation will be provided to the Corps of Engineers within 30 days of the completion of the reclamation work. i. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit,. including all conditions and any Corps approved modifications shall be available at the project site during construction and maintenance of this project. j. Any violation of these conditions or violations of Section 404 of the Clean Water Act or Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District, U.S. Army Corps of Engineers, within 24 hours of the violation. k. Failure to institute and carry out the details of special conditions a. - j., above, may result in a directive to cease all ongoing and permitted work within waters and/or wetlands associated with TIP No. B-4231, or such other remedy as the District Engineer or his authorized representatives may seek. 3 This nationwide permit does not relieve you of the responsibility to obtain any required State or local approval. This verification will remain valid until December 15, 2009. Thank you for your time and cooperation. If you have any questions, you may contact Mr. William Wescott at the Washington Regulatory Field Office, Post Office Box 1000, Washington, North Carolina, 27889, or telephone 252-975-1616, extension 31. Sincerely, ~~L ~ . William Wescott, P.W.S. Project Manager Enclosures Copies Furnished (without enclosures) Mr. Brian Wrenn Water Quality Section North Carolina Division of Environment and Natural Resources 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Mr. Travis Wilson Eastern Region Highway Project Coordinator Habitat Conservation Program 1142 I-85 Service Road Creedmoor, North Carolina 27522 Mr. Gary Jordan U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Ron Sechler National Marine Fisheries Service 101 Pivers Island Beaufort, North Carolina 28516 4 Mr. Chris Militscher U.S. Environmental Protection Agency C/O FHWA, Raleigh Office 310 New Bern Avenue, Room 206 Raleigh, North Carolina 27601 Ms. Kathy Matthews USEPA-Region 4 Wetlands Section 109 T.W. Alexander Drive Durham, North Carolina 27711 Mail Code:El43-04 Mr. William D. Gilmore, P.E. EEP Director North Carolina Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, North Carolina 27699-1652 Mr. Garcy Ward NCDWQ Washington Regional Office 943 Washington Square Mall Washington, North Carolina 27889 BCF: CESAW-RG-W/WESCOTT CESAW-RG-W/LEKSON CESAW-RG/MCLENDON