Loading...
HomeMy WebLinkAbout20080430 Ver 1_More Info Received_20080417A 10133 Sherrill Boulevard, Suite 200 Knoxville, TN 37932 (865) 637-2810 • (865) 673-8554 Fax VIA Mail 40 BARGE U?-' JU WAGGONER .CANNER & CANNON , INC. TO: Ms Cyndi Karoly 401 Unit Supervisor, NCDENR-DWQ 2321 Crabtree Boulevard, Suite 250 DATE: April 11, 2008 FILE NO. 3335300 Raleigh, NC 27215 SUBJECT: American Honda Motor Co. Inc. D Honda Aero, Inc. - Corporate Headquarters and Assembly Facility APR Burlington, North Carolina 7 200$ WEP ANDS AND TORMWA ERR BRANCH TRANSMITTED HEREWITH ARE THE FOLLOWING: NO. COPIES DATE DESCRIPTION 1 02/18/2008 City of Burlington - Letter of Approval, Stormwater Division (Alamance Co. PIN: 8863492287 REMARKS Enclosed is a copy of the Stormwater Permit from Burlington, North Carolina COPY TO: BARGE, WAGGONER, SUMNER AND CANNON, INC. By oel' Z" ?/4' /,Z McHugh F:\33\33353\3335300\Admin\Correspondence\Transmittals\3335300_041108_NCDE NR TM002.doc CITY OF BURLINGTON ?4+aOTON0 P.O. Box 1358 • 234 East Summit Avenue o 0 Burlington, North Carolina 27216-1358 r??? y Telephone: (336) 222-5005 Fax: (336) 222-50048 14 Robert C. Patterson Assistant Public Works Director t. Email: bpatterson@ci.burlington.nc.us n?: r; C www.BurlingtonNC.gov F3 9 ? i!"3 February 18, 2008 LETTER OF APPROVAL - APPROVE WITH MODIFICATIONS Mr. Anthony Piazza American Honda Motor Co., Inc. 1919 Torrance Blvd. Torrance, CA 90501- Subject: Honda Aero, Inc. - Corporate Headquarters & Assembly Facility 2928 Tucker Street Alamance County PIN: 8863492287 Dear Mr. Piazza: The Stormwater Division has reviewed the subject Stormwater Management plans received on 12/04/2007, and revised plans received on 01/17/2008. The Storm-water Division finds the plans acceptable and the hereby issues this "Letter of Approval - APPROVED WITH MODIFICATIONS." Required modifications are listed on the attached page- Enclosed are the Stormwater Management Permit and a copy of the approved Stormwater Management Plan. Please have your contractor notify the Stormwater Division, phone number (336-570-6616), when a preeonstruction conference has been scheduled so that we may attend and discuss the Stormwater Management Plan. The City's Stormwater Ordinance is a performance-oriented program requiring protection of the natural resources and adjoining properties. Following commencement of this project if it is determined that the plan is not meeting the requirements of the ordinance, then this office will require that the plan be modified.to comply with the City's ordinance. Also, please be advised that the ordinance requires that a copy of the approved stormwater management plan be on file at the job site. Per City Ordinance Appendix D, Section 5-503 notice is hereby given that agents, officials, or other qualified persons authorized by the City will periodically inspect any land, building, structure or premises to ensure compliance with the ordinances, or rules or orders adopted or issued pursuant to the ordinance, and to determine whether the measures required in the Plan are effective in controlling stormwater runoff Honda Aero, Inc. - Corporate Headquarters & Assembly Facility Stormwater Permit Letter February 18, 2008 Page 2 of3 resulting from development or redevelopment. Compliance with the City's Erosion and Sedimentdtion Control Ordinance is a The land-disturbing activity described in this plan may be subject to the approval of other local, state or federal agencies. This could include the Division of Water Quality under storm water or water quality regulations; the U.S. Army Corps of Engineers under Article 404;jurisdiction; county, city or town ` agencies under other local ordinances; or other approvals that may be required. This approval cannot supersede any other permit or approval, nor shall it exempt the applicant from obtaining other applipable approvals from local, state, or federal authorities. Your cooperation is appreciated and we look forward to working with you on this project mg: Manager Enclosures c: Mr. James M. Lauritsen, PE Director of Development & Technical Services Mr. Ray Rice Chief Inspector Mr. Nathan E. Mathis, PE Barge, Waggoner, Sumner, & Cannon, Inc. 10133 Sherrill Blvd. Suite 200 Knoxville, TN 37932- Mr. Aubrey Harless Miles McClellan Construction 2987 Tucker Street Burlington, NC 27215 Sincerely, ? 41?N Robert C. Patterson, Jr., PE Interim Public Works Director/ Stormwater Honda Aero, Inc. - Corporate Headquarters & Assembly Facility Stormwater Permit Letter February 18, ?008 Page 3 of 3 Modifications for Approval PROJECT NAME: Honda Aero, Inc. - Corporate Headquarters & Assembly Facility LOCATION: 2928 Tucker Street Burlington, N_C. SUBMITTED BY: Nathan E. Mathis, PE. Barge, Waggoner, Sumner, & Cannon, Inc. DATE RECEIVED: 12/04/2007 & 01/17/2008 (revised) 1. Provide a copy of the Operation and Maintenance Manual for the wet detention pond. 2. Provide a fixed vertical sediment depth marker for measurement of sediment deposition on wet detention pond. ;. Provide dimensions on plan Detail 1/C7.24 for width (perpendicular to flow direction) and height of "teeth" on energy dissipators (6-inch spacing and 6-inch depth parallel to flow direction are given). 4. Any sediment accumulated during site construction in the wet detention pond, the storm drainage piping system or conveyances, or in storm drainage structures shall be removed and properly disposed of prior to final closeout of the stormwater permit. NOTE: Be advised that the above "Modifications" are considered to be part of the approved plan and part of the conditions of the stormwater permit. r ® C N M c3 ? 000 ? v C +? ? ?" ? ? &9 O ... e?i o cs o ^~' N '1 M OG cj o U z ?. ?Z Uy? U w , w+ o c r3 OD Ga >, c ? C F 00 p 4 u = o• a Z 3 -2 o cam? o o y ; rn ? c? p - lit: c C J S. cl C G O O U r .. +? L Q ,..t ^".. O L" n t V3 ?. U in *y y -? 3 ;; z7 G L ?Q C3 +?' p w ?' C H U o v 4) T? u c) O CD n r U en G C S`+ Q - r c r a?i c? p a 1 N C3 V i O C ? "Cy Q ?*'.? ????`` p O O .5 2 r 1 p t• \ i"'n 'r 4?..? •i Ci C3 h^.A 0 ""'' .F +I r ? w"7a V r[t?'???'/1, 11??• V' /"??' O C C1 O C? y ? Q .^ ,,Q/ L],? Q C?,i 1~ U f®1 ® ? FPM } > CJ ? ? ? • Q C.? ? ~ ? ` ? O Ca ?? a o i O e? a is-' Pl en C) r4 Gsa °` r,, w es C ' ? U w VJ ?^ Ca -ct E ,a ° ??, ? r.+ ? c M w m? a r!? ® ?? t Ut n o J c, A a a .9 O b V y r ? ?? x. .ur 'p o? v? N ? ^ Op ++ r.? O a ? d .? N Q Q E Q?1 c y c v; ri M CN 00 0 ? Z ° a?i ? en ` ? ? G7 00 tu .- F•t c/? T v C m o Cfl 2. -S 72 '(--4 r Q' c '7-j C3 C Q i, .. y LQ` q Gr. .?N O «?r W Q M 4 0 N 0-0C) ? (~iA ROJ r, ?` i, u aJ v ? ?y N > kn N W ''cl?r T? u c? o cS O o Q? M U U u+ C y y-. ..? ! jQ! ¢ I? ru0 ell C) 0 O, ° a a ? P-4 HP-tUo -t ? W dO1E HONDA American Honda Motor Co., Inc. 1919 Torrance Boulevard Torrance, CA 905011-2746 Phone (310) 783-2000 March 6, 2008 Ms Cyndi Karoly 401 Unit Supervisor NCDENR - DWQ 2321 Crabtree Boulevard, Suite 250 Raleigh, NC 27604 RE: American Honda Motor Co., Inc, Honda Aero, Inc. - Corporate Headquarters and Assembly Facility Burlington, North Carolina Dear Ms KaroIy: Enclosed for your consideration are the following materials for the referenced project for coverage under Water Quality Certification 4WGC 3704, under the non-express program. • Review Fee (Check payable to N.C. Division of Water Quality in the amount of $570.00). • Project PCN form and attachments (7 sets) The application is for 295 linear feet of stream impact to an Un-Named Drainage tributary to Gunn (a.k.a. Gum.) Creek in the Cape Fear River basin. The drainage feature was characterized as "unimportant" at a pre- application meeting and field review held on November 20, 2007. Mr. Andy Williams and Ms Crystal Amschler attended for COE and Ms. Sue Homewood attended for DWQ. Mr. Williams determined that coverage would fall under NW 14 and that mitigation would not be required. A copy of the meeting notes is included in the PCN package. The project Stormwater Management Plan has been submitted) to the City of Burlington for review under the NPDES Phase II program;: approval documentation will be forwarded separately. The final jurisdictional delineation plats have been presented to Mr. Williams for signature. By copy of this letter, we are forwarding a set of review materials to Ms. Homewood'. Your assistance is greatly appreciated. If you have any questions or require additional information, please call. Yours truly, Brian Quon Project Administrator C: Ms Sue Homewood, DWQ (w/enc.) Mr. Andy Williams, COE Mr. Dan Danieley; BAAA Mr. Eric Stumph, TBI Mr. Nathan Mathis, BWSC