Loading...
HomeMy WebLinkAbout20061944 Ver 2_Approval Letter_20080417OW A ? -i bid, o Niii;?Mwwlwow "C Mr. Shane Robichaud Lonesome Valley Development, LLC 94 Lonesome Valley Road Cashiers, NC 28717 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality April 17, 2008 Re: Lonesome Valley, Jackson County DWQ #20061944; USACE Action ID No. 2007-00110-350 Logan Creek [031302, 4-13-3, C, TR] APPROVAL of 401 Water Quality Certification - MODIFICATION Dear Mr. Robichaud: Attached hereto is a copy of Certification No. 3616 issued to Mr. Shane Robichaud, of the Lonesome Valley Development, LLC, dated April 17, 2008. This Certification replaces the Certification issued to-you on February 23, 2007. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Solid Waste, Sediment and Erosion Control, Stormwater, Dam Safety, Non-discharge and Water Supply Watershed regulations. If we can be of further assistance, do not hesitate to contact us. CHS/cbk/Um Attachments: Certificate of Completion cc: Becky Fox, EPA, 1307 Firefly Road, Whittier, NC 28789 U.S. Army Corps of Engineers, Asheville Regulatory Field Office Wilmington District, USACOE Kevin Barnett, DWQ, Asheville Regional Office DLR Asheville Regional Office File Copy Central Files Clement Riddle, Clear Water Environmental Consultants, Inc., 718 Oakland Street, Hendersonville, NC 28791 Filename: 061944Ver2LonesomeValley(Jackson)401_IC_MOD AT?.. " l1....,. 1:.... ---. a v aa•vau v...... 401 Oversight/Express Review Permits Unit lltlt'Cl1??l,J 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncwetlands An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Shane Robichaud and Lonesome Valley Development, LLC Page 2 of 7 April 17, 2008 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 2H, Section.0500 to Mr. Shane Robichaud of the Lonesome Valley Development, LLC, to fill 0.013 acres of wetland and 444 linear feet of perennial stream in the Savannah River Basin, associated with the construction of the Lonesome Valley residential development located on the north side of Highway 64, near Cashiers, Jackson County, North Carolina, pursuant to an application filed on the 19th day of December of 2006, and received by the DWQ on January 29, 2007, and by Public Notice issued by the U.S. Army Corps of Engineers on January 25, 2007, and received by the DWQ on January 29, 2007, with additional information received from you on October 17, 2007 and March 24, 2008. The application and supporting documentation provides adequate assurance that the proposed work will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval is only valid for the purpose and design submitted in the application materials and as described in the Public Notice. If the project is changed, prior to notification a new application for a new Certification is required. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions of this Certification. Any new owner must notify the Division and request the Certification be issued in their name. Should wetland or stream fill be requested in the future, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). If any plan revisions from the approved site plan result in a change in stream or wetland impact or an increase in impervious surfaces, the DWQ shall be notified in writing and a new application for 401 Certification may be required. For this approval to be valid, compliance with the conditions listed below is required. Conditions of Certification: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Units Plan Location or Reference 404/Wetland 0.013 (acres) Application and Public Notice Stream - perennial 444 linear feet Application and Public Notice Shane Robichaud and Lonesome Valley Development, LLC Page 3 of 7 April 17, 2008 Sediment and Erosion Control: 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the 404/401 Permit Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur; 4. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project; 5. Protective Fencing - The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 213.0233 and GC 3404; 6. No Impacts Beyond those in Application No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. Shane Robichaud and Lonesome Valley Development, LLC Page 4 of 7 April 17, 2008 Continuing Compliance: Mr. Shane Robichaud and the Lonesome Valley Development, LLC, shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the Certification, the Division shall notify Mr. Shane Robichaud and/or the Lonesome Valley Development, LLC, NC and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 21-1.0504. Any new or revised conditions shall be provided to Mr. Shane Robichaud and/or the Lonesome Valley Development, LLC, NC in writing, shall be provided to the United States Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project; Mitigation: 8. Compensatory Mitigation Using Onsite Restoration and Preservation Mitigation must be provided for the proposed impacts. According to your conceptual mitigation plan, referenced on page 3 of the Public Notice issued by the U.S. Army Corps of Engineers on January 25, 2007, and received by the DWQ on January 29, 2007, you will be restoring 570 linear feet of onsite perennial stream, preserving 37,891 linear feet of perennial stream with a minimum 25-foot buffer, and preserving 0.587 acres of wetland with a minimum 25-foot buffer. On February 7, 2008, the DWQ received your final proposed mitigation plan for this project. The DWQ approves your final proposed mitigation plan for this project. 9. Turbidity Standard The turbidity standard of 50 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B .0200. Appropriate sediment and erosion control practices must be used to meet this standard. Shuld there be a violation of the turbidity standard, all work shall cease until such a point the measures are implemented to protect surface waters form further violations. 10. Construction Stormwater Permit NCG010000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is Shane Robichaud and Lonesome Valley Development, LLC Page 5 of 7 April 17, 2008 covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self- monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http://h2o.enr.state.nc.us/su/Forms Documents.htm. 11. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place at the time lots or properties are recorded. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http: //h2o. enr. state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. 12. Temporary Fills All temporary fill and culverts shall be removed and the impacted area returned to the original grade, including each stream's original cross sectional dimensions, planform pattern, and longitudinal bed and bed profile after construction is complete or within 6 months of the establishment of the crossing, which ever is sooner, and the various sites shall be stabilized with natural woody vegetation (except for the maintenance areas of permanent utility crossings) and restored to prevent erosion. If the crossings are not completely removed and restored as described above within the specified time above, additional written approval from this Office must be obtained to modify this condition. 13. Culvert Installation All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual (http•//www ncdot or /g doh/operationsBMP manual/download/BMP Manual.pdf) such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. Culverts required for this project shall be installed. in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting of the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall be re-established or, if the pipes installed in a perched manner, the pipes shall be removed and re-installed correctly. Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each culvert. Shane Robichaud and Lonesome Valley Development, LLC Page 6 of 7 April 17, 2008 The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip-rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. 14. Riparian Zone Replanting Replanting of vegetation within disturbed areas located within 25 feet of the streambank associated with any land disturbing activity, repair, replacement and/or maintenance must be done in a manner consistent with the Guidelines for Riparian Buffer Restoration immediately following construction. (Please see attached.) 15. Culverts that are less than 48 inches in diameter should be installed with 20% of the diameter of the culvert, placed below the level of the stream bottom to allow the accumulation of stream bed materials and to facilitate aquatic life passage during periods of low stream flow. Larger diameter culverts should be placed 1 foot below the stream bottom. Culverts should be placed in the main flow channel (i.e. thalweg). Partial burial of culverts in this manner also may require increasing their size to accommodate flow requirements. 16. If concrete is used during construction (e.g., headwalls), a dry work area must be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts live concrete should not be discharged to surface waters due to the potential for water chemistry change and a fish kill. 17. Rock, sand, or other materials shall not be dredged from the stream channels except in the immediate vicinity of the crossings. Instream dredging has severe effects on aquatic life and disturbance of the natural form of the channel can cause downstream erosion problems. The natural dimension, pattern, and profile of the channels adjacent to the crossings shall not be modified by widening or changing their depths. 18. Sandbags, flexible pipe, or other diversion structures should be used to avoid excavation in flowing water. Materials used for flow diversions should be removed from the streambed after completing the construction work. Any diversion channels must be lined with fabric and/or rock. 19. Any rip-rap placed for inlet or outlet stabilization should be clean and limited to the stream bank below the high water mark and vegetation should be used above. Rip rap must not be placed in stream channels in a manner that obstructs fish passage. 20. All crossings should be constructed as close to perpendicular to the stream channels as possible to minimize stream and buffer disturbance. Road and utility alignments should be set-back as far as possible from stream channels to minimize sedimentation and buffer disturbance. 21. Riparian vegetation, especially trees and shrubs, should be preserved as much as possible. Native woody vegetation (e.g., rhododendron, dog hobble, silky dogwood, sycamore, river birch, red maple) should be reestablished upstream and downstream of the stream crossings if Shane Robichaud and Lonesome Valley Development, LLC Page 7 of 7 April 17, 2008 it is removed during construction to provide bank stability and shading. We encourage the use of native plants that must be removed from permanently disturbed areas. 22. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. 23. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 24. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699- 1650. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. If this Certification is unacceptable to you, you have the right to an adjudicatory hearing upon written request within sixty (60) days following receipt of this Certification. This request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If modifications are made to an original Certification, you have the right to an adjudicatory hearing on the modifications upon written request within sixty (60) days following receipt of the Certification. Unless such demands are made, this Certification shall be final and binding. This the 17`h day of April 8 DIVI ON O W E ALITY Coleen H. Sullins 3616 CHS/cbk/ijm