Loading...
HomeMy WebLinkAbout20031127 Ver 2_More Info Letter_20080418~QF WATFRQ Michael F. Easley, Governor 1~ ~ William G. Ross Jr., Secretary Cq r... North Carolina Department of Environment and Natural Resources ~ ~ p ..~. Coleen H. Sullins, Director Division of Water Quality April 18, 2008 DWQ Project # 03-1127, Ver. 2 Durham County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. D. Glenn Dickson Ninth Street North P.O. Box 3160 Durham, NC 27715-3160 Subject Property: Ninth Street North Phase 2 Redevelopment Project Ut to Ellerbe Creek [030401, 27-5-(0.3), C, NSW] REQUEST FOR MORE INFORMATION Dear Mr. Dickson: On Apri13, 2008, the Division of Water Quality (DWQ) received your application dated Apri12, 2008 to impact 401inear feet of intermittent stream, and 0.00 square feet of Zone 1 Neuse River basin protected riparian buffers, and 0.00 square feet of Zone 2 Neuse River basin protected riparian buffers to construct the site redevelopment project. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and 15A NCAC 2B.0233 will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Please provide cross section details showing the provisions for aquatic life passage. 2. Please indicate all stream impacts including all fill slopes, dissipaters, bank stabilization, and topographic contours (especially for the stream) on the site plan. 3. Please describe the condition of the buffer at your site. 4. Although this Office realizes your stormwater BMP will be reviewed by the City of Durham, we would like to receive a copy of your SMP as well. 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 / Internet: http://h2o enr state.nc.us/ncwetlands Noo`hCarolina ~aturally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Ninth Street North Page 2 of 2 April 18, 2008 Please indicate the diffuse flow provision measures on the site plan and submit diffuse flow provision measure supplement forms (Supplement forms available on the DWQ website at httpa/h2o.enr.state.nc.us/su/bmp forms.htm). Please submit this information within 30 calendar days of the date of this letter. Please contact me in writing and Lauren Witherspoon of the DWQ Raleigh Regional Office. If we do not receive this requested information within 30 calendar days of the date of this letter, your project will be withdrawn and you will need to reapply with a new application and a new fee. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincer y, yndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBK/ijm cc: Lauren Witherspoon, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files William Mullin, Dr. J. H. Carter, III & Associates, Inc., P.O. Box 891, Southern Pines, NC 28388 Filename: 03 l 127 Ver2N inth StreetNorthPhase2 Redevel opmentPro ject(Durham)On_Hold