BUCK STEAM STATION
COMBINED CYCLE PROJECT
STORM WATER MANAGEMENT PLAN DEVELOPMENT
1
Projected Schedule
a. Start surveying of project ......................................................................... 4/24/08
b. Develop topographic drawing with 2 foot contours ......................... .5/31/08
c. Develop grading plans ........................................................... .8/1/08
d. Develop and submit erosion control drawings and calculations ........... . 8/1/08
e. Submit Storm Water Management Plan ....................................... .8/31/08'
f. Obtain approval for Erosion Control Plan .................................... .9/2/08
g. Obtain approval of Storm Water Management Plan ........................ ..9/15/08-
h. Begin grading ......................................................................10/1/08
2. Erosion Control Plan Requirements
a. Drawings to i
i.
ii.
iii.
iv.
V.
vi.
nclude
Existing contours
Proposed contours
Limits of disturbed area
Planned building locations
Location of temporary measures
Location of permanent measure
APR 1 2008
DENR • WA' ER t1UAUtr .
EVE?{ANDS AND ST?RP?WATER gµANCr
b. Storm Water Calculations
i. Pre-construction runoff calculations for each outlet of the project.
ii. Design calculations for peak discharges of runoff.
iii. Design calculations of culverts.
iv. Design calculations of sediment basins.
3. Storm Water Management Plan Requirements
a. Preliminary Plans
i. Preliminary site plan divided into drainage areas.
ii. Proposed BMPs
iii. Proposed sizing of BMPs
iv. Proposed locations of BMPs F2_0 b. Final Plans me??
i. Construction plans
ii. Specifications 0s
iii. BMP Worksheets
iv. Supporting Calculations
to AXfL cd-
2
?jC
.O?OF W A T ?9QG
? ?¦ J r
>Iy
C) 144111::?
Michael F. Easley
Governor
William G. Ross, Jr., Secretary
NCDENR North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E., Director
September 10, 2004
Mr. Michael Ruhe
Environmental Support
Duke Power
P.O. Box 1006
Charlotte, North Carolina 28201
D E C E I V E
SEP 141001
_EH&S
Subject: Issuance of NPDES Permit N00004774
Buck Steam Station
Rowan County
Dear Mr. Ruhe:
Division personnel have reviewed and approved your application for renewal of the subject permit.
Accordingly, we are forwarding the attached NPDES discharge permit. This permit is issued pursuant to the
requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North
Carolina and the U.S. Environmental Protection Agency dated May 9, 1994 (or as subsequently amended).
This final permit includes no major changes,from the draft permit sent to you on June 23, 2004.
If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to
you, you have the right to an adjudicatory hearing upon written request within thirty (30) days following receipt of
this letter. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina
General Statutes, and filed with the Office of Administrative Hearings (6714 Mail Service Center, Raleigh, North
Carolina 27699-6714). Unless such demand is made, this decision shall be final and binding.
Please note that this permit is not transferable except after notice to the Division. The Division may require
modification or revocation and reissuance of the permit. This permit does not affect the legal requirements to obtain
other permits which may be required by the Division of Water Quality or permits required by the Division of Land
Resources, the Coastal Area Management Act or any other Federal or Local governrriLntal permit that may be
required. If you have any questions concerning this permit, please contact Sergei Chernikov at telephone number
(919) 733-5083, extension 594.
o C,@NR0WC9 D
APR 1 8 2008
DENR. WAFER QUALITY
WETLANDS AND STORMWATER BRANCH
cc: Central Files
Mooresville Regional Office/Water Quality Section
NPI) S Unit
Aquatic Toxicology tlnit
Mr_ Roosevelt Childress, ETA Region IV
N. C. Division of Water Quality / NPDES Unit
1617 Mail Service Center, Raleigh, NC 27699-1617
Internet: h2o.enr.state.nc.us
Sincerely,
Alan W. Klimek, P
Ca1ve?ec.-
MC-0,fi>nq
A??ch "i V ( / (0, Z-0 Q8 .
Phone: (919) 733-5083
fax: (919) 733-0719
DENR Customer Service Center: 1 800 623-7748
Permit No. N00004774
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
PERMIT
TO DISCHARGE WASTEWATER UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of,North Carolina General Statute 143-215.1, other lawful standards
and regulations promulgated and adopted by the North Carolina Environmental Management
Commission, and the Federal Water Pollution Control Act, as amended,
Duke Power Company
is hereby authorized to discharge wastewater from a facility located at
Buck Steam Station
Dukesville Road
Salisbury
Rowan County
to receiving waters designated as the Yadkin River in the Yadkin-Pee Dee River Basin
in accordance with effluent limitations, monitoring requirements, and other conditions set forth in Parts I,
II. III and IV hereof.
This permit shall become effective October 1, 2004.
This permit and authorization to discharge shall expire at midnight on June 30, 2009.
Signed this day August 20, 2004.
Alan Klimek, P.l., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit No. N00004774
SUPPLEMENT TO PERMIT COVER SHEET
Duke Power Company
is hereby authorized to:
Continue to discharge once-through non-contact cooling water through outfall 001, treated
wastewater from the ash basin through outfall 002, and yard sump overflows-through outfall 002A.
Outfalls 002 and 002A consist of coal pile runoff, ash transport water, metal cleaning wastes,
treated domestic wastewater, remediated groundwater, low volume wastes, and boiler blowdown.
All discharges result from activities at Duke Power's Buck Steam Station on Dukesville Road in
Salisbury, Rowan County; and
Discharge from said treatment works at the location specified on the attached map into the Yadkin
River which is classified WS-IV, B waters in the Yadkin-Pee Dee River Basin.
r ,1?1ti•'?t _,..,^„ t ? ? 'yS,t:\5??? ?-?'`?• ° F ??f^? ? ? f+l tc,; I ,•,? ••. ?I •??r r . ti?
7{I t:? ^ :,1?`•.i i1 +lt} ?, -? J 1-._`? + 1 i !,? ?? ?• S 4, I r?1
;;.•?;.•• ??• ••? '--?, ? yti ( _ 1 _.' r ,.v?? l }' ,1s l , t ,1! -'----• , ;?? ? S +?e7 ,, ' ? ?• •, •` ? J`
L?':}?'?i rti 1/
r { .r'- '~ ?., .`"?j? + i rr fJIT' ? , , tl ' r' '?' ,+ ;'' -••J' ? ? l ? ` 2\_\/`I ?`??? ? l-t,J?. ` Z +' .r
''?,, _ ?`? i f• /'[?! 1 f + t' 4 i . ??.^ r'r r + I 1 1 `lJ, , 0•( ?. \'1 •` ' 0^_:
?? ? . •r?r _ ti ti •. : `,,y 1 ? If t•' 1; i ; 'VF \• ?=?,r,.`•fJ.?l 1, I 1 ? . - ? ? I ??? ? It'd. '?'~
, r `9: '11:?t
c.t.__ `rA'. 4J? ?-? '• :?•<t??' •' / ,` ?+ 1 { Jr?i ,,._ti-?+?' -..r _;\\?? ':1 ?? S.1- '.? I I •_,,.,,?.? ? S `,, ??`ti-1 `{'S ? f ? ``
I' P. I
1 ^^_? •.+, •T' / ^ -.??. '1?\\ lr? '+ I I _ wr-•- I T? 1 1 •1 . ; . J ?~
41
?..??; ? ._.r -;-\.3• J-- • '•?;.,,,,.,•,....,,?ri•••a 'i:l: ' ?.f.:•,?.,..:-?-?":r'.S- 'S".y, 'ti't 1. ?` 3.,^,nl',?.
??? -'"\ .? .???.. f?-?; .ice ??'???ia"??•y'•?.?'?__?..d ?.•,`r'?'•?j??•`?\``C:l
•` \ Y? ? ?;? ? :jv%Li _ ...??? ?? 1 . ? { i r ?' ? l,? ..?'.;;'.;, :. ' ter.-,'`'"- 1'y • ?;-:?-.?,
_ i, ??'?'•;;' •'? ?^ _ O y'?'17???•!i7`•h r+ ? '& +;t?.? ?t ?'r•;k- ' y I ? ' t ?r+ ? ? ?. IS? `? ''' ' ? r ? ;;•. ti'„`-?? ; t r t
'\` ' ?'ti:: •,,_ ?!_- _ ?'•"if Lr,../R y. ?•? , ?• f 1 t !J ! rj ttr- ` '?Sr-'cr_.'! ?•+. j -
~ •? ' '`•,,*`•` i !'. f, `,` " 3 'r : S 1 J f? K i ..` Y - f fir` ?><.l -/! , ) ham, F;•r: >` * J___ ?j' i(
t ?' T !•1 :fir 'L?.J' ? ?"<'x? {l ?,/ { f '
??'..:'•"` " ti,.J ,r'tjtj•'ft? f *?. f t?opf? yl> -J,-, a}'? t?r?j/!/'; }lr '?q1' i' ??? f'`;lrrj 2l{ !'-I_
•r'',•r,- ° ; l `?~'Y',r ! r;• -•'
A 'J"
J.x.. r ..q?!r• 'C r _ . 1 R y,,-..? ?r ti. ' r [-
,' '? ' ,? • ` . C? el f'? .
` z -7 ? ?j-? '"'?.?-.r'rr. '?' • r .1., ??11 ?.•?...' ?? `-M' ,-?''rrr , off r 17 `'?• +? ?rl -. ? '. \ f-
1 rr - -? ?n• It --: - , Jt l 'I y" 9JI i r 1.
r . It L 1 I i/? 11'p rs yy??L f 4't z? 1 k9 fr '?/ r II'ti }IU S e , I?•, I? `•. '
• •1 ?j,', f- _??. -` .. .?.,, I11 I t fy ?•, r- i ,. fr• r •? ? r:: .><•. t?'? -.
• •! i ' \,?'. `• ? ,i' T'? ( ^?,,!?ii rr_.•" i? Wr?/L? Jr'?t+. f , /
1 1 ? ?- 1?` +°.I 1 '+'•. •?- 5,?w' li
% • e . ? tt /- .t ? ;?•y •, f ? ` __~_,1.`,•, ? ? r ? rte/ ? y ?cr•-_.': / `•, i'\?S• •t? r+??}'"/
---! ?:', C + fII r- ! l S -wr"'ti? •? 1.\ • -? Ir '.. ",?'??. -?.,''t ;;? T 1' '.•:????r?'?! ftS. ,- Y i
. \? `, t •l_. _ l\ ?1, .{?` _,?• .+ ` ?µ"'tr, " f -? ' • •`' •k
••\ 1-\ i ,••.r y I+,? . ?:y •"0 M"". qW,
' !~ "t ( _?_ r tG a St; •;'rl `.`l r . ?,? ? i ', sl.t-'"6`r`:,.??.??,'•-:?" ? 111"?VC,1?L?.?? ?--W' 1 . rr (' ' ?• , .?" 5 _ .
'0 1 1 1 _
••,, j 1? ?- i ? , j ? ?tir•.?.".',.,?t ;11 ? 1 ? I i • "?:• ? t?"],, : • Y" `, S
;?'!?, ? 'fir .•••-?.•.?° r<L:' ?? ??i+\ -1 ' Ili I f ? t??. 'i''";,? `w? ? 1 14 y ? by'? a' f ._,..,? ,.
?,l rI / ?' f {,3,' :' 1; {/y',r1' rr. '?': .',?dt•, t I ;' < ?? z// _. I?
i.: r,i `?, ?, l •` ? aT/ ? ? ?^'^' t } s 45?i:?? ! .?n,,.Jhj = ..? T????- ? t t,,; ?`?` ?,. -1 f,'' ? (?I?JrI f? ---•- "-?f ?-
'l'' ?V ` ~,'I? ?;'j` lI7I[f} rrr?% Jr ^M`?, ":7(??^',;NM' 'iG ?? 7 \.?-?-_. _ f .} ? I' ? ?•y .'f?',-,.
''l? _ _ ` 1 ? r 1 f I}?(t1 ? 1 t rf'% /?' 4 •?t 1. v • - ?'1C5' 1+ }J o ? ?' l '1 + ??r : a• ,,' /" -? 1
w y'? Y 4 _
` ti ,• . ?J i >?o •? y. ''... ? rf I If. ` f ,,. '?,\ 'L L _ :?r-S lam. ' ?. (; _`'.w •.ti L' ,....?,
f' I%•?` -r f/. ?yt? I 'i +•, tt t' I t V?r ?y 1 I' '?•;'?Ya1 \}•yl tl C_.•: - ",? ?r? J f:... ?"`'f
I Of ` F? r r . ,{ ?, ., ] •'''S I''/Sff3I l i.
• r ` a a a, r ? ?' r i t "- I .SG'>^++S.t I £ r i. • -,'-ti ? t ? "-_'?'-• •-
__ j?}° ?i. r / f ?"`, (r,? ?yj •, ? ?,1 ?'!'? J ? r r * . -??k,`?'? '' ? ? _w-
S,, '`rY I ? ?,rz ?_ _ ' 11' 1 {,? f •i '???1 t A?Cl•.j, ! ?'r14 r'_ j?,.f} t'' ,r ? •',? ? 1``'`` r'
1 x, i \ (?s' I. f ?L 1 } I t'>S 1 f `,tt JJr`? S i 1?+ t S %
tv • . ? _t ?` r _ 1S + + •i, ? , I IJr 4 •,1 ? i +? # ? ' •r ,,? •? _ j f? ? . + ? ?' ? •',, t r?,t''•.` ..- •I ?
.a ? , ?? ? , _ ?, ? 1? ? i , i r ? 1 I ?%'+' ? T •?, ?' 1' ??;? } ? I I I `\ ° .r''? '• '\ :? '- ? ? •i
SCALE 1:24000 Facility
Latitude:
35"42'49" Sub-Basin: 03-07-06
Location X_?
Lor>ck 80°22'30"
"-
G k1 #: E17NE
Stream chss: WS
V
Receivir? Stre u1i_ -
Yadkin River ^ J
/ Duke Power
Pemuttal Flow:
- No Flow Limit O
J v r 1
F
NCA004774
Buck Steam St:dion
d?
n
0
O
O
U
z
0
z
iJ
a
w
O)
C)
O
z
Q
;Fl
O
z
W
w
rz.
W
d
i
c
3
?v o
o ?
N
O
w C)
c?
U y
N
b
0
?a
N N
Lr
Q
a ?
EL
X?
.c
CIO?
b
c ?
cz u
L
U
04
4-+
O
-o 0
y O
?U
U u
w 4,
N O
?U
o ?
0
?z
C
E
.n ?
0
o
n. av
? U
bU °
C ?
Q o
W W
M o
a
F?
W
?
w
?
L
y rL
R 0
N
a ? O
O
? U
E
o
0.0
H
? A
w
c7
Q > °
x ?
U a O
A w
c
M
coo
U
COD
a
w
E
V
Q
N.a
V
=
w v 3
c3 c3
? N ll
[ ,, O v y
W CJ.. F- F-w 3
o
? Q
z
O Q O
u
0
x
°
O <
Z
`n
O
Q F"
O W. O
az 0 3
W W ?--- w Q
w a_ w H
Qz Q
a
x O ° ° w
U
° w A C/)
z w 3
0
Q
< 00 c.
uo w?'3
Q a
zQ P_ O
?o' O
o
C/ Wz
Q
)
H°" Hz?
W ?
z? ',7 (D
H
¢uw 0
00
c?
wz
F..0 x3_q
OO ¢ ?
0
¢F•
3¢ ww0 w
0 E-
zQ )
0
? 3 V) Z
0
O W z
O
¢ H
Q
a
Q
Q N z
Q
H? ?z
z ¢?? Q
3
0
?
0
T
O d o
U >
?
Z
z 00
o C0:4
z O
a aD
LJ
°
z
V)z
F4 :::)
00 W
U 1=- ? H z
C
N
4-
W
I
W
x
I
0
v
0
Cl.
c3
kr)
kr)
M U
0
U 00
k
N O
o ?
•? M
0
W-)
ct3 N N
N
? C
«S
L
ftS L
L
cz Q
2:1
a3 Q
L
? x
C
o 03
o ->'
b
?L
M
o?
c
=$ o
C
(L)
L L
o
a?
c? Y T
L .? o
N
o o
U
a? N
SEE
y O N
E 3 Y
aJ -o ?
a? .
Q) °' 3
to U
Y,
o ?
C4 C
N
C L
C-.3
f`1
n
n
0
0
0
C)
0
Z
a?
a
Lt.w
z
O
zQ
d
Cl)
O
z
w
w
W
N
0
C"
0
0
w
O
oho
cd
o -d
N_
L
o
C ?
N a..+
aYU-1 ,
a
a? 0
a?
? T
o°
cz
0
b
.? C
?b
bA +--N
-b
C -?
?03
L N
? bA
N c3
W ?
0-0
? U
T3 C
ai
a ?
wz
(%
o Q
b
O
?0
c
b 4?
a?
br, ,
no
0
? a W W W W W W W W W W W
o
a
cf)
H
z °
4
w ;?
a
w
a .ay
? N L
C7 L
C7 L
C7 L
C7 L
C7 L
C7 L
C7 L
C7 L
C7 L
C7
? o
C7 N
a
a
v 2? 2,
cr
L C
0 cl
a C
0 cz
a
a
a
a s
a c
o
: c
o c
o
w
8
E E E E
E O O O O
hl
? A
a
w
C
U E E E E
? .. O O O O
.
O
U
0-4
w +
?
? O
-n z
+
'
V) o
O > J
U a, 7v E ' cv o
W C7 U
c v °' ?- = O
J 0 c? U 2
¢
?n
? O 0 0 0 0
G t% O E E E E
a? c
3 3
¢
Q U
3 T
C
?
'b
a. ?
00
Y
z
H ? L
O
ax L
° 4
0
? n. 3 O
0 ca
y
O L
w C
Q ¢
C7
al
O
a x U
L N y
w o
3 cn L
P4
W ? cz
.n
¢x 0 ? o
?0
o
C (?
L
b
cn c4
L-
C?l
x3
C7 U Q. U p
Q ? 7
C b O
L U
a;
¢ O E 0
Q > `+-
W - °' o c
N
C
E
.C
c
E U
z (Yi E ...
?D
W al
o C?
w 3
? bn
E
b°' t?
o
a .o
W
w i ?
-
C
a
c
W U ? c
bn
W p
E M
¢ W
?
-gyp N d
O
Q W 0 O
a) N
U
z ?
¢ H o_
V
U ? >, O
r
W a
r
° _o
?
f
o
sz w _L o
C
'O
cl
b
C
O
O\
C
L
bA
O
C
.E
L
b
0
c
L
a,
0
C
x
n.
y
F-
--t
d'
n
t`
?r
0
0
0
z
0
Z
.E
V
a
s~
w
W
CD
t?
O
Z
Q
z
0
F-'
W
cL.
w
w
c
w
0
0
U
b
0 3
b o
N ?
0 b
?
0 U
03
a
N
N `n
a? U
?..y L
a ?
Q) a
o
o. ?
X o
0
b
to
.r
C'J
b
c
c
V)
0
c:s
?b
W C/)
? g
0
O?
c j
0
a?
71
0
u
c
w w w w w
o
a
?
H
W
H
at cl C 0
?
?
?
V r
V hh
V r
??
V
„ W
z
O
?
0
? N
r- U U U
v 0
?
+ b
0 b
0 b
0 0
0
W W W W
(D
O
H ?
F
fy
A
a
w
a
?
U
r^ _
r
V1
A
c
r~
W
? cn
U ?
z ? °
w o
O U
wx
w O
Q u.
OW U
V) 0
cn
00
td ?
O
zw
COO O
a?
O;D
3v)
F" x
x3
zu
?w
z_
> U
? U
O
¢
za
?QCw7
ua?
U Q
Oc_nw
O' O H
L14 ¢
L1 C/) W
O D w
xo?
?C/)¢
w0
Q
x w ?
w
0a
0z?
Q
O H
LLI
rxOO
LLI
?wz
0
3 ? ¢
?3x
o,?x
Q U ?
w
0O
J)
03
a?
O
oo
U
b
4.
0
03
a
0
a
as
b
b
0
U
w
c
EL
C4
C
w
w
W
I
w
c
0
U
0
a?
a
E
0
C)_
03
b
L
O
C~
w.
C
Q'
L
0
?°
rl
Permit No. N00004774
SUPPLEMENT TO EFFLUENT LIMITATIONS
AND MONITORING REQUIREMENTS
SPECIAL CONDITIONS
A (4). DEFINITIONS
The term "low volume waste sources" means, taken collectively as if from one source, wastewater from all sources
except those for which specific limitations are otherwise established in this part. Low volume wastes sources
include, but are not limited to: Wastewater from wet scrubber air pollution control systems, ion exchange water
treatment system, water treatment evaporator blowdown, laboratory and sampling streams, boiler blowdown, floor
drains, and recirculating house service water,systems. Sanitary and air conditioning wastes are not considered low
volume wastes.
The term "metal cleaning waste" means any wastewater resulting from cleaning (with or without chemical cleaning
compounds) any metal process equipment including, but not limited to, boiler tube cleaning, boiler fireside cleaning,
and air preheater cleaning.
The term, "chemical metal cleaning waste" means any wastewater resulting from the cleaning of any metal process
equipment with chemical compounds, including, but not limited to, boiler tube cleaning. Chemical metal cleaning
will be conducted according to approved Duke Power equivalency demonstration.
A (5). TOXICITY REOPENER CONDITION
This permit shall be modified, or revoked and reissued to incorporate toxicity limitations and monitoring
requirements in the event toxicity testing or other studies conducted on the effluent or receiving stream indicate that
detrimental effects may be expected in the receiving stream as a result of this discharge.
A (6). MONITORING FREQUENCIES
If the Permittee, after monitoring for at least six months, determines that he is consistently meeting the effluent limits
contained herein, the permittee may request of the Director that the monitoring requirements be reduced to a lesser
frequency.
A (7). POLYCHLORINATED BIPHENYL COMPOUNDS %
There shall be no discharge of polychlorinated biphenyl compounds such as those commonly used for transformer
fluid.
A (8). BIOCIDE CONDITION
The permittee shall not use any biocides except those approved in conjunction with the permit application. The
permittee shall notify the Director in writing not later than ninety (90) days prior to instituting use of any additional
biocide used in cooling systems which may be toxic to aquatic life other than those previously reported to the
Division of Water Quality. Such notification shall include completion of Biocide Worksheet Form 101 and a map
locating the discharge point and receiving stream. Completion of Biocide Worksheet Form 101 is not necessary for
the introduction of a new biocide into an outfall currently being tested for toxicity
A (9). INTAKE SCREEN BACKWASH
Continued intake screen backwash discharge is permitted without limitations or monitoring requirements.
Permit No. N00004774
SUPPLEMENT TO EFFLUENT LIMITATIONS
AND MONITORING REQUIREMENTS
SPECIAL CONDITIONS (Continued)
A (10). BEST MANAGEMENT PRACTICES
It has been determined from information submitted that the plans and procedures in place at Buck Steam Station are
equivalent to that of a Best Management Practice (BMP). -
A (11). CHRONIC TOXICITY PASS/FAIL PERMIT LIMIT (QUARTERLY)
The effluent discharge shall at no time'ex'hibit observable inhibition of reproduction or significant mortality to
Ceriodaphnia dubia at an effluent concentration of 0.7%.
The permit holder shall perform at a minimum, quarterly monitoring using test procedures outlined in the "North
Carolina Ceriodaphnia Chronic Effluent Bioassay Procedure," Revised February 1998, or subsequent versions or
"North Carolina Phase II Chronic Whole Effluent Toxicity Test Procedure" (Revised-February 1998) or subsequent
versions. The tests will be performed during the months of March, June, September, and December. Effluent
sampling for this testing shall be performed at the NPDES permitted final effluent discharge below all treatment
processes.
If the test procedure performed as the first test of any'single quarter results in a failure or ChV below the permit
limit, then multiple-concentration testing shall be performed at a minimum, in each of the two following months as
described in "North Carolina Phase If Chronic Whole Effluent Toxicity Test Procedure" (Revised-February 1998) or
subsequent versions.
The chronic value for multiple concentration tests will be determined using the geometric mean of the highest
concentration having no detectable impairment of reproduction or survival and the lowest concentration that does
have a detectable impairment of reproduction or survival. The definition of "detectable impairment," collection
methods, exposure regimes, and further statistical methods are specified in the "North Carolina Phase 11 Chronic
Whole Effluent Toxicity Test Procedure" (Revised-February 1998) or subsequent versions.
All toxicity testing results required as part of this permit condition will be entered on the Effluent Discharge
Monitoring Form (MR-1) for the months in which tests were performed,'using the Iftarameter code TGP3B for the
pass/fail results and THP313 for the Chronic Value. Additionally, DWQ Form AT-3 (original) is to be sent to the
following address:
Attention: Environmental Sciences Branch
North Carolina Division of
Water Quality
1621 Mail Service Center
Raleigh, North Carolina 27699-1621
Completed Aquatic Toxicity Test Forms shall be filed with the Environmental Sciences Branch no later than 30 days
after the end of the reporting period for which the report is made.
Test data shall be complete, accurate, include all supporting chemical/physical measurements and all
concentration/response data, and be certified by laboratory supervisor and ORC or approved desionate signature.
Total residual chlorine of the effluent toxicity sample must be measured and reported if chlorine is employed for_
disinfection of the waste stream.
Permit No. N00004774
SUPPLEMENT TO EFFLUENT LIMITATIONS
AND MONITORING REQUIREMENTS
SPECIAL CONDITIONS (Continued)
A (11). CONTINUED...
Should there be no discharge of flow from the facility during a month in which toxicity monitoring is required, the
permittee will complete the information located at the top of the aquatic toxicity (AT) test form-indicating the facility
name, permit number, pipe number, county, and the month/year of the report with the notation of "No Flow" in the
comment area of the form. The report shall be submitted to the Environmental Sciences Branch at the address cited
above.
Should the permittee fail to monitor during a month in which toxicity monitoring is required, monitoring will be
required during the following month.
Should any test data from this monitoring requirement or tests performed by the North Carolina Division of Water
Quality indicate potential impacts to the receiving stream, this permit may be re-opened and modified to include
alternate monitoring requirements or limits.
NOTE: Failure to achieve test conditions as specified in the cited document, such as minimum control organism
survival, minimum control organism reproduction, and appropriate environmental controls, shall constitute an invalid
test and will require immediate follow-up testing to be completed no later than the last day of the month following
the month of the initial monitoring.
A (12). Ash Pond
Beginning on the effective date of this permit and lasting until expiration, there shall be no discharge of plant wastes
to the ash pond unless the permittee provides and maintains at all times a minimum free water volume equivalent to
the sum of the maximum 24-hour plant discharges plus all direct rainfall and all runoff flows to the pond resulting
from a 10-year, 24-hour rainfall event, when using a runoff coefficient of 1.0.
During the term of the permit, the permittee shall remove settled material from the ponds or otherwise enlarge the
available storage capacities in order to maintain the required minimum,vokumes at alldimes. Annually the permittee
shall determine and report to the permit issuing authority: (1) the actual free water volume of the ash pond, (2)
physical measurements of the dimensions of the free water volume in sufficient detail to allow validation of the
calculated volume, and (3) a certification that the required volume is available with adequate safety factor to include
all solids expected to be deposited in the ponds for the following year. Any changes to plant operations affecting
such certification shall be reported to the Director within five days.
NOTE: In the event that adequate volume has been certified to exist for the term of the permit, periodic certification
is not needed.
A (13). CHEMICAL METAL CLEANING WASTES
It has been demonstrated that under certain conditions it is possible to reduce the concentration of metals in boiler
cleaning wastes in the range of 92 to 99+ percent by treatment in ash ponds. Because of dilution problems, and the
existence of' boundary interface layers at the extremities of the plume, it is difficult to prove beyond doubt that the
quantity of iron and copper discharged will always be less than one milligram per liter times the flow of metal
cleaning when treated in this manner.
Permit No. NC0004774
SUPPLEMENT TO EFFLUENT LIMITATIONS
AND MONITORING REQUIREMENTS
SPECIAL CONDITIONS (Continued)
A (13). CONTINUED...
The application of physical/chemical methods of treating wastes has also been demonstrated to be effective in the
treatment of metal cleaning wastes. However, the effectiveness of ash pond treatment should be considered in
relation to the small differences in effluent quality realized between the two methods.
It has been demonstrated that the presence of ions of copper, iron, nickel, and zinc in the ash pond waters was not
measurably increased during the ash pond' equivalency demonstration at the Duke Power Company's Riverbend
Steam Station. Therefore, when the following conditions are implemented during metal cleaning procedures,
effective treatment for metals can be obtained at this facility:
(1) Large ash basin providing potential reaction volumes.
(2) Well-defined shallow ash delta near the ash basin influent.
(3) Ash pond pH of no less than 6.5 prior to metal cleaning waste addition.
(4) Four days retention time in ash pond with effluent virtually stopped.
(5) Boiler volume less than 86,000 gallons.
(6) Chemicals for cleaning to include only one or more of the following:
(a) Copper removal step- sodium bromate, NaBr03; ammonium carbonate, (NH4)2C03; and ammonium
hydroxide, NH40H.
(b) Iron removal step-hydrochloric acid, HCl; and ammonium bifluoride, (NH4)BF2 and proprietary
inhibitors.
(7) Maximum dilution of wastes before entering ash pond 6 to 1.
(8) After treatment of metal cleaning wastes, if monitoring of basin effluents as required by the permit reveals
discharges outside the limits of the permit. permittee will re-close the basin discharge, conduct such in-basin
sampling as necessary to determine the cause of nonconformance, will take appropriate corrective actions, and
will file a report with EPA including all pertinent data.
A (14). FLOATING MATERIALS
The Permittee shall report all visible discharges of floating materials, such as an oil sheen, to the Director when
submitting DMRs.
A (15). DIKE INSPECTIONS
The permittee shall check the diked areas for leaks by a visible inspection and shall report any leakage detected.
A (16). CHEMICAL DISCHARGES
Discharge of any product registered under the Federal Insecticide, Fungicide, and Rodenticide Act to any waste
stream which may ultimately be released to lakes, rivers, streams or other waters of the United States is prohibited
unless specifically authorized elsewhere in this permit. Discharge of chlorine from the use of chlorine gas, sodium
hypochlorite, or other similar chlorination compounds for disinfection in plant potable and service water systems and
in sewage treatment is authorized. Use of restricted use pesticides for lake management purposes by applicators
licensed by the N.C. Pesticide Board is allowed.
Permit No. NC0004774
SUPPLEMENT TO EFFLUENT LIMITATIONS
AND MONITORING REQUIREMENTS
SPECIAL CONDITIONS (Continued)
A (17). WAIVERS
Nothing contained in this permit shall be construed as a waiver by permittee or any right to a hearing it may have
pursuant to State or Federal laws or regulations. _
it
NPDES Permit Requirements
Page 1 of 16
PART II
STANDARD CONDITIONS FOR NPDES PERMITS
Section A. Definitions
2 /Month
Samples are collected twice per month with at least ten calendar days between sampling events.
3 /Week
Samples are collected three times per week on three separate calendar days. -
Act or "the Act"
The Federal Water Pollution Control Act, alsp known as the Clean Water Act, as amended, 33 USC 1251, et. seq.
Annual Average
The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar year. In the case of fecal
coliform, the geometric mean of such discharges.
Arithmetic Mean
The summation of the individual values divided by the number of individual values.
li ass
The known diversion of waste streams from any portion,of a treatment facility including the collection system, which
is not a designed or established or operating mode for the facility.
Calendar Day
The period from midnight of one day until midnight of the next day. However, for purposes of this permit, any
consecutive 24-Hour period that reasonably represents the calendar day may be used for sampling.
Calendar Quarter
One of the following distinct periods: January through March, April through June, July through September, and
October through December.
Composite Sample
A sample collected over a 24-hour period by continuous sampling or combining grab samples of at least 100 ml in
such a manner as to result in a total sample representative of the wastewater discharge during the sample period. The
Director may designate the most appropriate method (specific number and size of aliquots necessary, the time
interval between grab samples, etc.) on a case-by-case basis. Samples may be collected manually or automatically.
Composite samples may be obtained by the following methods:
(1) Contitnuous: a single, continuous sample collected over a 24-hour period proportional to the rate of flow.
(2) Constant time/variable volume: a series of grab samples collected at equal time intervals over a 24 hour
period of discharge and combined proportional to the rate of flow measured at the time of individual sample
collection, or
(3) Variable time/constant volume: a series of grab samples of equal volume collected over a 24 hour period
with the time intervals between samples determined by a preset number of gallons passing the sampling
point. Flow measurement between sample intervals shall be determined by use of a flow recorder and
totalizer, and the preset gallon interval between sample collection fixed at no greater than 1/24 of the
expected total daily flow at the treatment system, or
(4) Constant tune/constant volume: a series of grab samples of equal volume collected over a 24-hour period at
a constant time interval. This method may only be used in situations where effluent flow rates vary
less than 15 percent. The grab samples shall be taken at intervals of no greater than 20 minutes apart
during any 24-hour period and must be of equal size and of no less than 100 milliliters. Use of this method
requires prior approval by the Director.
Version 612012003
NPDES Permit Requirements
Page 2 of 16
In accordance with (4) above, influent grab samples shall not be collected more than once per hour.
Effluent grab samples shall not be collected more than once per hour except at wastewater treatment systems
having a detention time of greater than 24 hours. In such cases, effluent grab samples may be collected at
intervals evenly spaced over the 24-hour period that are equal in number of hours to the detention time of the
system in number of days. However, the interval between effluent grab samples may not exceed six hours nor
the number of samples less than four during a 24-hour sampling period.
Continuous flow measurement
Flow monitoring that occurs without interruption throughout the operating hours of the facility. Flow shall be
monitored continually except for the infrequent times when there may be no flow or for infrequent maintenance
activities on the flow device.
Daily Discharge
The discharge of a pollutant measured duru}g,a calendar day or any 24-hour period that reasonably represents the
calendar day for purposes of sampling. For pollutants measured in units of mass, the "daily discharge" is calculated as
the total mass of the pollutant discharged over the day. The "daily discharge" concentration comprises the mean
concentration for a 24-hour sampling period as either a-composite sample concentration or the arithmetic mean of all
grab samples collected during that period. (40 CFR 1223)
Daily Maximum
The highest "daily discharge" during the calendar month.
Daily Sampling
Parameters requiring daily sampling shall be sampled 5 out of every 7 days per week unless otherwise specified in the
permit. The Division expects that sampling shall be conducted on weekdays except where holidays or other
disruptions of normal operations prevent weekday sampling. If sampling is required for all seven days of the week
for any permit parameter(s), that requirement will be so noted on the Effluent Limitations and Monitoring Page(s).
DM or "the Division"
The Division of Water Quality, Department of Environment and Natural Resources.
EMC
The North Carolina Environmental Management Commission.
Facility Closure
The cessation of wastewater treatment at a permitted facility, or the cessation of all activities that require coverage
under the NPDES. Completion of facility closure will allow this permit to be rescinded.
Geometric Mean
The Nth root of the product of the individual values where N = the number of individual values. For purposes of
calculating the geometric mean, values of "0" (or "< [detection level]") shall be considered = 1.
Grab Sample
Individual samples of at least 100 ml collected over a period of time not exceeding 15 minutes. Grab samples can be
collected manually. Grab samples must be representative of the discharge (or the receiving stream, for instream
samples).
Hazardous Substance
Any substance designated under.40 CFR Part 116 pursuant to Section 311 of the Clean Water Act.
Instantaneous flow measurement
A measure of flow taken at the time of sampling, when both the sample and flow will be representative of the total
discharge.
Version 612012003
NPDES Permit Requirements
Page 3 of 16
Monthly Average (concentration limit)
The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar month. In the case of fecal
coliform, the geometric mean of such discharges.
Permit Issuing Authori
ty
The Director of the Division of Water Quality.
Quarterly Average (concentration li nio
The average of all samples taken over a calendar quarter.
Severe property damage - -
Substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable,
or substantial and permanent loss of natural resources.which can reasonably be expected to occur in the absence of a
bypass. Severe property damage excludes economic loss caused by delays in production.
Toxic Pollutant:
Any pollutant listed as toxic under Section 307(a)(1) of the Clean Water Act.
U set
An incident beyond the reasonable control of the Permittee causing unintentional and temporary noncompliance with
permit effluent limitations and/or monitoring requirements. An upset does not include noncompliance caused by
operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive
maintenance, or careless or improper operation.
Weekly Average (concentration li nit)
The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar week. In the case of fecal
coliform, the geometric mean of such discharges.
Section B. General Conditions
Duty to Comply
The Pernittee must comply with all conditions of this permit. Any permit noncompliance constitutes a violation
of the Clean Water Act and is grounds for enforcement action; for permit termination, revocation and reissuance,
or modification; or denial of a permit renewal application [40 CFR 122.41]. 0
a. The. Permittee shall comply with effluent standards or prohibitions established under section 307(a) of-the
Clean Water Act for toxic pollutants and with standards for sewage sludge use or disposal established under
section 405(d) of the Clean Water Act within the time provided in the regulations that establish these
standards or prohibitions or standards for sewage sludge use or disposal, even if the permit has not yet been
modified to incorporate the requirement.
b. The Clean Water Act provides that any person who violates section 301, 302, 306, 307, 308, 318 or 405 of the
Act, or any permit condition or limitation implementing any such sections ui a permit issued under section
402, or any requirement imposed un a pretreatment program approved under sections 402(a)(3) or 402(b)(8)
of the Act, is subject to a civil penalty not to exceed $25,000 per day for each violation. [40 CFR 122.41 (a)
(2)]
The Clean Water Act provides that any person who negligenljl, violates sections 301, 302, 306, 307, 308, 318, or
405 of the Act, or any condition or liinitation implementing an), of such sections in -a permit issued under
section 402 of the Act, or any requirement imposed in a pretreatment program approved under section
402(a)(3) or 402(b)(8) of the Act, is subject to criminal penalties of $2,500 to $25,000 per day of violation, or
imprisonment of not more than 1 1,ear, or both. In the case of a second or subsequent conviction for a
negligent violation, a person shall be subject to criminal penalties of not more than $50,000 per day of
violation, or by imprisonment of not more than 2 years, or both. [40 CFR 122.41 (a) (2)]
Version 612012003
NPDES Permit Requirements
Page 4 of 16
d. Any person who kno2vingl
), violates such sections, or such conditions or limitations is subject to criminal
penalties of $5,000 to $50,000 per day of violation, or imprisonment for not more than 3 years, or both. In
the case of a second or subsequent conviction for a knowing violation, a person shall be subject to criminal
penalties of not more than $100,000 per day of violation, or imprisonment of not more than 6 years, or both.
[40 CFR 122.41 (a) (2)]
e. Any person who knowingly violates section 301, 302, 303, 306, 307, 308, 318 or 405 of the Act, or any permit
condition or limitation implementing any of such sections itn a permit issued under section 402 of the Act,
and who knows at that time that he thereby places another person in imminent danger of death or serious
bodily injury, shall, upon conviction, be subject to a fine of not more than $250,000 or imprisonment of not
more than 15 years, or both. In the case of-a second or subsequent conviction for 2 knowing endangerment
violation, a person shall be subject to a fine of not more than $500,000 or by imprisonment of not more than
30 years, or both. An organization, as defined in section 309(c)(3)(B)(iii) of the CWA, shall, upon conviction
of violating the imminent danger prgvision, be subject to a fine of not more than $1,000,000 and can be fined
up to $2,000,000 for second or subsequent convictions. [40 CFR 122.41 (a) (2)]
f. Under state law, a civil penalty of not more than $25,000 per violation may be assessed against any person
who violates or fails to act in accordance with the terms, conditions, or requirements of a permit. [North
Carolina General Statutes § 143-215.6A]
g. Any person may be assessed an administrative penalty by the Administrator for violating section 301, 302,
306, 307, 308= 318 or 405 of this Act, or any permit condition or limitation implementing any of such
sections in a permit issued under section 402 of this Act. Administrative penalties for Class I violations are
not to exceed $10,000 per violation, with the maximum amount of any Class I penalty assessed not to exceed
$25,000. Penalties for Class II violations are not to exceed $10,000 per day for each day during which the
violation continues, with the maximum amount of any Class 11 penalty not to exceed $125,000. [40 CFR
122.41 (a) (3)]
2. Duty to Mitigate
The Permittee shall take all reasonable steps to minimize or prevent any discharge or sludge use or disposal in
violation of this permit which has a reasonable likelihood of adversely affecting human health or the environment
[40 CFR 122.41 (d)].
3. Civil and Criminal Liability
Except as provided in permit conditions on "Bypassing" (Part Il. 4 4), "Upsets",kpart,II. C. 5) and "Power
Failures" (Part II. C. 7), nothing in this permit shall be construed to relieve the Permittee from any
responsibilities, liabilities, or penalties for noncompliance pursuant to NCGS 143-215.3, 143-215.6 or Section 309
of the Federal Act, 33 USC 1319. Furthermore, the Permittee is responsible for consequential damages, such as
fish kills, even though the responsibility for effective compliance may be temporarily suspended.
4. Oil and Hazardous Substance Liability
Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the Permittee
from any responsibilities, liabilities, or penalties to which the Permittee is or may be subject to under NCGS 143-
215.75 et seq. or Section 311 of the Federal Act, 33 USG 1321. Furthermore, the Permittee is responsible for
consequential damages, such as fish kills, even though the responsibility for effective compliance may be
temporarily suspended.
5. Propert Rights
The issuance of this permit does not convey any property rights in either real or personal property, or any
exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor
any infringement of Federal, State or local laws or regulations [40 CFR 122.41 (g)].
6. Onshore or Offshore Constriction
This permit does not authorize or approve the construction of any onshore or offshore physical structures or
facilities or the undertaking of an), work in any navigable waters.
Version 612012003
NPDES Permit Requirements
Page 5 of 16
7. Severabilitc
The provisions of this permit are severable. If any provision of this permit, or the application of any provision of thi
permit to any circumstances, is held invalid, the application of such provision to other circumstances, and the remainde
of this permit, shall not be affected thereby [NCGS 150B-23].
8. Duty to Provide Information
The Permittee shall furnish to the Permit Issuing Authority, within a reasonable time, any information which the
Permit Issuing Authority may request to determine whether cause exists for modifying, revoking and reissuing, or
terminating this permit or to determine compliance with this permit. The Permittee shall also furnish to the
Permit Issuing Authority upon request, copies of records required by this permit [40 CFR 122.41 (h)].
9. Duty, to Reapply
If the Permittee wishes to continue an activity regulated by this permit after the expiration date of this permit, the
Permittee must apply for and obtain a pew.permit [40 CFR 122.41 (b)].
10. Expiration of Permit
The Permittee is not authorized to discharge after the expiration date. In order to receive automatic
authorization to discharge beyond the expiration Gate, the Pernittee shall submit such information, forms, and
fees as are required by the agency authorized to issue permits no later than 180 days prior to the expiration date.
Anv Permittee that has not requested renewal at least 180 days prior to expiration, or any Permittee that does not
have a permit after the expiration and has not requested renewal at least 180 days prior to expiration, will subject
the Permittee to enforcement procedures as provided in NCGS 143-215.6 and 33 USC 1251 et. seq.
11. Signatory Requirements
All applications, reports, or information submitted to the Permit Issuing Authority shall be signed and certified
[40 CFR 122.41 (k)].
All permit applications shall be signed as follows:
(1) For a corporation: by a responsible corporate officer. For the purpose of this Section, a responsible
corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in
charge of a principal business function, or any other person who performs similar policy or decision
making functions for the corporation, or (b) the manager of one or more manufacturing, production, or
operating facilities, provided, the manager is authorized to make management decisions which govern the
operation of the regulated facility including having the explicit or implicit duty of making major capital
investment recommendations, and initiating and directing` other comprehensive measures to assure long
term environmental compliance with environmental laws and regulations; the manager can ensure that
the necessary systems are established or actions taken to gather complete and accurate information for
permit application requirements; and where authority to sign documents has been assigned or delegated
to the manager in accordance with corporate procedures .
(2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
(3) For a municipality, State, Federal, or other public agency: by either a principal executive officer or
ranking elected official [40 CFR 122.22].
b. All reports required by the permit and other information requested by the Permit Issuing Authority shall be
signed by a person described in paragraph a. above or by a duly authorized representative of that person. A
person is a duly authorized representative only if-
1 . The authorization is made in writing by a person described above;
2. The authorization specified either an individual or a position having responsibility for the overall
operation of the regulated facility or activity,. such as the position of plant manager, operator of a well or
well field, superintendent, a position of equivalent responsibility, or an individual or position having
overall responsibility for environmental matters for the company. (A duly authorized representative may
thus be either a named uidividual or any individual occupying a named position.); and
3. The written authorization is submitted to the Permit Issuing Authority [40 CFR 122.221
Version 612012003
NPDES Permit Requirements
Page 6of16
c. Changes to authorization: If an authorization under paragraph (b) of this section is no longer accurate
because a different individual or position has responsibility for the overall operation of the facility, a nea
authorization satisfying the requirements of paragraph (b) of this section must be submitted to the Director
prior to or together with any reports, information, or applications to be signed by an authorized
representative [40 CFR 122.22]
d. Certification. Any person signing a document under paragraphs a. or b. of this section shall make the
following certification [40 CFR 122.22]:
"1 certify, under penalty of law, that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate
the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations."
12. Permit Actions
This permit may be modified, revoked and reissued, or terminated for cause. The filing of a request by the
Permittee for a permit modification, revocation and reissuance, or termination, or a notification of planned
changes or anticipated noncompliance does not stay any permit condition [40 CFR 122.41 (f)].
13. Permit Modification Revocation and Reissuance or Termination
The issuance of this permit does not prohibit the permit issuing authority from reopening and modifying the
permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations
contained in Tide 40, Code of Federal Regulations, Parts 122 and 123; Title 15A of the North Carolina
Administrative Code, Subchapter 2H .0100; and North Carolina General Statute 143-215.1 et. al.
14. Annual Administering and Compliance Monitoring Fee Requirements
The Perrruttee must pay the annual administering and compliance monitoring fee within thirty days after being
billed by the Division. Failure to pay the fee.in a timely manner in accordance with 15A NCAC 2H.0105 (b) (4)
may cause this Division to initiate action to revoke the permit.
Section C. Ongration and Maintenance of Pollution Controls
Certified Operator "
Upon classification of the permitted facility by the Certification Commission, the Permittee shall employ a
certified water pollution control treatment system operator in responsible charge (ORC) of the water pollution
control treatment system. Such operator must hold a certification of the grade equivalent to or greater than the
classification assigned to the water pollution control treatment system by the Certification Commission. The
Permittee must also employ one or more certified Back-up ORCs who possess a currently valid certificate of the
type of the system. Back-up ORCs must possess a grade equal to (or no more than one grade less than) the grade
of the system [15A NCAC 8G.02011.
The ORC of each Class I facility must:
? Visit the facility at least weekly
? Comply with all other conditions of 15A NCAC 8G.0204.
The ORC of each Class II, III and IV facility must:
? Visit the facility at least daily, excluding weekends and holidavs
? Properly manage and document daily operation and maintenance of the facility
Comply with all other conditions of 15A NCAC 8G.0204.
Once the facility is classified, the Permittee shall sul)nut a letter to the Certification Comnission designating the
operator in responsible charge:
a. Within 60 calendar daps prior to wastewater being introduced into a new system
Version 612012003
NPDES Permit Requirements
Page 7 of 16
b. Within 120 calendar days of:
? Receiving notification of a change in the classification of the system requiring the designation of a
new ORC and back-up ORC
? A vacancy in the position of ORC or back-up ORC.
2: Proper Operation and Maintenance
The Permittee shall at all times provide the operation and maintenance resources necessary to operate the existing
facilities at optimum efficiency. The Permittee shall at all times properly operate and maintain all facilities and
systems of treatment and control (and related appurtenances) which are installed or used by the Permittee to
achieve compliance with the conditions of this permit. Proper operation and maintenance also includes adequate
laboratory controls and appropriate quality assurance procedures. This provision requires the Permittee to install
and operate backup or auxiliary facilities only when necessary to achieve compliance with the conditions of the
permit [40 CFR 122.41 (e)].
Need to Halt or Reduce not a Defense, ,
It shall not be a defense for a Permittee in an enforcement action that it would have been necessary to halt or
reduce the permitted activity in order to maintain compliance with the condition of this permit [40 CFR 122.41
(c)]
4. Bypassing of Treatment Facilities
a. Bypass not exceeding limitations [40 CFR 122.41 (m) (2)]
The Permittee may allow any bypass to occur which does not cause effluent limitations to be exceeded, but
only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the
provisions of Paragraphs b. and c. of this section.
b. Notice [40 CFR 122.41 (m) (3)]
(1) Anticipated bypass. If the Permittee knows ui advance of the need for a bypass, it shall submit prior
notice, if possible at least ten days before the date of the bypass; including an evaluation of the
anticipated quality and effect of the bypass.
(2) Unanticipated bypass. The Permittee shall submit notice of an unanticipated bypass as required in Part
II. E. 6. (24-hour notice).
c. Prohibition of Bypass
(1) Bypass from the treatment facility is prohibited and the Permit Issuing Authority may take enforcement
action against a Permittee for bypass, unless:
(A) Bypass was unavoidable to prevent loss of life, personal injury or severe property damage;
(B) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities,
retention of untreated wastes or maintenance during normal periods of equipment downtime. This
condition is not satisfied if adequate backup equipment should have been installed in the exercise of
reasonable engineering judgment to prevent a bypass which occurred during normal periods of
equipment downtime or preventive maintenance; and
(C) The Permittee submitted notices as required under Paragraph b. of this section.
(2) Bypass from the collection system is prohibited and the Permit Issuing Authority may take enforcement
action against a Permittee for a bypass as provided in any current or future system-wide collection system
permit associated with the treatment facility.
(3) The Permit Issuing Authority may approve an anticipated bypass, after considering its adverse effects, if
the Permit Issuing Authority determines that it will meet the three conditions listed above in Paragraph c.
p) of this section.
Upsets
a. Effect of an upset [40 CFR 122.41 (n) (2)1: An upset constitutes an affirmative defense to an action
brought for noncompliance with such technology based permit effluent lunitations if the requirements of
paragraph 1). of this condition are met. No determination made during administrative review of claims that
Version 612012003
NPDES Permit Requirements
Page 8 of 16
noncompliance was caused by upset, and before an action for noncompliance, is final administrative action
subject to judicial review.
b. Conditions necessary for a demonstration of upset: A Permittee who wishes to establish the
affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs, or
other relevant evidence that:
(1) An upset occurred and that the Permittee can identify the cause(s) of the upset;
(2) The Pem' ittee facility was at the time being properly operated; and
(3) The Permittee submitted notice of the upset as required in Part II. E. 6. (b) (B) of this permit.
(4) The Permittee complied with any remedial measures required under Part II. B. 2. of this permit.
d. Burden of proof [40 CFR 122.41 (n) (4)1: - The Permittee seeking to establish the occurrence of an
upset has the burden of proof in any enforcement proceeding.
6. Removed Substances , , .
Solids, sludges, filter backwash, or other pollutants removed in the course of treatment or control of wastewaters
shall be utilized/disposed of in accordance with NCGS 143-215.1 and in a manner such as to prevent any pollutant
from such materials from entering waters of the State or navigable waters of the United States. The Permittee
shall comply with all existing Federal regulations governing the disposal of sewage sludge. Upon promulgation of
40 CFR Part 503, any permit issued by the Permit Issuing Authority for the utilization/disposal of sludge may be
reopened and modified, or revoked and reissued, to incorporate applicable requirements at 40 CFR 503. The
Permittee shall comply with applicable 40 CFR 503 Standards for the Use and Disposal of Sewage Sludge (when
promulgated) within the time provided in the regulation, even if the permit is not modified to incorporate the
requirement. The Permittee shall notify the Permit Issuing Authority of any significant change in its sludge use
or disposal practices.
7. Power Failures
The Permittee is responsible for maintaining adequate safeguards (as required by 15A NCAC 211.0124 -
Reliability) to prevent the discharge of untreated or inadequately treated wastes during electrical power failures
either by means of alternate power sources, standby generators or retention of inadequately treated effluent.
Section D. Monitoring and Records
Representative Sampling
Samples collected and measurements taken, as required herein, shall bg characteristic pf the volume and nature of
the permitted discharge. Samples collected at a frequency less than daily shall be taken on a day and time that is
characteristic of the discharge over the entire period the sample represents. All samples shall be taken at the
monitoring points specified in this permit and, unless otherwise specified, before the effluent joins or is diluted
by any other wastestream, body of water, or substance. Monitoring points shall not be changed without
notification to and the approval of the Permit Issuing Authority [40 CFR 122.41 (j)].
2. Reporting
Monitoring results obtained during the previous month(s) shall be summarized for each month and reported on a
monthly Discharge Monnitorung Report (DMR) Form (MR 1, 1.1, 2, 3) or alternative forms approved by the
Director, postmarked no later than the 28th day following the completed reporting period.
The first DMR is due on the last day of the month following the issuance of the permit or inn the case of a new
facility, on the last day of the month following the commencement of discharge. Duplicate signed copies of
these, and all other reports required herein, shall be submitted to the following address:
NC DENR / Division of Water Quality / Water Quality Section
ATTENTION: Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Version 612012003
NPDES Permit Requirements
Page 9 of 16
3. Flow Measurements
Appropriate flow measurement devices and methods consistent with accepted scientific practices shall be selected
and used to ensure the accuracy and reliability of measurements of the volume of monitored discharges. The
devices shall be installed, calibrated and maintained to ensure that the accuracy of the measurements is consistent
with the accepted capability of that type of device. Devices selected shall be capable of measuring flows with a
maximum deviation of less than 10% from the true discharge rates throughout the range of expected discharge
volumes. Flow measurement devices shall be accurately calibrated at a minimum of once per year and maintained
to ensure that the accuracy of the measurements is consistent with the accepted capability of that type of device.
The Director shall approve the flow measurement device and monitoring location prior to installation.
Once-through condenser cooling water flow monitored by pump logs, or pump hour meters as specified in Part I
of this permit and based on the manufacturer's pump curves shall not be subject to this requirement.
4. Test Procedures , -
Test procedures for the analysis of pollutants shall conform to the EMC regulations (published pursuant to
NCGS 143-215.63 et. seq.), the Water and Air Quality Reporting Acts, and to regulations published pursuant *to
Section 304(8), 33 USC 1314, of the Federal Water Pollution Control Act (as Amended), and 40 CFR 136; or in
the case of sludge use or disposal, approved under 40 CFR 136, unless otherwise specified in 40 CFR 503, unless
other test procedures have been specified in this permit [40 CFR 122.411.
To meet the intent of the monitoring required by this permit, all test procedures must produce minimum
detection and reporting levels that are below the permit discharge requirements and all data generated must be
reported down to the minimum detection or lower reporting level of the procedure. If no approved methods are
determined capable of achieving minimum detection and reporting levels below permit discharge requirements,
then the most sensitive (method with the lowest possible detection and reporting level) approved method must
be used.
Penalties for Tampering
The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any
monitoring device or method required to be maintained under this permit shall, upon conviction, be punished by
a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or
by both. If a conviction of a person is for a violation committed after a first conviction of such person under this
paragraph, punishment is a fine of not more than $20,000 per day of violation, or by imprisonment of not more
than 4 years, or both [40 CFR 122.41].
6. Records Retention
Except for records of monitoring information required by this permit related to the Permittee's sewage sludge
use and disposal activities, which shall be retained for a period of at least five years (or longer as required by 40
CFR 503), the Permittee shall retain records of all monitoring information, including:
? all calibration and maintenance records
? all original strip chart recordings for continuous monitoring instrumentation
? copies of all reports required by this permit
? copies of all data used to complete the application for this permit
These records or copies shall be maintained for a period of at least 3 years from the date of the sample,
measurement, report or application. This period may be extended by request of the Director at any time [40 CFR
122.41].
7. Recording Results
For each measurement or sample taken pursuant to the requirements of this pennit, the Pennittee shall record
the following information [40 CFR 122.41]:
a. The date, exact place, and time of sampling or measurements;
b. The individual(s) who performed the sampling or measurements;
c. The date(s) analyses were performed;
d. The undividual(s) who performed the analyses;
Version 612012003
e. The analytical techniques or methods used; and
f. The results of such analyses.
NPDES Permit Requirements
Page 10 of 16
8. Inspection and EntU
The Permittee shall allow the Director, or an authorized representative (including an authorized contractor acting
as a representative of the Director), upon the presentation of credentials and other documents as may be required
by law, to;
a. Enter upon the Permittee's premises where a regulated facility or activity is located or conducted, or where
records must be kept under the conditions of this permit;
b. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this
permit; _
c. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices,
or operations regulated or required under this permit; and
d. Sample or monitor at reasonable, times, for the purposes of assuring permit compliance or as otherwise
authorized by the Clean Water Act, any substances or parameters at any location [40 CFR 122.41 (i)].
Section E Reporting Requirements
Change in Discharge
All discharges authorized herein shall be consistent with the terms and conditions of this permit. The discharge
of any pollutant identified in this permit more frequently than or at a level in excess of that authorized shall
constitute a violation of the permit.
2. Planned Changes
The Permittee shall give notice to the Director as soon as possible of any planned physical alterations or
additions to the permitted facility [40 CFR 122.41 (1)]. Notice is required only when:
a. The alteration or addition to a permitted facility may meet one of the criteria for new sources at 40 CFR
122.29 (b); or
b. The alteration or addition could significantly change the nature or increase the quantity of pollutants
discharged. This notification applies to pollutants subject neither to effluent limitations in the permit, nor to
notification requirements under 40 CFR 122.42 (a) 0).
c. The alteration or addition results in a significant change in the Perxnittee's sludge use or disposal practices,
and such alternation, addition or change may justify the application of permit conditions that are different
from or absent in the existing permit, including notification of a4ditional use ors disposal sites not reported
during the permit application process or not reported pursuant to an approved land application plan.
3. Anticipated Noncompliance
The Permittee shall give advance notice to the Director of any planned changes to the permitted facility or other
activities that might result in noncompliance with the permit [40 CFR 122.410) (2)].
4. Transfers
This permit is not transferable to any person except after notice to the Director. The Director may require
modification or revocation and reissuance of the permit to document the change of ownership. Any such action
may incorporate other requirements as may be necessary under the Clean Water Act [40 CFR 122.41 (1) (3)].
5. Monitoring Reports
Monitoring results shall be reported at the intervals specified elsewhere in this permit [40 CFR 122.410) (4)].
Monitoring results must be reported on a Discharge Monitoring Report (DMR) (See Part Il. D. 2) or forms
provided by the Director for reporting results of monitoring of sludge use or disposal practices.
If the Permittee monitors any pollutant more frequently than required by this permit, the results of such
monitoring shall be included in the calculation and reporting of the data submitted on the DMMR.
Version 612012003
NPDES Permit Requirements
Page 11 of 16
6. Twenty-four Hour Reporting
a. The Permittee shall report to the Director or the appropriate Regional Office any noncompliance that
potentially threatens public health or the environment. Any information shall be provided orally within 24
hours from the time the Permittee became aware of the circumstances. A written submission shall also be
provided within 5 days of the time the Permittee becomes aware of the circumstances. The written
submission shall contain a description of the noncompliance, and its cause; the period of noncompliance,
including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is
expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the
noncompliance [40 CFR 122.410) (6)].
b. The Director may waive the written report-on a case-by-case basis for reports under this section if the oral
report has been received within 24 hours.
c. Occurrences outside normal busipess. hours may also be reported to the Division's Emergency Response
personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300.
7. Other Noncompliance
The Permittee shall report all instances of noncompliance not reported under Part II. E. 5 and 6. of this permit at
the time monitoring reports are submitted. The reports shall contain the information listed in Part II. E. 6. of
this permit [40 CFR 122.41 (1) (7)].
8. Other Information
Where the Permittee becomes aware that it failed to submit any relevant facts in a permit application, or
submitted incorrect information in a permit application or in any report to the Director, it shall promptly submit
such facts or information [40 CFR 122.410) (8)].
9. Noncompliance Notification
The Permittee shall report by telephone to either the central office or the appropriate regional office of the
Division as soon as possible, but in no case more than 24 hours or on the next working day following the
occurrence or first knowledge of the occurrence of any of the following:
a. Any occurrence at the water pollution control facility which results in the discharge of significant amounts of
wastes which are abnormal in quantity or characteristic, such as the dumping. of the contents of a sludge
digester; the known passage of a slug of hazardous substance through the facility; or any other unusual
circumstances.
b. Any process unit failure, due to known or unknown reasons, that render the facility incapable of adequate
wastewater treatment such as mechanical or electrical failures of pumps, aerators, compressors, etc.
c. Any failure of a pumping station, sewer line, or treatment facility resulting in a by-pass directly to receiving
waters without treatment of all or any portion of the influent to such station or facility.
Persons reporting such occurrences by telephone shall also file a written report within 5 days following first
knowledge of the occurrence.
10. Availability of Reports
Except for data determined to be confidential under NCGS 143-215.3 (a)(2) or Section 308 of the Federal Act, 33
USC 1318, all reports prepared in accordance with the terms shall be available for public inspection at the offices
of the Division of Water Quality. As required by the Act, effluent data shall not be considered confidential.
Knowingly making any false statement on any such report may result ui the imposition of criminal penalties as
provided for in NCGS 143-215.1(b)(2) or in Section 309 of the Federal Act.
11. Penalties for Falsification of Reports
The Clean Water Act provides that any person who knowingly makes any false statement, representation, or
certification in any record or other document submitted or required to be maintained under this periuit, including
monitoring reports or reports of compliance or noncompliance shall, upon conviction, be punished by a fine of
Version 612012003
NPDES Permit Requirements
Page 12 of 16
not more than $25,000 per violation, or by imprisonment for not more than two years per violation, or by both
[40 CFR 122.41].
12. Annual Performance Reports
Permittees who own or operate facilities that collect or treat municipal or domestic waste shall provide an annual
report to the Permit Issuing Authority and to the users/customers served by the Permittee (NCGS 143-215.1C).
The report shall summarize the performance of the collection or treatment system, as well as the extent to which
the facility was compliant with applicable Federal or State laws, regulations and rules pertaining to water quality.
The report shall be provided no later than sixty days after the end of the calendar or fiscal year, depending upon
which annual period is used for evaluation.
PART III
OTHER REQUIREMENTS
Section A. Construction
The Permittee shall not commence construction of wastewater treatment facilities, nor add to the plant's treatment
capacity, not change the treatment process(es) utilized at the treatment plant unless the Division has issued an
Authorization to Construct (AtC) permit. Issuance of an AtC will not occur until Final Plans and Specifications for
the proposed construction have been submitted by the Permittee and approved by the Division.
Section B. Groundwater Monitoring
The Permittee shall, upon written notice from the Director of the Division of Water Quality, conduct groundwater
monitoring as may be required to determine the compliance of this NPDES permitted facility with the current
groundwater standards.
Section C. Changes in Discharges of Toxic Substances
The Permittee shall notify the Permit Issuing Authority as soon as it knows or has reason to believe (40 CFR 122.42):
a. That any activity has occurred or will occur which would result in the discharge, on a routine or frequent
basis, of any toxic pollutant which is not limited in the permit, if that discharge will exceed the highest of the
following "notification levels";
(1) One hundred micrograms per liter 000 µg/L);
(2) Two hundred micrograms per liter (200 µg/L) for acrolein end acryloTtrile; five hundred micrograms
per liter (500 µg/L) for 2.4-dinitrophenol and for 2-methyl-4.16-dinitrophenol; and -one milligram per liter
(1 mg/L) for antimony;
(3) Five times the maximum concentration value reported for that pollutant in the permit application.
b. That any activity has occurred or will occur which would result in any discharge, on a non-routine or
infrequent basis, of a toxic pollutant which is not limited in the permit, if that discharge will exceed the
highest of the following "notification levels";
0) Five hundred micrograms per liter (500 R/L);
(2) One milligram per liter 0 mg/L) for antimony;
(3) Ten times the maximum concentration value reported for that pollutant in the permit application.
Section D. Evaluation of Wastewater Discharge Alternatives
The Permittee shall evaluate all wastewater disposal alternatives and pursue the most environmentally sound
alternative of the reasonably cost effective alternatives. If the facility is iu substantial non-compliance with the terms
and conditions of the NPDES permit or governing rules, reg ulations or laws, the Perinittee shall submit a report ui
such form and detail as required by the Division evaluating these alternatives and a plan of action within 60 days of
notification by the Division.
Section E. Facility Closure Requirements
The Permittee must notify the Division at least 90 days prior to the closure of any wastewater treatment systenn
covered by this permit. The Division may require specific nneasures during deactivation of the system to prevent
Version 612012003
NPDES Permit Requirements
Page 13 of 16
adverse impacts to waters of the State. This permit cannot be rescinded while any activities requiring this permit
continue at the permitted facility.
PART IV
SPECIAL CONDITIONS FOR MUNCIPAL FACILITIES
Section A. Publicly Owned Treatment Works (POTWs)
All POTWs must provide adequate notice to the Director of the following:
1. Any new introduction of pollutants into the POTW from an indirect discharger which would be subject to
section 301 or 306 of CWA if it were directly discharging those pollutants; and
2. Any substantial change in the volume or character of pollutants being introduced by an indirect discharger
as influent to that POTW at the rime of issuance of the permit.
3. For purposes of this paragraph, adequate notice shall include information on (1) the quality and quantity of
effluent introduced into the POTW, and (2) any anticipated impact of the change on the quantity or quality
of effluent to be discharged from the POTW.
Section B. Municipal Control of Pollutants from Industrial Users.
Effluent limitations are listed in Part I of this permit. Other pollutants attributable to inputs from
industries using the municipal system may be present in the Permittee's discharge. At such time as
sufficient information becomes available to establish limitations for such pollutants, this permit may be
revised to specify effluent limitations for any or all of such other pollutants in accordance with best
practicable technology or water quality standards.
2. Under no circumstances shall the Permittee allow introduction of the following wastes in the waste
treatment system:
a. Pollutants which create a fire or explosion hazard in the POTW, including, but not limited to,
wastestreams with a closed cup flashpoint of less than 140 degrees Fahrenheit or 60 degrees
Centigrade using the test methods specified in 40 CFR 261.21;
b. Pollutants which will cause corrosive structural damage to the POTW, but in no case Discharges
with pH lower than 5.0, unless the works is specifically designed to accommodate such Discharges;
C. Solid or viscous pollutants in amounts which will cause obstruction to the flow in the POTW
resulting in Interference;
d. Any pollutant, including oxygen demanding pollutants (BOD, etc.) released in a Discharge at a flow
rate and/or pollutant concentration which will cause Interference with the POTW;
e. Heat in amounts which will inhibit biological activity in the POTW resulting in Interference, but in
no case heat in such quantities that the temperature at the POTW Treatment Plant exceeds 40°C
(104°F) unless the Division, upon request of the POTW, approves alternate temperature limits;
f. Petroleum oil, nonbiodegradable cutting oil, or products of mineral oil origin in amounts that will
cause interference or pass through;
g. Pollutants which result in the presence of toxic gases, vapors, or fumes within the POTW in a
quantity that may cause acute worker health and safety problems;
h. Any trucked or hauled pollutants, except at discharge points designated by the POTW.
With regard to the effluent requirements listed in Part I of this permit, it may be necessary for the
Permittee to supplement the requirements of the Federal Pretreatment Standards (40 CFR, Part 403) to
ensure compliance by the Permittee with all applicable effluent limitations. Such actions by the Permittee
may be necessary regarding some or all of the industries discharging to the municipal system.
The Pernttee shall require any industrial discharges sending influent to the permitted system to meet
Federal Pretreatment Standards promulgated in response to Section 307(b) of the Act.. Prior to accepting
wastewater from any significant industrial user, the Permittee shall either develop and submit to the
Version 612012003
NPDES Permit Requirements
Page 14 of 16
Division a Pretreatment Program for approval per 15A NCAC 2H .0907(a) or modify an existing
Pretreatment Program per 15A NCAC 2H.0907(b).
5. This permit shall be modified, or alternatively, revoked and reissued, to incorporate or modify an approved
POTW Pretreatment Program or to include a compliance schedule for the development of a POTW
Pretreatment Program as required under Section 402(b)(8) of the Clean Water Act and implementing
regulations or by the requirements of the approved State pretreatment program, as appropriate.
Section C. Pretreatment Programs
Under authority of sections 307(b) and (c) and 402(b)(8) of the Clean Water Act and implementing regulations 40
CFR Part 403, North Carolina General Statute 143-215.3 (14) and implementing regulations 15A NCAC 2H
.0900, and in accordance with the approved pretreatment program, all provisions and regulations contained and
referenced in the Pretreatment Program Submittal are an enforceable part of this permit.
The Permittee shall operate its approved pretreatment program in accordance with Section 402(b)(8) of the Clean
Water Act, the Federal Pretreatment Regulations 40 CFR Part 403, the State Pretreatment Regulations 15A
NCAC 2H .0900, and the legal authorities, policies, procedures, and financial provisions contained in its
pretreatment program submission and Division approved modifications there of. Such operation shall include
but is not limited to the implementation of the following conditions and requirements:
1. Sewer Use Ordinance (SUO)
The Permittee shall maintain adequate legal authority to implement its approved pretreatment program.
2. Industrial Waste Survee_(I?XlSI
The Permittee shall update its Industrial Waste Survey (IWS) to include all users of the sewer collection
system at least once every five years.
Monitoring Plan
The Permittee shall implement a Division approved Monitoring Plan for the collection of facility specific
data to be used in a wastewater treatment plant Headworks Analysis (HWA) for the development of
specific pretreatment local limits. Effluent data from the Plan shall be reported on the DMRs (as required
by Part II, Section D, and Section E.S.).
4. Headworks Analysis (HWA) and Local Limits
The Permittee shall obtain Division approval of a Headwork4? Analysis WA) at least once every five
years, and as required by the Division. Within 180 days of the effective date of, this permit (or any
subsequent permit modification) the Permittee shall submit to the Division a written technical evaluation
of the need to revise local limits (i.e., an updated HWA or documentation of why one is not needed) [40
CFR 122.42]. The Permittee shall develop, in accordance with 40 CFR 403.5(c) and 15A NCAC 2H .0909,
specific Local Limits to implement the prohibitions listed in 40 CFR 403.5(a) and (b) and 15A NCAC 2H
.0909.
Industrial User Pretreatment Permits (!UP) & Allocation Tables
In accordance with NCGS 143-215.1, the Permittee shall issue to all significant industrial users, permits for
operation of pretreatment equipment and discharge to the Permittee's treatment works. These permits
shall contain limitations, sampling protocols, reporting requirements, appropriate standard and special
conditions, and compliance schedules as necessary for the installation of treatment and control
technologies to assure that their wastewater discharge will meet all applicable pretreatment standards and
requirements. The Permittee shall maintain a_ current Allocation Table (AT) which summarizes the results
of the Headworks Analysis (HWA) and the limits from all Industrial User Pretreatment Permits (IUP).
Permitted ]UP loadings for each parameter cannot exceed the treatment capacity of the POTW as
determined by the HWA.
Version 612012003
r ,
NPDES Permmt Ihrduuctlr?nt.
Pagel 5 c'f I
6. Authorization to Construct (A to C) ,
The Permittee. shall ensure, that' an 'Authorization to Construct permit (AtC) is issued to all applicable
industrial users for the construction or modification of any pretreatment facility.' Prior to the issuance of
an AtC, the proposed pretreatment facility and treatment process must be evaluated for its capacity to
comply with all Industrial User Pretreatment Permit (IUP) limitations.
7. POTW Inspection & Monitoring of their SIUs `
The Permittee shall conduct inspection, surveillance, and monitoring activities as described in its Division
approved pretreatment program in order to determine, independent of information supplied by industrial
users, compliance with applicable pretreatment standards.. The Permittee must:
a. Inspect all Significant Industrial Users (SIUs) at least once per calendar year; and
b. Sample all Significant Industrial Users (SIUs) at least twice per calendar year for all permit-
limited pollutants, once during the period from January 1 through June 30 and once during the
period from July 1 through December 31, except for organic compounds which shall be sampled
once per calendar year;
8. SIU Self Monitoring and Reporting
The Permittee shall require all industrial users to comply with the applicable monitoring and reporting
requirements outlined in the Division approved pretreatment program, the industry's pretreatment permit,
or in 15A NCAC 2H.0908.
9. Enforcement Response Plan (ERP
The Permittee shall enforce and obtain appropriate remedies for violations of all pretreatment standards
promulgated pursuant to section 307(b) and (c) of the Clean Water Act (40 CFR 405 et. seq.), prohibitive
discharge standards as set forth in 40 CFR 403.5 and 15A NCAC 2H .0909, and specific local limitations.
All enforcement actions shall be consistent with the Enforcement Response Plan (ERP) approved by the
Division.
10. Pretreatment Annual Reports (P=
The Permittee shall report to the Division in accordance with 15A NCAC 2H .0908. In lieu of submitting
annual reports, Modified Pretreatment Programs developed under 15A NCAC 2H .0904 (b), may be
required to meet with Division personnel periodically to discuss enforcement of pretreatment requirements
and other pretreatment implementation issues.
For all other active pretreatment programs, the Permittee shall submit two coolies of'a,Pretreatment Annual
Report (PAR) describing its pretreatment activities over the previous twelve months to the Division at the
following address:
NC DENR / DWQ / Pretreatment Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
These reports shall be submitted according to a schedule established by the Director and shall contain the
following.
a.) Narrative
A brief discussion of reasons for, status of, and actions taken for all Significant Industrial
Users (SIUs) in Significant Non-Compliance (SNC);
b.) Pretreatment Program Summary (PPS".
A pretreatment program summary (PPS) on specific forms approved by the Division;
c.) Significant Non-Compliance Report (SNCR)
The nature of the violations and the actions taken or proposed to correct the violations on
specific forms approved by the Division;
d.) Industrial Data Summary Forms DSF)
Version 612012003
?? .i I?1'llI Pcrnlit Requirements
?Pa,cof l
Monitoring data from samples collected by both the POT and the Sign1 1 uit In liistri
ter.
User (SILT). These analytical results must be.reported on Industrial Data'sunui ar ?P n11, °.':> ?`
(IDSF) or other specific. format approved by the Division;
e.), Other Information {
Copies of the POTW's allocation table, new or modified enforcement compliance schedules
public notice of SIUs in SNC; and 'any other information, upon request, which in the
opinion of the Director is needed to determine compliance with the pretreatment
implementation requirements of this permit;
11. Public Notice
The Permittee shall publish annually a list of Significant Industrial Users (SIUs) that were 'in Significant
Non-Compliance (SNC) as defined in the Permittee's Division approved Sewer Use Ordinance with
applicable pretreatment requirements and standards during the previous twelve month period. This list
shall be published within four months of the applicable twelve-month period.
12. Record Keeping
The Permittee shall retain for a minimum of three years records of monitoring activities and results,' along
with support information including general fecords, water quality records, and records of industrial impact
on the POTW.
13. Funding and Financial Report
The Permittee shall maintain adequate funding and staffing levels to accomplish the objectives of its
approved pretreatment program.
14. Modification to Pretreatment Programs
Modifications to the approved pretreatment program including but not limited to local limits
modifications, POTW monitoring of their Significant Industrial Users (SIUs), and Monitoring Plan
modifications, shall be considered a permit modification and shall be governed by 15 NCAC 2H .0114 and
15A NCAC 2H.0907.
i ,k
Version 612012003