Loading...
HomeMy WebLinkAbout20080706 Ver 1_CAMA Permit Application_20080416i -0 7 t~ 6 ~~~~ ~~ - NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary April 14, 2008 MEMORANDUM TO: Cyndi Karoly Environmental Biological Supervisor Division of Water Quality D~ ~ ~ 1~~~~ ~,~ ~Y ;. FROM: Doug Huggett ;a P R ~ ~ ;? ~ f~ Major Permits Processing Coordinator Ut=fdh ~~i~likk a ~l'? V1's= ~ ~1+vt)S ANC ; r'1F2p~ ~+lA fir" Hi~~N ;F'. SUBJECT: CAMA Permit Application Review Applicant: CHOWAN COUNTY Project Location: RED BANKS FARM OFF W QUEEN ST-EDENTON-CHOWAN CO. Proposed Project: BOARDWALK, WALKWAYS, CANOE/KAYAK PLATFORM Please indicate below your agency's position or viewpoint on the proposed project and return this form by OS/05/08 to 400 Commerce Avenue, Morehead City, NC 28557. If you have any questions regarding the proposed project, please contact Kelly Russell at (252) 264-3901, ext. 222. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper c DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Chowan County 2. LOCATION OF PROJECT SITE: Red Banks Farm adjacent to 1200 W Queen St., US 17 Business, Edenton, Chowan County and on the Pembroke Creek Photo Index - 2006: 151-678 2000: 151-1836 1995: 151-1575 1989: 19-7 1984: 109-861 State Plane Coordinates - X: 2695185.12 Y: 849504.16 Edenhouse, NC Quad 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit -1/15/2008 Was Applicant Present -yes 5. PROCESSING PROCEDURE: Application Received Complete - 03/31/2008 Office -Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan -yes Land Classification From LUP -conservation, transitional (B) AEC(s) Involved: Public Trust Area, Public Trust Shoreline (C) Water Dependent: yes (D) Intended Use: public (E) Wastewater Treatment: Existing -none Planned -none (F) Type of Structures: Existing -none Planned -boardwalk and platform (G) Estimated Annual Rate of Erosion: n/a Source - n/a 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED SHADED (A) Vegetated Wetlands 1920 sq. ft. shaded (B) PTA 7980 sq. ft. shaded (D) Total Area Disturbed: 7980 sq. ft. open water and 1920 sq. ft. public trust Shoreline (0.044 acres) (E) Primary Nursery Area: no (F) Water Classification: SB Open: no 8. PROJECT SUMMARY: The applicant proposes to construct a 1300' x 6' wooden boardwalk over public trust waters along the shoreline of Pembroke Creek, three wooden boardwalks over wetlands to access the main boardwalk each 6' wide, and a 6' x 30' platform for canoe launching. Field Investigation Report Page 2 Project Setting The site of the proposed development is a 95 acre tract of land located off of W. Queen St. (SR 1204) in Edenton, Chowan County. The property is currently an undeveloped piece of farmland adjacent to Pembroke Creek and is known as Red Banks Farm. Adjacent properties include an undeveloped tract and the US Fish and Wildlife Service Fish Hatchery. Elevation of the tract is approximately 4 ft above NWL. Vegetation on this site consists of mixed hardwoods including gum, oak, maple, and cypress trees. The shoreline along Pembroke Creek is vegetated with mostly hardwoods in the upland area and bald cypress, red maple, and sweet gum in the 404 wetland area. The entire 95 acre tract consists of 15% forested wetlands, 5% upland forest, and 80% farmland. The soils in the area are classified as Chowan-Dorovan silty loams. The county-owned tract of land consists of 3660 ft of natural shoreline along the Pembroke Creek. No submerged aquatic vegetation was observed in the area of the proposed development. The water depths in the Pembroke Creek in the area of the proposed development range from 1 ft to 3 ft. The waters of the Pembroke Creek are closed to shellfish harvesting and are classified as SB waters by the Division of Environmental Management. There are no known archeological sites of geologic formations associated with the applicant's property. Development Proposal In order to provide public access the applicant proposes to construct a 1300' x 6' wooden boardwalk along the shoreline of Pembroke Creek, a 6' x 30' platform, and 3 wooden boardwalks for pedestrian access to the main boardwalk. The main wooden boardwalk will be constructed along the shoreline and will be accessed by three 6' wide boardwalks through the upland areas. The access boardwalks will be 200' x 6', 80' x 6', and 40' x 6'. In the middle section of the main boardwalk the county proposes to construct a 6' x 30' canoe/kayak launching platform. Anticipated Impacts The proposed development will shade 1920 sq. ft. of wetlands and upland forest areas in the Public Trust Shoreline AEC and 7980 sq. ft. of Public Trust Area of Environmental Concern. Temporary water turbidity will occur during the construction. Submitted by: Kelly Russell Date: April 14, 2008 MAJOR PERMIT FEE MATRIX Applicant• Chowan County; Red Banks Farm Park Selection Development Type Fee DCM % (14300 1601 435100093 1625 6253) DW4 (24300 1602 435100095 2341) I. Private, non-commercial development that does not $250 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or o en water areas: II. Public or commercial development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or o en water areas: III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below a lies: III(A). Private, non- commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 3490 (See attached can be a lied: III(B). Public or commercial development, if General $400 100% ($400) 0% ($0) Water Quality Certification No. 3490 (See attached) can be a lied: III(C). If General Water Quality Certification No. $400 60% ($240) 40% ($160) 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or a uatic life: III(D). If General Water ~ Quality Certification No. $400 60% ($240) 40% ($160) 3490 (see attached) cannot be a lied: IV. For development that involves the filling and/or $475 60% ($285) 40% ($190) excavation of more than one acre of wetlands and/or o en water areas: Chowan County Red Banks Farm Park Boardwalk and Canoe/Kayak Platform CAMA Major Permit Application Narrative February 8th, 2008; Revised February 22, 2008; Revised 3/31/2008 Chowan County has a CAMA Waterfront Access Grant to construct a 1,300 ft by 6 ft boardwalk along Pembroke Creek at the new Red Banks Farm Park in Edenton. A 6 ft by 30 ft platform for launching canoes and kayaks will be constructed along the middle section of the boardwalk. The east and west sections of the boardwalk will be constructed through small sections of wetland forest. To minimize impact to the wetland forests, the boardwalk will meander around trees from the river's edge to the river bank. The county plans to construct a crush and run gravel walking trail azound the pazk, which will connect with the boardwalk at both ends. The general public will be able to use the boardwalk for exercising, birdwatching, and fishing on Pembroke Creek. The canoe/kayak launch will provide easy access for water-based recreation. Chowan County Parks and Recreation will maintain the boardwalk and supervise public access. The pilings for the boazdwalk will be round, 14 ft minimum length, and driven to a minimum length of 8 ft. All pilings will be treated to 2.5 salt water treatment. All lumber material will be pressure treated to 0.4 CCA minimum. The grade shall comply with State Code. All nails, screws, bolts, washers, nuts and etc. shall be galvanized. A kickrail will be used rather than handrail on the boardwalk. A small tracked pile driver and barge with pile driver will be used to construct the boardwalk. The equipment will be stored on the Red Banks Farm property during construction. Proposed Activities 1) Construct 1,300' x 6' boardwalk over water along the shoreline (See Site Plan and Cross Sections). 2) Construct 6' x 30' canoe/kayak launch along middle section of the boardwalk (See Site Plan and Cross Sections). 3) Area of Disturbance is 7,980 sq. ft. (See Site Plan) 8CM MP-1 APPLICATION for ~ ~~~~~~ Mayor Development Permit ~_~~~~~~~~~~~~~~,~~: ,:. (las! revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 7. Primary Applicant/ Landowner -nformation Business Name Chowan County Project Name (if applicable) Red Banks Farm Park Boardwalk and Canoe/Kayak Access Applicant 1: First Name Robbie MI Last Name Laughton Applicant 2: First Name MI Last Name !f additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box 1030 City Edenton State NC ZIP 27932 Country Phone No. 252 - 482 - 8595 ext. FAX No. 252 - 482 - 3223 Street Address (if different from above) City State ZIP Email robbie.laughtont~ncmail.net 2. Agent/Contracfor Information Business Name AgenU Contractor 1: First Name MI Last Name AgenU Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No. 1 - - ext. Phone No. 2 - - ext. FAX No. Contractor # Street Address (if different from above) City State ZIP Email X1.31 ~~t,o,_ _.,, _ ~, j ~. -°~ _.. - ~.. <Form continues on back> n., ~ r}~ :'~r ~~; ~. ty .. ;ll~ ,9 L a~tl.d'~d± r Form DCM MP-1 (Page 2 of 5) APPLICATION for ~-` ~~ U ~ 6 Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Chowan 176 Subdivision Name City State Zip Red Banks Farm Edenton NC 27932 - Phone No. Lot No.(s) (~f many, attach additional page with fist) 252 - 482 - 8595 ext. a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Chowan Pembroke Creek c. Is the water body identified in (b) above, natural or manmade? d. Name the Gosest major water body to the proposed project site. ®Natural ^Manmade ^Unknown Albemarle Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ^No work falls within. Edenton 4, Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 3,660 4,138,200 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (norrnal water level) (If many lot sizes, please attach additional page with a list) 4 ft ^NHW or ®NWL e. Vegetation on tract Fallow cropland, patches of upland mixed hardwood forests, forested wetlands and bottomland hardwood forests consisting of bald Cyprus and gums. f. Man-made features and uses now on tract An old shed. Area was actively farmed until 2007. g. Identify and describe the existing land uses adiacent to the proposed project site. Private cropland on the west and south sides of the tract and Edenton National Fish Hatchery on the southeast side of the tract. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? RA-Residential/Agricultural (Attach zoning compliance certificate, if applicable) ®Yes ^No ^NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ^Yes ®No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ^Yes ®No ^NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ^Yes ®No ^NA National Register listed or eligible property? <Form continues on next page> Form DCM MP-1 (Page 3 of 5) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes ^No (ii) Are there coastal wetlands on the site? ^Yes ®No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes ^No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. None o. Describe existing drinking water supply source. None p. Describe existing storm water management or treatment systems. None 5 Activities. and Jmpacfs a. Will the project be for commercial, public, or private use? ^Commercial ®PubliGGovernment ^Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Chowan County has a CAMA Waterfront Access Grant to construct a 1,300 ft by 6 ft boardwalk along Pembroke Creek at the new Red Banks Farm Park in Edenton. A 6 ft by 30 ft platform for launching canoes and kayaks will be constructed along the middle section of the boardwalk. The east and west sections of the boardwalk will be constructed through small sections of wetland forest. To minimize impact to the wetland forests, the boardwalk will meander around trees from the river's edge to the river bank. The county plans to construct a walking trail around the park, which will connect with the boardwalk in the middle and at both ends. The general public will be able to use the boardwalk for exercising, birdwatching, and fishing on Pembroke Creek. The canoelkayak launch will provide easy access for water-based recreation. Chowan County Parks and Recreation will maintain the boardwalk and supervise public access. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The pilings for the boardwalk will be round, 14 ft minimum length, and driven to a minimum length of 8 ft. All pilings will be treated to 2.5 salt water treatment. All lumber material will be pressure treated to 0.4 CCA minimum. The grade shall comply with State Code. All nails, screws, bolts, washers, nuts and etc. shall be galvanized. A kickrail will be used rather than handrail on the boardwalk. A small tracked pile driver and/or barge with pile driver will be used to construct the boardwalk. The equipment will be stored on the Red Banks Farm property during construction. d. List all development activities you propose. 1) Construction of 1,300' x 6' boardwalk along shoreline and over water 2) Construction of 6' x 30' canoe/kayak launch along middle section of the boardwalk and over water e. Are the proposed activities maintenance of an existing project, new work, or both? New work f. What is the approximate total disturbed land area resulting from the proposed project? 0 7 980 ®Sq.Ft or ^Acres ~.i~' g. Will the proposed project encroach on any public easement, public accessway or other area ^Yes ®No ^NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. NA Form DCM MP-1 (Page 4 of 5) APPLICATION for Major Development Permit i. Will wastewater or stormwater be discharged into a wetland? ^Yes ®No ^NA If yes, will this discharged water be of the same salinity as the receiving water? ^Yes ^No ^NA j. Is there any mitigation proposed? ^Yes ®No ^NA If yes, attach a mitigation proposal. <Form continues on back> 6:. Additional Information In addition fo this-completed-application form, (MP=1) the following items below,. if applicable, must be submitted ir- orclerfor the application package to be complete. Items (a) - (f) are ahvays applicable to any major development application. Please consult the applicat)on insbuction booked on how toproperly prep&reYherequired items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by cert~ed mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Thomas $ass Phone No. 252-482-3972 Address 111 QUEEN ANNE pR EDENTON, NC 27932 Name US Fish & Wildlife Service, Edenton National Fish Hatchery Phone No. 252-482-4118 Address 1104 W. Queen St, Edenton, NC 27932 '.Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, ff applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Cert~cation and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certi that the information rovided in this a tication is truthful to the best of m knowled e. ~~>o fY P PP Y 9 ~~ ~E~l~ Date ~ /'7~i3S' Print Name Rp t3c`3i E 1-~Cri•TcrJ `J~l:y - ! NkUiil~ Signature ~~~~ ai .. ~~- _~~,~ST,~.1llljfWl~C~EC~Ii`i~,;"x~ Fli>nfjPih f":ih~~ Form DCM MP-1 (Page 5 of 5) Please indicate application attachments pertaining to your proposed project. ^DCM MP-2 Excavation and Fill Information DCM MP-5 Bridges and Culverts ^DCM MP-3 Upland Development DCM MP-4 Structures Information APPLICATION for Major Development Permit Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND.DEVELOPMENT a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. proposed. o bOG<rd u. (~- ~~ Density (give the number of residential units and the units per acre). N If the proposed projed will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land-disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? Size of area to be graded, filled, or disturbed including roads, ditches, etc. 1.9 ~y s~.,. -~~: f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. ~~~~ ^Yes ^No A (ii) If yes, list the da a submitted: g. Give the percentage of the trail within the coastal shoreline AEC to be covered by impervious and/or built-upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. i. Give the percentage of the entire tract to be covered by impervious and/or built-upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. >~0 j. Descnribhe proposed method of sewage disposal. / V h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ^Yes ~No ^NA (ii) If yes, list the date submitted: Have the facilities described in Item (i) received state or local approval? ^Yes ~No~. NNA If yes, attach appropriate documentation. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges). Does the proposed projed include an innovative stormwater design? ^Yes ~No ^NA If yes, attach appropriate documentation. ., ,~3 ISwW Y~ u~~~ ~i"i<'~W :k 7~%~yLk°~s.'~'~~n ~~ +[~.r~a~<'~P~K~~~i 5~i" n.;g ~--ui~°:,.,,j ~~~. ,~~ et'~ d ~. ;r m. Describe proposed drinking water supply source (e.g., well, n. (i) Will water be impounded? []Yes ~No ^NA community, public system, etc.) (ii) If yes, how many acres? o. When was the lot(s) platted and recorded? p. If proposed development is a subdivision, will additional utilities be 9y installed for this upland development? O~ ~/~--~U U ^Yes ^No [~'NA 3~3/'~r~ Date ~~co~~a ~~f ~.i,-~~~~~w~~ Project Name CHoc%4nl couNTy/ Applicant Name `~e~.~ ,~°~~.y~7`e-~.. ~.liu,~,,,: Dom, Applicant'Signature ~~ ~~~ Form DCM MP-4 STRV CT V RES ~~~~~s~~~~~~~r~i=~~ (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS ®This section not applicable a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ^Commercial ®Public/Govemment ^Private/Community ®Yes ^No c. (i) Dock(s) and/or pier(s) (ii) Number (iii) Length (iv) Width (v) Floating ^Yes ^No d. (i) Are Finger Piers included? ^Yes ®No If yes: (ii) Number (iii) Length (iv) Width (v) Floating ^Yes ^No e. (i) Are Platforms included? ®Yes ^No If yes: (ii) Number I (iii) Length 30 ~ (iv) Width ~ ~ (v) Floating ^Yes ®No Note: Roofed areas ere calculated from dripline dimensions. g. (i) Number of slips proposed (li) Number of slips existing i. Check the proposed type of siting: ^ Land cut and access channel ^Open water; dredging for basin and/or channel ®Open water; no dredging required ^Other; please describe: k• Typical boat length: f. (i) Are Boatlifts included? ^Yes ®No If yes: (ii) Number (iii) Length (iv) Width h. Check all the types of services to be provided. ^ Full service, including travel lift and/or rail, repair or maintenance service ^ Dockage, fuel, and marine supplies ^ Dockage ('wvet slips") only, number of slips: ^ Dry storage; number of boats: ^ Boat ramp(s); number of boat ramps: ^ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). t:u110~$~ K2yAhS I. (i) Will the facility be open to the general public? ®Yes ^No m. (i) Will the facility have tie pilings? ^Yes ^c No (ii) If yes number of tie pilings? _,`f e`,~"., Ei,,e~.y $ ~gy'4.~:~:~x p, ~::~'tS_ sE~i°fi' '4r" ;F•° a;: r_,=r ~d 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not appticabte + a. Check each of the following sanitary facilities that will be included in the proposed project. ^ Office Toilets ^ Toilets for patrons; Number: ;Location: ^ Showers ^ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h• Give the number of channel markers and "No Wake" signs proposed. i. Give the location offuel-handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live-aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? ^Yes ^No , ~. j- {a~"i~:a~ ~h_'~0~•:~'~a Yt.~~""~",' ar:t N`~-0, ,... r. ; ;ga F. nt ^'S.E"`~ ,s c.F ti' ~N4 n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ^Yes ^No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)7 If any boxes are checked, provide the number of square feet affected. ^CW ^SAV ^SB ^WL ^None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ^Yes ^No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE {including covered ]itts) ®This section not applicable a. (i) Is the boathouse structure(s): ^Commercial ^PubliGGovemment ^Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4 GROIN (e.g., wood; sheetpile; etc. Ifa rockgroin, use MP-2, Excavation and Fill.J ` ®This section rrotapplicable a• (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., -wood, sheetpile, etc.) ®Thissection not applicable a• Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PIL/NGS and BUOYS: ®This section not applicable a. Is the structure(s): b. Number ^Commercial ^Public/Government ^Private/Community c• Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL g ~~iL e~~S ~f+.~"_~3 i,11~+.~,'~'_._''" ~C„i~:[~'B. ~':,4`~:`~s:~ t3 °C;°~ e~, P.3~i~~ a. Proximity of structure(s) to adjacent riparian property lines 1, 300 ft to 1, 500 ft. b. Proximity of structure(s) to adjacent docking facilities. 6,200 ft Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body Approximatey 100 ft. d. Water depth at waterward end of structure at NLW or NWL 2ft e. (i) Will navigational aids be required as a result of the project? ^Yes j~JNo ^NA (ii) If yes, explain what type and how they will be implemented. 8. OTHER ^This section not applicable a. Give complete description: Chowan County has a CAMA Waterfront Access Grant to construct a 1,300 ft by 6 ft boardwalk along Pembroke Creek at the new Red Banks Farm Park in Edenton. A 6 ft by 30 ft platform for launching canoes and kayaks will be constructed along the middle section of the boardwalk. The east and west sections of the boardwalk will be constructed through small sections of wetland forest. To minimize impact to the wetland forests, the boardwalk will meander around trees from the river's edge to the river bank. The county plans to construct a walking trail around the park, which will connect with the boardwalk at both ends. The general public will be able to use the boardwalk for exercising, birdwatching, and fishing on Pembroke Creek. Thecanoe/kayak launch will provide easy access for water-based recreation. Chowan County Parks and Recreation will maintain the boardwalk and supervise public access. The pilings for the boardwalk will be round, 14 ft minimum length, and driven to a minimum length of 8 ft. All pilings will be treated to 2.5 salt water treatment. All lumber material will be pressure treated to 0.4 CCA minimum. The grade shall comply with State Code. All nails, screws, bolts, washers, nuts and etc. shall be galvanized. A kickrail wil- be used rather than handrail on the boardwalk. A tracked pile driver andlor barge with pile driver will be used to construct the boardwalk. The equipment will be stored on the Red Banks Farm property during construction. -~ ~~~ ~~~7 J~~ Applicant Signature Date / ~EC~i~E Project Name ,' 1~ _r, .,"..~P'1~~/1tliluYlV~V~iVIhlli~_ Applicant Name Elizpbefh ~'ji'1~ - ~ `' ~ , i{)~i~t, ate: .. ~~> ~~ ~a~ .fly s;~~~; L~ >'R ~ ~ 22 1 ~ 2L~(7 ~HE~ i S - - --- ---t------- - -- ------ -- -- -- ---__- ----------------- +L+.LLLtt ~ ~ • pFESB • '~ t~ 30. _ ~ ~ ~ G~pr~,~.ss ~~`,~ t ~ ~' _ ~ SEA _ t. _: ~, ~ V ~ ~~ , ~ 3266 ~ ~ , ~~- > ,j, } ... .• ~ _ 3''. ! h~ ~ Y1, 1 JfJPW ~ ,,,({{ ~ ~( (~ - , ~1 , .}Wi 1.~' ~ ~ .IIN ~ ~ r- > . ... fop' X r6`= rL~ :wa ,. moo` .s, ~~..`` C3 ~ u~~ Z- 7. q' ° _ B,bK `. _ . ~.,,,~ 'qtr.. p 'gip, ,i , ~. ti_ WL ~ ~ CS["Aa4-~:5 ~tZ'1~1~~.+'~J~,.~.:~~~'~' L (r./'. ~ /~ ~1•~.`,~" ~~~~'t '~` ``~~'--~~~ '- `: ~ ~` ~O~t~i. E-~' -r > 6~J '~`-, ~ ~( ~ J: L~+ LPct{~ ~` f"y ~1~~~~~p 3~ .~/~a-~^ ~ ~ ` ~~IS~up..Fj~'~ .,fit i x~~ _ c~ 3 e..: ~ r:.,. L+ .~ Ct~K~D L~~D ~ ~ ~ .L~ C I.~ ~~ ~ ~s ~ ur~~D ~ ~ a P~ l`L . o c C ~~11. l ~~'~-~, 0'~~ tj~~~/. '~ • M ~. R.'os-----_ ~j~ ~ _ ~- *~ +-~ Z ~~ ~ g o ~e . ~ •1~3 Zj, ~ 4a ' ra~3 1 ' 1`~ ~~•~~` ~3Ab'o .~,~,,,r`- , _. ~ ~ ~ ' ~' ~?~d }~'~ t''~~„~`'~ a y ,~ ., o - So~-~z ~ ,yam; •;~33Nf~N~...~,~~ ~ ~~~ d3S ~ o~ N~~~,o W ~ Q~ '~'`~ -~~I~i ~ "~ `1 ~S Vr~+~~7~`l>'1 d WEE ~-- ~ 1`401 '~ `~C~ ~k '1` ` I sdi•a`~'~]-~~Q_ ~y~ilfMQ~J.'~`o~--~-1~' ~ ~'~ ~ ~~ - o'o;1N\N z ~ __. ,., .. ._ -,-~-r+~ -, ~v~ ~, fix z+ .. M ,~ ,, . •~ ~ ~ ~~ °~ ~ I i ~ Y y-1'd~ m ~~o~lb`~,. p t~ ~Y s.~~~a~s one v~~~zz ~~r~~~l si~a~s coy ~~~-zz ~ ~.~~a€~s ~¢ ~~,~~ ,. ~ cr~E,'~*~bs:,~ ~a A ~..,a ~ ..~ eY6 ~~ ~~ t,µ ca'! ~D~E ok= ~va~T~2at_ ~~EGtzk- ll>~st-~et~F JA~~ES; .S ~ t.(oTE { Du E To lR QE.I~,ULAR S 1-~OZ<c. Lt blE ~~"P,~~qE 2 ~ Lam.. ~ orl o ~ TR~S ~T WatE.azs E ~ ~A ~„ - , ~Z'Eb ~uuCS Ea.taC'- l~.e.P~c C ., k R .'::: ~•. ~-:- - ~~h~ 4 .: ~: a : aZSa : ~ loo ;.FNejN~+~~; ~~; ~ y ~.....•• ~ ~~ ~~''~.;~ ~AVE~QO.•~. ~' NC~Cj C'~ ~.~L ~nrp.~tz L ~/AL ^~~ s r ,~ ~~ E r7~ o•~-e,~~~k T~ P.~~ o~T ODE L.E~t2. ~ ~ k ~ S~' ~_ tvct-_T_cZE S ~ i ~j'C'o2+~ t_t r~~, r ~~1. °8 3 O 'Z l~~u d CO~K ~.~ ~a ~ ~. r nlI ~ O ~y ' ~ ~ n iiii~~~~ ~ ~~ ,.Z, C I \ ~ ~~ _r ~" ~. i.... X73 ~;1 s [z ~~ ~~ i~ i R ~ -30 ~. 3 v~' O 54 \l ~i J t ~'f " ,L ~ us i~ i ~ av __== =- West Queen~t Fztv~ed-----~- ~b~~ v ~~~~ ~ ~ x ~ ~ Red Banks pit ~ Public Recreation Facilit ~~~ y ` E t -~'~ ; Edenton, North Carolina ~Y~ ~~~ ~-~ r ~~~_ tr ~~~