Loading...
HomeMy WebLinkAbout20071944 Ver 2_Approval Letter_20080416Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality April 16, 2008 Mr. Mike Labounty Spivey &Sturdivant Properties 130 A Wicker Street Sanford, NC 27330 Re: Spivey &Sturdivant Single Family Residence, Lee County DWQ #20071944, Ver. 2; USACE Action ID. No. 200800041 APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Labounty: Attached hereto is a copy of Certification No. 3738 issued to Mr. Mike Labounty and Spivey & Sturdivant Properties, dated April 16, 2008. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Solid Waste, Sediment and Erosion Control, Stormwater, Dam Safety, Non-discharge and Water Supply Watershed regulations. If we can be of further assistance, do not hesitate to contact us. CHS/cbk/ijm Attachments: Certificate of Completion cc: Becky Fox, EPA, 1307 Firefly Road, Whittier, NC 28789 U.S. Army Corps of Engineers, Raleigh Regulatory Field Office, Wilmington District, USACOE Lauren Witherspoon, DWQ, Raleigh Regional Office DLR Raleigh Regional Office File Copy Central Files Thomas Colson, F&R, Inc., 310. Hubert Street, Raleigh, NC 27603 Filename: 071944Ver2SpiveyAndSturdivantProperties(Lee)401_IC 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 /Internet: httn•//h2o enr state nc us/ncwetlands Nose Carolina ~tura!!r~ An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Mr. Mike Labounty and Spivey &Sturdivant Properties Page 2 of 4 April 16, 2008 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92- 500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 2H, Section .0500 to Mr. Mike Labounty and Spivey &Sturdivant Properties, to place fill within or otherwise impact 0.08 acres of 404/wetland and 36 linear feet of perennial stream to construct a residential development at the site which is located on Blue Jay Drive within the existing Quali Ridge development, near Sanford, in Lee County, North Carolina, pursuant to an application dated March 12, 2008 and received by the DWQ on March 17, 2008, by Public Notice by the U.S. Army Corps of Engineers issued on the 26`i' day of February of 2008 (received by DWQ on March 17, 2008). The application and supporting documentation provides adequate assurance that the proposed work will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval is only valid for the purpose and design submitted in the application materials and as described in the Public Notice. If the project is changed, prior to notification a new application for a new Certification is required. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions of this Certification. Any new owner must notify the Division and request the Certification be issued in their name. Should wetland or stream fill be requested in the future, compensatory mitigation may be "required as described in 15A NCAC 2H .0506 (h) (6) and (7). If any plan revisions from the approved site plan result in a change in stream or wetland impact or an increase in impervious surfaces, the DWQ shall be notified in writing and a new application for 401 Certification may be required. For this approval to be valid, compliance with the conditions listed below is required. Conditions of Certification: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: T e of Im act Amount A roved Units Plan Location or Reference 404/Wetland 0.08 acres A lication and Public Notice Stream -Perennial 36 (linear feet A lication and Public Notice Sediment and Erosion Control: 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices Mr. Mike Labounty and Spivey &Sturdivant Properties Page 3 of 4 April 16, 2008 shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 3. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the 404/401 Permit Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur; 4. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project; 5. Protective Fencing -The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 2B .0259; Continuing Compliance: 6. Mr. Mike Labounty and Spivey &Sturdivant Properties shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the Certification, the Division shall notify Mr. Mike Labounty and Spivey & Sturdivant Properties, and the US Army Corps of Engineers, provide public notice in accordance with I SA NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to Mr. Mike Labounty and Spivey &Sturdivant Properties, in writing, shall be provided to the United States Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project; 7. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 OversightBxpress Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Mr. Mike Labounty and Spivey & Sturdivant Properties Page 4 of 4 April 16, 2008 Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. If this Certification is unacceptable to you, you have the right to an adjudicatory hearing upon written request within sixty (60) days following receipt of this Certification. This request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If modifications are made to an original Certification, you have the right to an adjudicatory hearing on the modifications upon written request within sixty (60) days following receipt of the Certification. Unless such demands are made, this Certification shall be final and binding. 3738 CHS/cbk/ijm