Loading...
HomeMy WebLinkAbout20061798 Ver 6_More Info Received_20080416CAROLINA ECOSYSTEMS, IhIC. 8208 Brian Ct.; Garner, NC 27529 P:919-606-1065 - F:919-341-4474 TRANSMITTAL FORM To: Cyndi Karoly NC Division of Water Quality Wetlands Unit 2321 Crabtree Blvd Raleigh, NC 27604 Date: 04/17/08 Project: Summerwind Plantation Reference No.: We are sending you: ®Attached The following items: ^ Email ^ Under Separate Cover COPIES DATE ITEM NO. DESCRIPTION ~ 04/16/08 1 Letter res ondin to DWQ R uest for More Information 04/08/08 2 Prelimina Stormwater BMP Plan ~ 4/08/08 3 Stormwater BMP Checklists, Details, 8~ Calculations These items are transmitted as checked below: ® For approval ^ For your use ^ As requested ^ For review and comment ^ Approved as submitted ^ Approved as noted ^ Please return ^ Other: Comments: o ~~~~~~~ ~. APR 1 6 2008 ~~,T~.ANDS AND ST~ORMWATER ~" Signed: \' ~/ Name: Philip May Title: Senior Environmental Scientist Copied to: Robert Tucker, Wetherill Engineering, Inc. Ron Mikesh, Summerwind Plantation CAROLINA ECOSYSTEMS, Irvc. April 16, 2008 Ms. Cyndi Kazoly 401 Ovesight/Express Review Permitting Unit NC Division of Water Quality 2321 Crabtree Blvd. Suite 250 Raleigh, North Cazolina 27604 RE: Summerwind Plantation DWQ Project # 06-1798, Ver. 6 8208 Brian Ct.; Garner, NC 27529 P:919-606-1065 - F:9I9-341-4474 ~,~ ~.,~~ D~,_. A~ ~ ~ ~; `% ~~i18 DENS, v 510RMWa E~D~~ ~.~p,NDS AND Dear Ms. Karoly; The purpose of this letter is to respond on behalf of Summerwind Plantation and Wetherill Engineering, Inc. to your February 20, 2008 Request for More Information for the above referenced project. Each requested item is shown below in italics, with our corresponding response. 1. 165 linear feet of compensatory stream mitigation is required for this project. Please provide a compensatory mitigation plan. The plan must conform to the requirements of 1 SA NCAC 2H. 0500 and must be appropriate to the type of impacts proposed. Please have Earthmark Mitigation Services provide a letter clearly indicating that they will provide you with 165 linear feet of stream mitigation credits. A letter from Earthmazk, dated February 7, 2008, was included in the original application at the end of Attachment 4: Regulatory Correspondence. The bank has recently received its initial credit release and the stream credits are available. 2. 7,329 square feet of compensatory buffer mitigation is required for this project. Please provide a compensatory mitigation plan. The plan must conform to the requirements of 1 SA NCAC 2H. 0500 and must be appropriate to the type of impacts proposed. Please have NCEEP provide a letter clearly indicating that they will provide you with 7,329 square feet of buffer mitigation credits. A letter from EEP, dated November 8, 2007, was included in the original application at the end of Attachment 4: Regulatory Correspondence. The approved amount of buffer mitigation is well in excess of the 7,329 square feet required for the project. Ms. Cyndi Karoly April 16, 2008 Page 2 of 2 3. Please provide diffuse flow provision measures, applicable worksheets and a signed and notarized Operations and Maintenance agreement for the site. The following items are included in the attached plans and calculations: - Full size plan set showing plan views of all proposed and conceptual BMPs. - Required Items Checklists for the BMPs in Phases 1 A and 1 B. - O&M agreements for BMPs in Phases 1 A and 1 B. - Supplement forms and calculations for BMPs in future phases. As discussed with Annette Lucas, the BMPs provided in the attached plans comply with DWQ diffuse flow provisions, considering the severe site constraints. Wetherill Engineering has redesigned several of the BMPs based on these discussions, and the revised plans are attached. Supplement forms for Phase 1 A and 1 B BMPs were included in the original submittal. Supplement forms and calculations for the future BMP locations are attached to provide evidence that diffuse flow can be achieved on the site, but since these future designs aze conceptual in nature no checklists aze included. Additional design information, required items checklists, and O&M forms for the future BMPs will be submitted upon final design after approval by Johnston County. 4. Please note the DWQ must receive your stormwater management plan approval letter from Johnston County before the impacts proposed in your application may be conducted upon approval. The stormwater management plans for each phase of the project (starting with Phases 1 A and 1 B) will be forwazded to your office along with their Johnston County approval letters as they are received. If you have any questions regarding the information or responses provided please contact me at your earliest convenience at (919) 606-1065. Sincerely, Carolina Ecosystems, Inc. Philip a Senior i ental Scientist Cc: Thomas Brown, USACE Raleigh Regulatory Office Lauren Witherspoon, NCDWQ Raleigh Regional Office Ron Mikesh, Summerwind Plantation Edward Wetherill, P.E., Wetherill Engineering, Inc. Permit No. (to be provided by DWO) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result In a request for additional information. This will delay final review and approval of the project Initial in the space provided io indicate the following design requirements have been met. If the applicant has designated an agent, the a ent may initial below. If a requirement has not been met, attach justification. F~ Initials Pagel Plan ~~,~~,~~ Sheet No. c~ P 1 w(o ~b ~~- Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, - Oif-site drainage (If applicable), -Delineated drainage basins (include Rational C coefficient per basin), -Wetland dimensions (and length to width ratio), -Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), -Overflow device, and - Boundaries of drainage easement. 2. Plan details (1" = 50' or larger) for the wetland showing: - Wetland dimensions (and length to width ratio) - Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), -Design at ultimate build-out, -Off-site drainage (if applicable), -Overflow device, and - Boundaries of drainage easement. - e an ayers All wetlands: Shallow land depth, shallow water depth, deep pool depth Option 1, no clay liner: SLWT depth Option 2, clay liner: Depth of topsoil on top of liner, liner specifications D ~n~n d~ i1~T~NOS~~~; ay,~r < ~~8 _.¢ 3. SSide slopes 3 t~ orr toward (1" = 20' or larger) showing: '~N®sT~~~~~~~ W tl dI ~~ 4. A detailed planting plan (1' = 20' or larger) prepared by a qualified individual showing: - A variety of suitable species {not including cattails), -Sizes, spacing and locations of plantings, - Total quantity of each type of plant specified, - A planting detail, -The source nursery for the plants, and jam' -Fertilizer and watering requirements to establish vegetation. ~~" ~~~ ~ 5. A construction sequence that shows how the wetland will be protected from sediment untl the entire n,~ { drainage area is stabilized. ," ' / 6. The supporting calculations (including drawdown calculations). 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. B. A copy of the deed restrictions (if required). -1~_ ~_ 9. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. SW401-Wetland-Rev.2 Pari III, page 1 of 1 Permit {to be provided by DWQJ III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the topowing design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. /a ~~'(~ nu~ Pagel Plan ~,,~/~~,.1--'~/ Initials Sheet No. ~ GPa'i. i, Z 7, Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, -Off-site drainage (if applicable), -Delineated drainage basins (include Rational C coefficient per basin), -Basin dimensions, -Pretreatment system, -High flow bypass system, -Maintenance access, -Proposed drainage easement and publ~ right of way (ROVIr), -Overflow device, and -Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, -Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, -Basin cross-section, - Vegetation specificatron for planting shelf, and -Filter scrip. -~^~ 3. Section view of the dry detention basin (1" = 20' or larger} showing: - Side slopes, 3:1 or lower, -Pretreatment and treatment areas, and - Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified ~,!~' ` on the plans prior to use as a wet detention basin. -___L __ ~~ 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, ~~/~' f'" ~ ) to verify volume provided. ~ 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M} agreement. 9. A copy of the deed restrictions (if required). t" ~_ 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.4 Part III. Required Items Checklist, Page 1 or 1 III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below.lf a requirement has not been met, attach justffication. Page! Plan Ini i Sheet No. (:1(~I. z ~l ~' ~,~ Plans {1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, -Off-site drainage (if applicable), -Delineated drainage basins (include Rational C coeffiaent per basin), - Forebay (if applicable), -High flow bypass system, -Maintenance access, -Proposed drainage easement and public right of way (ROthr), and -Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), -High flow bypass system, -One foot topo lines between the level lip and top of stream bank, -Proposed drainage easement, and - Design at ultimate build-out. t ~ ~ J 3. Section view of the level spreader (1' = 20' or larger) showing: - Underdrain system (if applicable), -Level lip, - Upsbpe channel, and - Downslope filter fabric. ~ 4. Adate-stamped photograph of the filter strip that clearly shows the type of vegetation that is present. x 5. A consUuction sequence that shows how the level spreader wiN be protected from sediment until the entire drainage area is stabilized. ~/ 6. The supporting cak~lations. / 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. 8. A copy of the deed restrictions (if required). Form SW4U1-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.4 Parl III, page 1 of 1 Permit No (to 6e provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional informatlon. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below.lf a requirement has not been met, attach justification. ~~ ) ~ -~~lki~~ .~ Pagel Plan Initials Sh t o., ~ " ' • 1. Plans (1 - 50 or larger) of the entire site showing: -Design at ultimate build-out, -Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), -Basin dimensions, - Pretreatment system, -High flow bypass system, -Maintenance access, -Proposed drainage easement and public right of way (ROUV}, - Overflow device, and -Boundaries of drainage easement. //~ CJC 1 ~ ~- 2. Partial plan {1" = 30' or larger) and details for the wet detention basin showing: -Outlet structure with trash rack or similar, -Maintenance access, -Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, -Basin cross-section, - Vegetation specification for planting shelf, and n ~ f~ i,R ~./ ~ -Filter strip. 3. Section view of the dry detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, -Pretreatment and treatment areas, and -Inlet and outlet structures. Z 4. If the basin is used for sediment and erosion control during consUuction, clean out of the basin is specified n~ t~ ~ on the plans prior to use as a wet detention basin. 5 A t bl f l . a e o e evations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. _~~ 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. ~_ 7. The supporting ca~ulations. '~' 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required}. _ ~ ~ 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form 5W401-Wet Detention Basin-Rev.4 Parl Ifl. Required Hems Checklist, Page 1 of 1 III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justlficatlon. Page! Plan Intt S~he~et'N`o. ~• ° 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, -Off-site drainage (if applicable), - Deaneated drainage basins (include Rational C coefficient per basin), - Forebay (if applicable), - Hlgh flow bypass system, -Maintenance access, - Proposed drainage easement and public right of way (ROU4r7, and -Boundaries of drainage easement. ~ (~ 2. Plan details (1' = 30' or larger) for the level spreader showing: - Forebay (ff applicable), -High flow bypass system, -One foot topo lines between the level lip and top of stream bank, -Proposed drainage easement, and C~ -Design at ultimate build-out. ~l~ 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), -Level lip, - Upsbpe channel, and - Downslope filter fabric. 4. Adale-stamped photograph of the filter strip that clearly shows the type of vegetation that is present. 5. A construction sequence that shows how the level spreader wiN be protected from sediment until the entire drainage area is stabilized. - 6. The supporting calculations. 7. A copy of the signed and notarized operation and maintenance (OEM) agreement. 8. A copy of the deed restrictions (if required). Forrn SW401-Level Spreader, Filler Strip, Restored Riparian Buffer-Rev.4 Part III, page 1 of 1 Pennir Number. (ro be pro-~r d br Dfi~O) Drninnge Area Number. l ~ o-.;p i Wet Detention Sasin Operation and Maintenance Agreement I will keep a maintenance record on this BNII'. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These defidencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BIvII'. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. T system (check one): does ^ does not incorporate a vegetated filter at the outlet. This system (~1'ieck o~:e): does does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be m;n;m;~ed to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set Iocation and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential roblem: Flow I will remediate the roblem: The entire BMP Trash debris is resent. Remove the trash debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the guIIy, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer a lication. Vegetation is too short or too Maintain vegetation at a Insight of Ion a roximatel six inches. Form SW40]-Wet Detention Basin O&M-Rev.3 Page 1 of 4 Permit Number. (to be prori~led by D!!'Q) Drainage Area Number: ) ij Q~:Sp.,t BMP element: Potential roblem: How I will remediate the roblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the Swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise dams ed. Erosion is occurring in the Regrade the swale if necessary to Swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future roblems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage, dispose of it in a location where it will not cause impacts to streams or the BIvII'. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to revent future erosion roblems. Weeds are present Remove the weeds, preferably by hand. if pesticide is used, wipe it on the ]ants rather titian s ra in . The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to mainiain optimal plant health. Plants are dead, diseased or Determine the source of the dy~g• problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide aone-time fertilizer application to eslabiish the ground cover if a soil best indicates it is necess Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the ]ants rather than s ra The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50 ~ of the area. and control the al ! owth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50 0 of with pesticide (do not spray). the basin surface. Forni S1'V401-Wet Detention Basin O&M-Rev.3 Page 2 of 4 Pemtil Number: (to be provided Gr D1T'Q) Drainage Area Number: t 3 17c N q { BMP element: Potential roblem: How I will remediate the roblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree Itas started to grow on Consult a dam safety specialist to the embankment remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs re air. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is dama d Re air or re lace the outlet device. The receiving water Erosion or outer signs of Contact the IocaI NC Division of damage have occurred at the Water Quality Regional Office, or outlet the 407 Oversight Unit at 9]9-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penehate into accumulated sediments. When the permanent pool depth reads 5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads ~" feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASDV DIAGRAM ~N In the Glrntbs) p Permanent Pool Elevation Z4 2 Z-~j Pe anen Pool --------------- - Volume Sediment Removal Elevation 7.~'(1 i --~7 R Min. --------------------- Volume Sediment Bottom Elevation ~] 1-R r Storage edimei Storage TORE$AY MAiN POND Fortrt SW~101-Wet Detention Basin 08cM-Rev.3 Page 3 of 4 Permit Number. (1u Ge prorrdc~d Gig DlPO) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: S~ MMt-,/~.i, h~ U~u.~~-~r,,-~ F,,, BAIP drainage area trtrmber: I .~ Pa ~ t) ~ NOte: The legally responsible party should not be a Homeowners association unless more than 30% of the lots have been sold and a resident of the subdivision Has been named tlu president. I, /l ~ h ~' ~'n~ />` ~,/' Ozc/C~'~- ,1~„ C~ , a Notary Public for the State of ll'C: , County of _ C l~/i-~' -~ , do hereby certify that _.~LC'i//}~~ ~~%i~c'~~ personally appeared before me this day of~~~ ~?~~~ - ,and acknowledge the due execution of the Forgoin~we/t detention U/a~sin maintenance requirements. Witness my trend and official seal, ' ~G~~GC~.e lf' ~~ ~ , ~~~~ ~+ ~~~ ~~.``~,P A. CRQ ~`•. a~ ~pTARY ~;~~ ~ ~::~ ~ P(;~3!-ice .~'c~ -~ ~ . fi SEAL My commission expires ~ _ ~ ~ -~ ~ !C Form SW4Q 1-Wet Detention Basin O&M-Rev.3 Page 4 of 4 Permit Number: (lo Ge prorided Gr R'J Drainage Area Number. i (~j ~vd Stormwater Wetland Operation and Maintenance Agreement I wilt keep a maintenance record on this BIVIl'. This maintenance record will be kept in a log in a known set Iocation. Any deficient B1VIl' elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the uitegrity of sh•uchues, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately after the stormwater wetland is established, the wetland plants will be watered twice weeny if needed until the plants become established (commonly six weeks). - No portion of the stormwater wetland will be fertilized after the first initial fertilization that is required to establish the wetland plants. - Stable groundcover will be maintained in the drainage area to reduce the sediment Ioad to the wet detention basin. - Once a year, a dam safety expert will inspect the embankment. After the wet detention pond is established, I will inspect it once a month and within 24 hours after every storm event greater than I.0 inches (or 15 inches if in a Coastal Connty). Records of operation and maintenance will be kept in a I:nown set location and wilt be available upon request. Inspection activities shah be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential roblem: How I will remediate the roblem: The entire BMP Trash debris is resent Remove the trash debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to wetland erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer a lication. Vegetation is too short or too Maintain vegetation at a height of lon a roximatel six inches. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the Swale a licable . sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged (if a licable . Erosion is occurring in the Regrade the Swale if necessary to Swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future roblems with erosion. Farn~ SW401-Wetland O&M-Rev.3 Page I of 4 BMP element Potential roblem: How I will remediate the roblem: The forebay Sediment has accumulated in Search for the source of the the forebay to a depth that sediment and remedy the problem if inhibits the forebay from possible. Remove the sediment and functioning well. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to revent future erosion roblems. Weeds are present. Remove the weeds, preferably by hand. Tf a pesticide is used, wipe it on the lants rather than s ra in . The deep pool, shallow Algal growth covers over Consult a professional to remove water and shallow land 50~ of the deep pool and and control the algal growth. areas shallow water areas. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50 ~ of with pesticide (do not spray) - the deep pool and shallow consult a professional. water areas. Shallow land remains Flooded Unclog die outlet device more than S days after a immediately. storm event. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide cone-time fertilizer application to establish the ground cover if a soil test indicates it is necessa Best professional practices Prune according to best professional show that pruning is needed practices. to maintain optimal plant health. Sediment has accumulated Search for the source of the and reduced the depth to 75 o sediment and remedy the problem if of the original design depth possible. Remove the sediment and of tlie deep pools. dispose of it in a location where it will not cause impacts to streams or the BMP. I=omt 5W~0I-Wetland OEM-Rev.3 Page 2 of 4 BMP element-. Potential roblem: How I will remediate the roblem: The embankment A tree has started to grow on Consult a dam safety specialist to the embankmenk remove the tree. An annual inspection by an Make all needed repairs. appropriate professional sltotvs that dte embankment needs re air. Evidence of muskrat or Use traps to remove muskrats and beaver activity is presenk consult a professional to remove beavers. The micropaol Sediment has accumulated Search for dte source of the and reduced dte depth to 75 o sediment and remedy dte problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Plants are growing in the Remove dte plants, preferably by micropool. hand. If a pesticide is used, wipe it on the !ants radter [Iran s ra in . The outlet device Clogging has occurred. Clean out dte outlet device. Dispose of dte sediment off-site. The outlet device is dama ed Re air or re lace the oudet device. The receiving water Erasion or odter signs of Contact the NC Division of Water damage !rave occurred at the Quality X101 Oversight Unit at 979- oudek 733-1786. I'orni SW~#01-Wetland OEM-Rev.3 Page 3 of 4 Permit Number. (to Ge prnnided GP DIPQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project frame: ~.lnlrrlra~W ~ ~~.~ ~lu.,~-~-h ~,,. B1lIP drainage area ftumbef•: I •[3 stnw~ Note: The legally responsible party should not be a homeowners association unless more Umn 50% of the lots have been sold and a resident of ttre subdivision has been named the president. 1, /~c' f.~ E' <' [~R ~ ~~~~'Z[~CY-~~ , a Notary Public for the State of ~~- , County of G~V A.~ ~ , do hereby certify that f'CL~Nf'q'/CI J~"~i• ~~r~ personally appeared before me this ~_ day of FBI ~~/A2 ~ ( of co a, and acknowledge the due execution of the forgoing,,st~~rmwater wetland maintenance requirements. Witness my hand and official seal, /~..t? ~~C..e~ t~ ~~~c-zc•--~.~~ .,~` q~~ *** = fffft~ \~\~\ SEAL My commission expires_ ~ - . ~ ~ - ~d~b Forni SW401-Wetland O&M-Rev.3 Page 4 of 4 lj~.t;,1~~I~~t.J,nlpS 3 uhl~~-~~- ~"" ~~ ~, -- - _ \ ~ ~ ~ ~~ ~ v ~ v ~~~ ~~ v ~ ~ \ \ ~ ~ ~ ~ ~ ~ - _ _ _ ~ ~ ~ ~~~ ~ _ ~ ~ ~ \ ~ ~ ~ ~Q \ ~ ~~ ~ ~~ I ~ \ \ \\ ~ \\ \ _f ~~\ \ \ \ \ \ ~W \ ,_ ~ I \ \ \ \ \ \\ \ \\ JY1 \\ ~\\\ _~ ~I,\ I \i ,\ \ \ cn \ ~~\ I I i I v \ 11 W V ~ A \ ~i ~ ~ ~ I f \1 \ \\ \\ \ ~~ ~~ 1 I I i I \ \ \ 1 I I \ \ \ \\ ~ \\ I I I I I \ \ > ~ I I I I I 1 \ \ r- - I I I I I 1 \ \\ \\ \\ l \\1 11 ~ i II ~ 1 \ \ I II I I I I 1 \ I I I I I \ \ I \ I I \ \ ~ I I I 1 \ \ I I I I f I \ \ 1 ~ ,a I I I ~ f \ \ \ 1 I I ik I I I f \ \ II I I I \\ \ \ \\I I I Z I ! I I I \\ \\ \\ \\ I II II 0 1 I I I I \ \ I I I ~ I I \ \\ I\ i 3 ~ j II ~~ 1 I I I \ \ I \ V \ I\~ I I I I i I I I \~ J~~~ \ ~ J I II i i ~ ~ I v v v v ~- - -~- ~ I I ~ I I I v v I I I v v v v v I I I ~ V A A I I I I I \v \~ vV A F I I I ~ I I I \ V \ 1 r~ II I I I I li ~ ~ v ~_- _ I I I I I I 1 V , ~~, A I I I I I II I~ ~~ I~ ~ i' ~ ~,~ ~ ~ y v v ~ I I I I I I I I ~ ~% v ' v ~~ I I ~ I I I ;, I~ ~; ~/~ ~ ~ \ 1 V 1 I I I I I I I~ l~ I ~~ ~1 ~ \ 1 I \ I I I I I ~~ \ ~ I I I I I I I I I ~I it ~I ~ ~~~ ~ ~~~ ~ ~~ \\ 1 I i I ! I I I I I ~~ I I ~ l~ ~ 1 I i I I I I I I I~ r II ~~~~~~~ ~l \ 1 1 I I I I 1 ~ ;I 1 11' X11 II III II I III I I I I I ~ ( ~ ~~ ~~~~~ ~ l~~ ~ ,~ll ~ ~~ ~~ ETHERELL ---~~ ..T...,~~i+i,<~it SUBJECT L/~T peiv/~ ~/' 4- PROJECT ~inf~Gcwi~S 559 Jones Franklin Road, Suite 164 LOCATION Raleigh, North Carolina 27606 Phone: 919-851-8077 Fax: 919-851-8107 PREPARED BY DATE STATION 1209 Floral Parkway, Suite B Wilmington, North Carolina 28403 CHECKED BY DATE SHEET OF Phone: 910-799-5682 Fax: 910-799-5684 DIzA~Na~~ AacA; ZB~oS(oecc G•b.vc• jMrGhV~ ou5 ~" ~ 4p %. F~-.r. ?Rb ~C /D ~I /i/GpEN~- STdA.M Wg7Y/~- ~/~P ~A~wuft 1 rM 3 FT ~ f'r S~~r 4a 1.25 ~ s' d~,~ Pte., . ~oa~ s /. Z 5 SAS 1•Z T ~ ~,,.IoAC ~ o.o6t5Acf'r OA i oc = 3 5 9 4 ~t'Z c ~.n. as / P~ P __________ JL~~~,,,v.scl IfaloM t i2vs D~ D 5 ~- D• ~a°I (_~ = ~ D 5 f- • ~ 9(4~0~ 2v~ 0.9,/0 ~..^ /w. Z„ 0.22 55 Rc ~i' 9823 Fri Permit No.____ ___ t'to be provided by DWQ) OF W A rF9 h ~ ~~ ~~ > ~ NCDENR , ` STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist jPart 111J must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Summerwinds Plantation Contact person Mr. Ron Mikesh Phone number 919-291-5517 Date 4/8/2008 Drainage area number Pond #4 Il,i.~lE$IGN-INFQRMA71 N ~ ~~ Site Characteristics Drainage area 288,056 ft~ Impervious area 115,222 >~ impervious 40 °% Design rainfall depth 3.2 in Storage Volume: Non-SR Waters Minimum volume required 9,823 ft3 Volume provided 12,356 ft3 Storage Volume: SR Waters 1-yr, 24-hr runoff depth in Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24•hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is pre/post control of the 1-yr 24-hr peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3.2 in Rational C, pre-development 65.0 (unitless) Rational C, post-development 76.0 (unitless) Rainfall intensity: 1-yr, 24-hr storm N/A in/hr Pre-development 1-yr, 24-hr peak flow 1.9 ft3/sec Post•development 1-yr, 24-hr peak flow 4.8 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 2.9 ft3/sec Basin Elevations Basin bottom elevation 244.00 ft Sediment cleanout elevation 245.00 ft Bottom of shelf elevation 248.50 ft Permanent pool elevation 249.00 ft Top of shelf elevation 249.50 ft Temporary pool elevation 252.00 ft Volume and Surface Area Calculations SA/DA ratio 1.25 (unitless) Surface area at the bottom of shelf 1421.00 ft2 Volume at the bottom of shelf 2833.00 ft3 Permanent pool, surface area required 3,594 ft2 Permanent pool, surface area provided 3,610 ft2 OK Permanent pool volume 10,830 ft3 Average depth for SA/DA tables 3 ft OK Surface area at the top of shelf 4,882 ftz Volume at the top of shelf 12250 ft3 Form SW401-Wet Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) 11. DESIGN INFORMATION Forebay volume 2.000 ft3 Forebay °'° of permanent pool volume 18 °% OK Temporary pool, surface area provided 7,569 ft` Drawdown Calculations Treatment volume drawdown time 2.5 days OK Treatment volume discharge rate 0.42 f13/s Pre-development 1-yr, 24-hr discharge 1.93 ft'/s OK Post-development 1-yr, 24-hr discharge 0.42 ft3/s OK Additional Information Diameter of orifice 2.00 in Design TSS removal 85 °~b Basin side slopes 3 :1 OK Vegetated shelf slope 10 ;1 OK Vegetated shelf width 10 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 3 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1 ft OK Vegetated filter provided? Y (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies Yes Form SW401-Wet Detention Basin-Rev.3 Parts I. 8 II. Design Summary, Page 2 of 2 ~~~a NCDENR o~uF vanTE~,oG ~, ~ :.PV.LW.cf+ <M ,~ .- STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part lll) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION - . , .. Project name Summerwinds Plantation Contact name Mr. Ron Mikesh Phone number 919-291-5517 Date April 8, 2008 Drainage area number Pond #4 IL:DE&I~iN INFQRMA'~ION a.` ~. w. .. For Level Spreaders Receiving Flow From a BMP Type of BMP Wet Detention Drawdown flow from the BMP 1.25 cfs For Level Spreaders Receiving Flow from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 in/hr storm Time of concentration Rainfall intensity, l0-yr storm Peak flow from the 10-yr storm Where Does the Level Spreader Discharge? To a bioretention cell? To a wetland? To a filter strip or riparian buffer? Other (specify) Do not complete this section of the worksheet ff2 ftz Do not complete this section of the worksheet. Do not complete this section of the worksheet. cfs Do not complete this section of the worksheet. min in/hr Do not complete this section of the worksheet. cfs Do not complete this section of the worksheet. N (Y or N) N (Y or N) Y (Y or N) Please complete filter strip characterization below. Filter Strlp or Riparian Buffer Characterization (if applicable) Width of grass ft Width of dense ground cover 50 ff Width of wooded vegetation ft Total width 50 ft Slope (from level lip to to top of bank) 8 Are any draws present? N (Y or N) Level Spreader Design Forebay surface area None sq ft Feet of level lip needed per cfs 13 fUcfs Answer "Y" to one of the following: Length based on the 1 in/hr storm? None (Y or N) Length based on the 10-yr, 24-hr storm? None (Y or N) Length based on the BMP discharge rate? Y (Y or N) Design flow 1.25 cfs Is a bypass device provided? Y (Y or N) Length of the level lip 17 ft Are level spreaders in series? None (Y or N) OK OK OK #,VALUE! Form SW401-Level Spreader, Filter Strip, Restored Riparian Butter-Rev.3 Parts I. and II. Design Summary, page 1 of 2 Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? N (Y or N) Does the channel enter the stream at an angle? Y Dimensions of the channel (see diagram below): M ft B ft W ft y ft Peak velocity in the channel during the 10-yr, 24-hr storm cfs Channel lining material PSRM • • ~. ~"' I •------------- y t --------------• M M i B i Form SW401-Level Spreader, Filter Strip, Restored Riparian Butter-Rev.3 Parts I. and II. Design Summary, page 2 of 2 3S Pre-Dev. Wet Pond #4 1S Est-Dev Subcat (Reach on Link Wet Pond #4- 04_04_08 Prepared by {enter your company name here} Page 2 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Area Listing (all nodes) Area (acres) CN Description (subcats) 3.960 61 Managed Open Space (1S) 6.600 65 Woods/grass comb., Fair, HSG B (3S) 2.640 98 Roads, Houses, & Driveways (1 S) 13.200 Wet Pond #4- 04_04_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 3 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Time span=1.00-144.00 hrs, dt=0.50 hrs, 287 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method -Pond routing by Stor-Ind method Subcatchment 1 S: Post-Dev. Runoff Area=6.600 ac Runoff Depth=1.15" Tc=20.0 min CN=76 Runoff=4.80 cfs 0.634 of Subcatchment 3S: Pre-Dev. Runoff Area=6.600 ac Runoff Depth=0.60" Flow Length=766' Tc=30.4 min CN=65 Runoff=1.93 cfs 0.330 of Pond 2P: Wet Pond #4 Peak Elev=252.01' Storage=18,098 cf Inflow=4.80 cfs 0.634 of Primary=0.42 cfs 0.634 of Secondary=0.00 cfs 0.000 of Outflow=0.42 cfs 0.634 of Total Runoff Area =13.200 ac Runoff Volume = 0.964 of Average Runoff Depth = 0.88" 80.00% Pervious Area = 10.560 ac 20.00% Impervious Area = 2.640 ac Wet Pond #4- 04_04_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 4 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Subcatchment 1 S: Post-Dev. Post-Development Inflow to Pond #4 Drainage Area = 6.6 Acres Impervious = 40% [49] Hint: Tc<2dt may require smaller dt Runoff = 4.80 cfs @ 12.11 hrs, Volume= 0.634 af, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Time Span= 1.00-144.00 hrs, dt= 0.50 hrs Type II 24-hr 1-Yr. 24-Hr. Rainfall=3.20" Area (ac) CN Description 2.640 98 Roads, Houses, & Driveways 3.960 61 Managed Open Space 6.600 76 Weighted Average 3.960 Pervious Area 2.640 Impervious Area Tc min 20.0 Length Slope Velocity Capacity Description (feet) (ft/ft) (ft/sec) (cfs) Direct Entry, Direct Subcatchment 1 S: Post-Dev. Hydrograph ® Runoff 0 1`ype 11.24-hr 1-Yr. 24-Hr. Rainfa11~3.20" Runoff Area=6.600 ac Runoff Volume=0.634'af Runoff Depth-1.15" Tc=20.0 m i n CN=76 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105110115 120125130135140 Time (hours) Wet Pond #4- 04_04_08 Type Il 24-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 5 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Subcatchment 3S: Pre-Dev. Pre-Development Inflow to Pond #4 Drainage Area = 6.6 Acres [49J Hint: Tc<2dt may require smaller dt Runoff = 1.93 cfs C~ 12.50 hrs, Volume= 0.330 af, Depth= 0.60" Runoff by SCS TR-20 method, UH=SCS, Time Span= 1.00-144.00 hrs, dt= 0.50 hrs Type II 24-hr 1-Yr. 24-Hr. Rainfall=3.20" Area (ac) CN Description 6.600 65 Woods/grass comb., Fair, HSG B 6.600 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.2 150 0.0333 0.10 Sheet Flow, Overland Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.20" 6.2 616 0.1104 1.66 Shallow Concentrated Flow, Shallow Concentrated Flow _ _ Woodland Kv= 5.0 fas 30.4 766 Total Subcatchment 3S: Pre-Dev. Hydrograph ® Runoff Type II 24-hr 1-Y~. 2~-Hr Rainfall-3.20" Runoff Area-6.600 ac Runoff Volume-0.330 of `~ Runoff Depth=0.60" LL ~~~ Flow Length-766' Tc-30.4 m i n CN.65 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100105110115120125130135140 Tfine (hours) Wet Pond #4- 04_04_08 Type 11 24-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 6 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Pond 2P: Wet Pond #4 Inflow Area = 6.600 ac, Inflow Depth = 1.15" for 1-Yr. 24-Hr, event Inflow = 4.80 cfs @ 12.11 hrs, Volume= 0.634 of Outflow = 0.42 cfs @ 15.99 hrs, Volume= 0.634 af, Atten= 91 %, Lag= 232.8 min Primary = 0.42 cfs @ 15.99 hrs, Volume= 0.634 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-144.00 hrs, dt= 0.50 hrs Peak Elev= 252.01' @ 15.97 hrs Surf.Area= 7,523 sf Storage= 18,098 cf Plug-Flow detention time= 1,167.2 min calculated for 0.634 of (100% of inflow) Center-of-Mass det. time= 1,163.3 min (2,027.9 - 864.6 ) Volume Invert Avail.Storage Storage Description #1 249.00' 36,353 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 249.00 3,610 0 0 249.50 4, 883 2,123 2,123 250.00 5,722 2,651 4,775 251.00 6, 618 6,170 10, 945 252.00 7,510 7,064 18,009 253.00 8,578 8,044 26,053 254.00 9,693 9,136 35,188 254.10 13, 602 1,165 36, 353 Device Routing Invert Outlet Devices #1 Primary 243.00' 18.0" x 121.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 242.00' S= 0.0083'/' Cc= 0.900 n= 0.024 #2 Device 1 249.00' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 252.00' 0.27' x 0.83' Horiz. Overflow Grate w/Open Slots X 4.00 columns X 5 rows Limited to weir flow C= 0.600 #4 Secondary 253.00' 16.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.36 cfs @ 15.99 hrs HW=252.01' (Free Discharge) L1=Culvert (Passes 0.36 cfs of 13.76 cfs potential flow) ~2=Orifice/Grate (Orifice Controls 0.18 cfs @ 8.24 fps) 3=Overflow Grate w/Open Slots (Weir Controls 0.18 cfs @ 0.36 fps) econdary OutFlow Max=0.00 cfs @ 1.00 hrs HW=249.00' (Free Discharge) =Broad-Crested Rectangular Weir (Controls 0.00 cfs) Wet Pond #4- 04_04_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 7 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Pond 2P: Wet Pond #4 Hydrograph - 4.80cfs ^ Inflow D Outflow Inflow Area=6.600 ac ®Primary ^ Secondary 5 Peak Elev=252.01' Storage=18,098 cf ~ 3 v 3 0 LL 2 -- 0.42 cfs i 1 ~, . 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Tlme (hours) Wet Pond #4- 04_04_08 Type 11 24-hr First Flush Rainfall=3.60" Prepared by {enter your company name here} Page 8 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Time span=1.00-144.00 hrs, dt=0.50 hrs, 287 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method -Pond routing by Stor-Ind method Subcatchment 1 S: Post-Dev. Runoff Area=6.600 ac Runoff Depth=1.44" Tc=20.0 min CN=76 Runoff=6.18 cfs 0.791 of Subcatchment 3S: Pre-Dev. Runoff Area=6.600 ac Runoff Depth=0.81 " Flow Length=766' Tc=30.4 min CN=65 Runoff=2.73 cfs 0.443 of Pond 2P: Wet Pond #4 Peak Elev=252.03' Storage=18,256 cf Inflow=6.18 cfs 0.791 of Primary=1.25 cfs 0.791 of Secondary=0.00 cfs 0.000 of Outflow=1.25 cfs 0.791 of Total Runoff Area = 13.200 ac Runoff Volume =1.234 of Average Runoff Depth =1.12" 80.00% Pervious Area = 10.560 ac 20.00% Impervious Area = 2.640 ac Wet Pond #4- 04_04_08 Type 11 24-hr First Flush Rainfall=3.60" Prepared by {enter your company name here} Page 9 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Subcatchment 1 S: Post-Dev. Post-Development Inflow to Pond #4 Drainage Area = 6.6 Acres Impervious = 40% [49] Hint: Tc<2dt may require smaller dt Runoff = 6.18 cfs ~ 12.10 hrs, Volume= 0.791 af, Depth= 1.44" Runoff by SCS TR-20 method, UH=SCS, Time Span= 1.00-144.00 hrs, dt= 0.50 hrs Type II 24-hr First Flush Rainfall=3.60" Area (ac) CN Descriotion 2.640 98 Roads, Houses, & Driveways 3.960 61 Managed Open Space 6.600 76 Weighted Average 3.960 Pervious Area 2.640 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, Direct Subcatchment 1 S: Post-Dev. Hydrograph ®Runoff s.re crs 6 Type II 24-hr First Flush Rainfa11~3.60" 5 Runoff Area=6.600 ac Runoff Volume=0.791 of w 4 Runoff Depth=1..44" LL 3 Tc=20.O min ~~ CN=76 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100105110115120125 130135140 Tfine (hours) Wet Pond #4- 04_04_08 Type 11 24-hr First Flush Rainfall=3.60" Prepared by {enter your company name here} Page 10 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Subcatchment 3S: Pre-Dev. Pre-Development Inflow to Pond #4 Drainage Area = 6.6 Acres [49] Hint: Tc<2dt may require smaller dt Runoff = 2.73 cfs @ 12.48 hrs, Volume= 0.443 af, Depth= 0.81" Runoff by SCS TR-20 method, UH=SCS, Time Span= 1.00-144.00 hrs, dt= 0.50 hrs Type II 24-hr First Flush Rainfall=3.60" Area (ac) CN Description 6.600 65 Woods/grass comb., Fair, HSG B 6.600 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.2 150 0.0333 0.10 Sheet Flow, Overland Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.20" 6.2 616 0.1104 1.66 Shallow Concentrated Flow, Shallow Concentrated Flow __ Woodland Kv= 5.0 fas 30.4 766 Total Subcatchment 3S: Pre-Dev. Hydrograph 3 ® Runoff 2.73 cfs Type II 24-h1r First. Flush Rainfall=3.60.. Runoff Area-6.600 ac 2 Runoff Volume=0.443 of N v Runoff Depth-0.81'" 3 ~° Flow Length=766' Tc=30.4 min 1-, Y'` CN=65 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100105110115120125130135140 Time (hours) Wet Pond #4- 04_04_08 Type 11 24-hr First Flush Rainfall=3.60'' Prepared by {enter your company name here} Page 11 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Pond 2P: Wet Pond #4 [85] Warning: Oscillations may require Finer Routing>1 Inflow Area = 6.600 ac, Inflow Depth = 1.44" for First Flush event Inflow = 6.18 cfs @ 12.10 hrs, Volume= 0.791 of Outflow = 1.25 cfs @ 13.43 hrs, Volume= 0.791 af, Atten= 80%, Lag= 79.9 min Primary = 1.25 cfs @ 13.43 hrs, Volume= 0.791 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-144.00 hrs, dt= 0.50 hrs Peak Elev= 252.03' @ 13.50 hrs Surf.Area= 7,545 sf Storage= 18,256 cf Plug-Flow detention time= 953.7 min calculated for 0.791 of (100% of inflow) Center-of-Mass det. time= 949.5 min (1,807.4 - 857.9 ) Volume Invert Avail.Storage Storage Description #1 249.00' 36,353 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 249.00 3,610 0 0 249.50 4,883 2,123 2,123 250.00 5,722 2,651 4,775 251.00 6,618 6,170 10,945 252.00 7,510 7,064 18,009 253.00 8,578 8,044 26,053 254.00 9,693 9,136 35,188 254.10 13,602 1,165 36,353 Device Routing Invert Outlet Devices #1 Primary 243.00' 18.0" x 121.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 242.00' S= 0.0083 '/' Cc= 0.900 n= 0.024 #2 Device 1 249.00' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 252.00' 0.27' x 0.83' Horiz. Overflow Grate w/Open Slots X 4.00 columns X 5 rows Limited to weir flow C= 0.600 #4 Secondary 253.00' 16.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.98 cfs @ 13.43 hrs HW=252.03' (Free Discharge) L =Culvert (Passes 0.98 cfs of 13.78 cfs potential flow) ~2_Orifice/Grate (Orifice Controls 0.18 cfs @ 8.27 fps) 3-Overflow Grate w/Open Slots (Weir Controls 0.80 cfs @ 0.58 fps) econdary OutFlow Max=0.00 cfs @ 1.00 hrs HW=249.00' (Free Discharge) =Broad-Crested Rectangular Weir (Controls 0.00 cfs) Wet Pond #4- 04_04_08 Type 11 24-hr First Flush Rainfall=3.60" Prepared by {enter your company name here} Page 12 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Pond 2P: Wet Pond #4 Hydrograph Inflow Area=6.600 ac Peak Elev=252.03' Storage=18,256 cf 5~ m 4 w LL 3 1 25 cfs 25 cfs , ^ Inflow l7 Outflow Primary ^ Secondary 10 20 30 40 50 60 70 SO 90 100 110 120 130 140 Time (hours) ~ ~ r I I I i ~ i _ _ ~ / -- \ I I 1 I I I I ~~ ~~ ~ ---- ------------- ` ~ ~ 1 1 I I t ~ i ~ ~' -, -- i I~ I I I' I I I I I ~~~ /~ / ~ ~- ---- I II I I I I I / / i~ i ~- - ---- ~ --- I' I I 1 I I i / /~// ~ i~ ~ -- -----_ _ 1' I 1 I ~ i ~ i - ,_ II I I I ~ ~~ , / ~ ~ ~ ~~ ------,, ~ `i- ' ~ I I I II II ~ ~ ~ /~ /~ ~~ ~~-------- ~ ~~ ~'-_- - i / i I ~ / / ~ -- II i I I ` / / / ~ ~~ j -~ - _ I' I f I / ~ // i/ / ---- --___ / ~ ~ - _- - I I I / / ~ - I I I I I ( - ~ - )7 ~ - / I I I ~, 1 i I I Ir I I I I I II \ \ \ \ `~ j ~~, ~ \ \ I \ ./ WEy POH6.1Y5 / / /// 1 I i / -~ ~ ~__ -- I ~ i / ' ~~ I/ ~ i I ~ r `~i VFC ,_ __ I I I FOP J i ~~ W L,II N r 1 I ~, I I ` ~ \ --•-c~ -~-~ I \ ~ , i EL SP DER ~ ~ I (SEE DET L) I ~ ~ ~ , \ ~ , ', ~ I , ~ ~, ; ~ v, ~ , , LOW BYPASS - / / I i I I 1 I ~~ I I V' / ~ n \} j/`1/ ~ ~~ ~ ~, \ )SEE ETAIL) ! 1 1 I \ V ~\ . \ ~ ~\ / / / i / / / i I I I 1 I ~ / . ~ ~ \ ~ ~ ;, v ,~~ ~ ~ / d ~- ~ ~ / r I 1 1 I I ' ~~ E / ' ~ ~ I 1 I ' ~ ~ ~ ~ ~ \ ~-------~----- ~ --- i E , ~ i ~ v ,. E -- I , / 1 / __ ~ - -- T------ , - -. - --r---z----~ - -- ~ - - - \ ---------- - - - - - - E - ----= --- ', \ ~` ~ - - - ~ -- ,, ~ - - -r v ~'~ ' = ~ ~ i i i i ~ I ~ ~ , ~ 1 I ~ ~ ~\ ~~ ~- I I I ~ `W ~~ f So' ~ ~ , c,- ETHERILL 559 Jones Franklin Road, Suite 164 Raleigh, North Carolina 27606 Phone:919-851-8077 Fax:919-851-8107 1209 Floral Parkway, Suite B Wilmington, North Carolina 28403 Phone:910-799-5682 Fax: 910-799-5684 SUBJECT Wur Ppivc' ~'a~ PROJECT Sun~n+en.winrdS LOCATION PREPARED BY GSP DATE 4 ~3 /ob STATION CHECKED BY DATE SHEET OF D,q = (off ~ l '~ 8 SF% 15 , ~ 8AG 7•r,PGav,ec•s ~ TO'/ FnoM ? b/c /o - l NG DEr2 STat,n, wA--~rti 6/+7P MA..+w~ ~ ..__ ., 3 Fr 4 Fr 5Fr 4-0 /. 25 ~ S ~ dc~r~i pc~.r- Pao ~ s.? 4 1.2 5 DA ~d~~,,~~a voi~~-~ .~. _ sp6 ~.zs,~ ~s.~aA~- o. ~gga,ocFr ,~ S? toio Fr Z e ~,,, Pab l ltvs O.oS+o.co4121 _ ,os+ .oo9c4o~ 2v= o. ~aw.l~ Vol 1Le~ ~~ ~' ~~.....~C p. gcio ~.. f~ * 1 ~ ~ - 5. l8/.1c. /2 ,. b. 5/$7po~T 22,592~r~ Permit No.___ _ _ _ ito be provided by DWQ) ~~~ _ OF W A rF9 O~ ~G ~ ~ NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111J must be printed, filled out and submitted along with all of the required information. I. PAOJ~CT 1NFORMATIi~N ,: ~~ '. Project name Summerwinds Plantation Contact person Mr. Ron Mikesh Phone number 919.291-5517 Date 4/8/2008 Drainage area number Pond #5 II.~D~SI N-INFORMATION' ~ .. - ~. „, '-, k - . y. ,. ,, .. _ ,. . ., . Site Characteristics Drainage area 661,148 ft~ Impervious area 264,459 ftz impervious 40 Design rainfall depth 3.2 in Storage Volume: Non•SR Waters Minimum volume required 22,592 ft3 Volume provided 25,210 ft3 Storage Volume: SR Waters 1-yr, 24-hr runoff depth in Pre-development 1-yr, 24-hr runoff ft3 Post-development t-yr, 24-hr runoff ff3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is pre/post control of the 1-yr 24-hr peak flow required? Y (Y or N) 1 •yr, 24-hr rainfall depth 3.2 in Rational C, pre-development 65.0 (unitless) Rational C, post-development 76.0 (unitless) Rainfall intensity: 1-yr, 24•hr storm N/A in/hr Pre-development 1-yr, 24-hr peak flow 4.3 ft3/sec Post-development 1 •yr, 24-hr peak flow 11.0 ft3/sec PrelPost 1-yr, 24-hr peak flow control 6.8 ft3/sec Basin Elevations Basin bottom elevation 237.00 Sediment cleanout elevation 238.00 Bottom of shelf elevation 241.50 Permanent pool elevation 242.00 Top of shelf elevation 242.50 Temporary pool elevation 245.00 Volume and Surface Area Calculations SA/DA ratio 1.25 (unitless) Surface area at the bottom of shelf 4409.00 ft~ Volume at the bottom of shelf 12850.00 ft3 Permanent pool, surface area required 8,266 ft2 Permanent pool, surface area provided 8,364 fiz OK Permanent pool volume 25,210 ft3 Average depth for SA/DA tables 3.014108082 ft OK Surface area at the top of shelf 10,306 ft2 Volume at the top of shelf 29431 ft3 Form SW401-Wet Detention Basin-F{ev.3 Parts I. & II. Design Summary, Page 1 of 2 Permit (to be provided by DWO) II. DESIGN INFORMATION Forebay volume 5,079 ft3 Forebay °o of permanent pool volume 20 % OK Temporary pool, surface area provided 14,200 ft~ Drawdown Calculations Treatment volume drawdown time 4.9 days OK Treatment volume discharge rate 1.57 ft3/s Pre-development 1-yr, 24-hr discharge 4.28 ft3/s OK Post•development 1-yr, 24-hr discharge 1.57 ft3/s OK Additional Information Diameter of orifice 2.00 in Design TSS removal 85 Basin side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 3 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1 ft OK Vegetated filter provided? Y (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies Yes Form SW401-Wet Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 2 of 2 ~~ ~~~ O~O~ VJAJFROG ti r _ ~.,.....~ NCDENR ~ G `" ` STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FIL TER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part ill) must be printed, filled out and submitted along with all of the required information. I. PiiOJEC7INFORMATION „ <,., .. .. .~ , . -' ~ .. ; ... Project name Summerwinds Plantation Contact name Mr. Ron Mikesh Phone number 919-291.5517 Date April 8, 2008 Drainage area number Pond #5 II..-D~$I 1~1F MITI ~R ~ - ~ ` - ~ ~.. ~ _ ~ .. : , , .. . For Level Spreaders Receiving Flow From a BMP Type of BMP Wet Detention Drawdown flow from the BMP 7.09 cfs For Level Spreaders Receiving Flow from the Drainage Area Do not complete this section of the worksheet. Drainage area ftz Impervious surface area ft2 Percent impervious Do not complete this section of the worksheet. Rational C coefficient Do not complete this section of the worksheet. Peak flow from the 1 in/hr storm cfs Do not complete this section of the worksheet. Time of concentration min Rainfall intensity, 10-yr storm in/hr Do not complete this section of the worksheet. Peak flow from the 10-yr storm cfs Do not complete this section of the worksheet. Where Does the Level Spreader Discharge? To a bioretention cell? N (Y or N) To a wetland? N (Y or N) To a filter strip or riparian buffer? Y (Y or N) Please complete filter strip characterization below. Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass ft Width of dense ground cover 50 ft Width of wooded vegetation ft Total width 50 ft Slope (from level lip to to top of bank) 8 Are any draws present? N (Y or N) OK Level Spreader Design Forebay surface area None sq ft OK Feet of level lip needed per cfs 13 fUcfs Answer "Y" to one of the following: Length based on the 1 in/hr storm? None (Y or N) Length based on the 10-yr, 24-hr storm? None (Y or N) Length based on the BMP discharge rate? Y (Y or N) Design flow 7.09 cfs Is a bypass device provided? Y (Y or N) OK Length of the level lip 93 ft Are level spreaders in series? None (Y or N) #VALUE! Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.3 Parts I. and II. Design Summary, page t of 2 Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? N (Y or N) Does the channel enter the stream at an angle? Y Dimensions of the channel (see diagram below): M ft 8 ft W ft Y ft Peak velocity in the channel during the 10-yr, 24-hr storm cfs Channel lining material PSRM u, ,,,~ I ~------------- y M i B i ---i I M Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.3 Parts I. and II. Design Summary. page 2 of 2 3S Pre-Dev. Wet Pond #5 1S ost-Dev Subcat Reach on Link Wet Pond #5- 04_07_08 Prepared by {enter your company name here} Page 2 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Area Listing (all nodes) Area (acres) CN Description (subcatsl 9.110 61 Managed Open Space (1 S) 15.180 65 Woods/grass comb., Fair, HSG B (3S) 6.070 98 Roads, Houses, & Driveways (1S) 30.360 Wet Pond #5- 04_07_08 Type 11 24-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 3 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Time span=1.00-144.00 hrs, dt=0.50 hrs, 287 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method -Pond routing by Stor-Ind method Subcatchment 1S: Post-Dev. Runoff Area=15.180 ac Runoff Depth=1.15" Tc=20.0 min CN=76 Runoff=11.04 cfs 1.457 of Subcatchment 3S: Pre-Dev. Runoff Area=15.180 ac Runoff Depth=0.60" Flow Length=866' Tc=27.1 min CN=65 Runoff=4.28 cfs 0.759 of Pond 2P: Wet Pond #5 Peak Elev=245.04' Storage=36,440 cf Inflow=11.04 cfs 1.457 of Primary=1.57 cfs 1.451 of Secondary=0.00 cfs 0.000 of Outflow=1.57 cfs 1.451 of Total Runoff Area = 30.360 ac Runoff Volume = 2.217 of Average Runoff Depth = 0.88" 80.01% Pervious Area = 24.290 ac 19.99% Impervious Area = 6.070 ac Wet Pond #5- 04_07_08 Type 11 24-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 4 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Subcatchment 1 S: Post-Dev. Post-Development Inflow to Pond #5 Drainage Area = 6.6 Acres Impervious = 40% [49] Hint: Tc<2dt may require smaller dt Runoff = 11.04 cfs Q 12.11 hrs, Volume= 1.457 af, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Time Span= 1.00-144.00 hrs, dt= 0.50 hrs Type II 24-hr 1-Yr. 24-Hr. Rainfall=3.20" Area (acl CN Description 6.070 98 Roads, Houses, & Driveways 9.110 61 Managed Open Space 15.180 76 Weighted Average 9.110 Pervious Area 6.070 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, Direct Subcatchment 1 S: Post-Dev. Hydrograph 12 11.04 cfs 11 Type II; 24-hlr 1-Yr. 2~-Hr, ,o Rainfall=3.20•' 9 Runoff Area=15.180 ac 8 Runoff Volume1.4~7 of 7 Runoff Depth=#.15" 3 6 ~° Tc=20.O m i n 5 4 CN=76 1 ^ Runoft 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100105110115120125130135140 Time (hours) Wet Pond #5- 04_07_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 5 HydroCADO 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Subcatchment 3S: Pre-Dev. Pre-Development Inflow to Pond #5 Drainage Area = 15.18 Acres [49] Hint: Tc<2dt may require smaller dt Runoff = 4.28 cfs Q 12.46 hrs, Volume= 0.759 af, Depth= 0.60" Runoff by SCS TR-20 method, UH=SCS, Time Span= 1.00-144.00 hrs, dt= 0.50 hrs Type II 24-hr 1-Yr. 24-Hr. Rainfall=3.20" Area (ac) CN Description 15.180 65 Woods/grass comb., Fair HSG B 15.180 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.3 150 0.0670 0.14 Sheet Flow, Overland Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.20" 8.8 716 0.0740 1.36 Shallow Concentrated Flow, Shallow Concentrated Flow Woodland Kv= 5.0 fps 27.1 866 Total Subcatchment 3S: Pre-Dev. Hydrograph 4.28 CIs Type II 24-hr #-Yr. 24-Hr 4 Rainfa11~3.20" Runoff Area=15.180 ac 3 F~unoff Volume=0.759 of Runoff Depth=0.60' 2 ~ Flow Length=866' Tc=27.1 min CN=65 1 ^ Runoff 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100105110115120125130135140 Ttme (hours) Wet Pond #5- 04_07_08 Type 11 24-hr 1-Yr. 24-Hr. Rainfall-3.20" Prepared by {enter your company name here} Page 6 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Pond 2P: Wet Pond #5 Inflow Area = 15.180 ac, Inflow Depth = 1.15" for 1-Yr. 24-Hr. event Inflow = 11.04 cfs @ 12.11 hrs, Volume= 1.457 of Outflow = 1.57 cfs @ 13.91 hrs, Volume= 1.451 af, Atten= 86%, Lag= 108.1 min Primary = 1.57 cfs @ 13.91 hrs, Volume= 1.451 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-144.00 hrs, dt= 0.50 hrs Peak Elev= 245.04' @ 13.91 hrs Surf.Area= 14,259 sf Storage= 36,440 cf Plug-Flow detention time= 1,628.9 min calculated for 1.451 of (100% of inflow) Center-of-Mass det. time= 1,626.0 min (2,490.5 - 864.6 ) V_ olume Invert Avail.Storage Storage Description #1 242.00' 69,070 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 242.00 8, 364 0 0 242.50 10,306 4,668 4,668 243.00 11, 547 5, 463 10,131 244.00 12, 845 12,196 22, 327 245.00 14,200 13,523 35,849 246.00 15,610 14,905 50,754 247.00 17,077 16,344 67,098 247.10 22, 376 1, 973 69, 070 Device Routing Invert Outlet Devices #1 Primary 237.00' 18.0" x 227.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 230.00' S= 0.0308 '/' Cc= 0.900 n= 0.024 #2 Device 1 242.00' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 245.00' 0.27' x 0.83' Horiz. Overflow Grate w/Open Slots X 4.00 columns X 5 rows Limited to weir flow C= 0.600 #4 Secondary 246.00' 16.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=1.34 cfs @ 13.91 hrs HW=245.04' (Free Discharge) L1=Culvert (Passes 1.34 cfs of 13.19 cfs potential flow) ~2=Orifice/Grate (Orifice Controls 0.18 cfs @ 8.28 fps) 3=Overflow Grate w/Open Slots (Weir Controls 1.16 cfs @ 0.65 fps) econdary OutFlow Max=0.00 cfs @ 1.00 hrs HW=242.00' (Free Discharge) =Broad-Crested Rectangular Weir (Controls 0.00 cfs) Wet Pond #5- 04_07_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 7 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Pond 2P: Wet Pond #5 Hydrograph 12 ,o 9 N V O LL Inflow Area=15.180 ac Peak Elev=245.04' Storage=36,440 cf ^ Inflow ^ Outflow ®Primary ^ Seconds ry 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Time (hours) Wet Pond #5- 04_07_08 Type Il 24-hr First Flush Rainfall=3.60" Prepared by {enter your company name here} Page 8 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Time span=1.00-144.00 hrs, dt=0.50 hrs, 287 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method -Pond routing by Stor-Ind method Subcatchment 1 S: Post-Dev. Runoff Area=15.180 ac Runoff Depth=1.44" Tc=20.0 min CN=76 Runoff=14.21 cfs 1.819 of Subcatchment 3S: Pre-Dev. Runoff Area=15.180 ac Runoff Depth=0.81" Flow Length=866' Tc=27.1 min CN=65 Runoff=6.00 cfs 1.018 of Pond 2P: Wet Pond #5 Peak Elev=245.14' Storage=37,780 cf Inflow=14.21 cfs 1.819 of Primary=7.09 cfs 1.813 of Secondary=0.00 cfs 0.000 of Outflow=7.09 cfs 1.813 of Total Runoff Area = 30.360 ac Runoff Volume = 2.838 of Average Runoff Depth =1.12" 80.01% Pervious Area = 24.290 ac 19.99% Impervious Area = 6.070 ac Wet Pond #5- 04_07_08 Type 11 24-hr First Flush Rainfall=3.60" Prepared by {enter your company name here} Page 9 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Subcatchment 1 S: Post-Dev. Post-Development Inflow to Pond #5 Drainage Area = 6.6 Acres Impervious = 40% [49] Hint: Tc<2dt may require smaller dt Runoff = 14.21 cfs @ 12.10 hrs, Volume= 1.819 af, Depth= 1.44" Runoff by SCS TR-20 method, UH=SCS, Time Span= 1.00-144.00 hrs, dt= 0.50 hrs Type II 24-hr First Flush Rainfall=3.60" Area (act CN Description 6.070 98 Roads, Houses, & Driveways 9.110 61 Managed Open Space 15.180 76 Weighted Average 9.110 Pervious Area 6.070 Impervious Area Tc Length Slope Velocity Capacity Description _(min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, Direct Subcatchment 1 S: Post-Dev. 1E ,q ie ,a N 0 LL Hydrograph 14.21 cfs Type .1.124-hr First Flush Rainfall=3.60•• Runoff Area_15.180 ac Runoff Volume=l.8~ 9 gat Runoff Depth-1.44" Tc=20.0 min CN=76 ^ Runoff 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100105110115120125130135140 Tlme (hours) Wet Pond #5- 04_07_08 Type 11 24-hr First Flush Rainfall=3.60" Prepared by {enter your company name here} Page 10 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Subcatchment 3S: Pre-Dev. Pre-Development Inflow to Pond #5 Drainage Area = 15.18 Acres [49] Hint: Tc<2dt may require smaller dt Runoff = 6.00 cfs @ 12.44 hrs, Volume= 1.018 af, Depth= 0.81" Runoff by SCS TR-20 method, UH=SCS, Time Span= 1.00-144.00 hrs, dt= 0.50 hrs Type II 24-hr First Flush Rainfall=3.60" Area (ac) CN Description 15.180 65 Woods/grass comb., Fair, HSG B 15.180 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.3 150 0.0670 0.14 Sheet Flow, Overland Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.20" 8.8 716 0.0740 1.36 Shallow Concentrated Flow, Shallow Concentrated Flow Woodland Kv= 5.0 fns 27.1 866 Total Subcatchment 3S: Pre-Dev. Hydrograph N 3 0 LL 1 6.00 cfs :Type II 24-hlr First.... F~ust~ Railnfa11~360" Runoff Area=15.180 ac Runoff Volume=1.0~8:af Runoff Depth~0.81 Flow Length-866' Tc=27.1 m i n CN=65 ^ Runoff 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 BO 85 90 95 100105110115120125130135140 Time (hours) Wet Pond #5- 04_07_08 Type 11 24-hr First Flush Rainfall=3.60'' Prepared by {enter your company name here} Page 11 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/8/2008 Pond 2P: Wet Pond #5 Inflow Area = 15.180 ac, Inflow Depth = 1.44" for First Flush event Inflow = 14.21 cfs @ 12.10 hrs, Volume= 1.819 of Outflow = 7.09 cfs @ 13.00 hrs, Volume= 1.813 af, Atten= 50%, Lag= 54.0 min Primary = 7.09 cfs @ 13.00 hrs, Volume= 1.813 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-144.00 hrs, dt= 0.50 hrs Peak Elev= 245.14' @ 13.00 hrs Surf.Area= 14,390 sf Storage= 37,780 cf Plug-Flow detention time= 1,292.0 min calculated for 1.807 of (99% of inflow) Center-of-Mass det. time= 1,308.2 min (2,166.2 - 857.9 ) Volume Invert Avail.Storage Storage Description #1 242.00' 69,070 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 242.00 8, 364 0 0 242.50 10,306 4,668 4,668 243.00 11,547 5,463 10,131 244.00 12,845 12,196 22,327 245.00 14,200 13,523 35,849 246.00 15, 610 14, 905 50, 754 247.00 17,077 16,344 67,098 247.10 22, 376 1, 973 69, 070 Device Routing Invert Outlet Devices #1 Primary 237.00' 18.0" x 227.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 230.00' S= 0.0308 '/' Cc= 0.900 n= 0.024 #2 Device 1 242.00' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 245.00' 0.27' x 0.83' Horiz. Overflow Grate w/Open Slots X 4.00 columns X 5 rows Limited to weir flow C= 0.600 #4 Secondary 246.00' 16.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=7.33 cfs @ 13.00 hrs HW=245.14' (Free Discharge) L =Culvert (Passes 7.33 cfs of 13.24 cfs potential flow) ~2_Orifice/Grate (Orifice Controls 0.18 cfs @ 8.41 fps) 3_Overflow Grate w/ Open Slots (Weir Controls 7.14 cfs @ 1.20 fps) econdary OutFlow Max=0.00 cfs @ 1.00 hrs HW=242.00' (Free Discharge) =Broad-Crested Rectangular Weir (Controls 0.00 cfs) Wet Pond #5- 04_07_08 Type 11 24-hr First Flush Rainfall=3.60" Prepared by {enter your company name here} Page 12 HydroCAD® 8.00 s/n 004959 ©2006 HVdroCAD Software Solutions LLC 4/8/2008 Pond 2P: Wet Pond #5 Hydrograph ^ Inflow ~ Outflow ® Primary [~ Secondary H V 3 O LL 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Time (hours) ~.z4 ~ I / ~ ~ ~ I I ~ ~ ~ -~ ~ 1 I I T~ ~ ~ ~ >~ y~ ~, ~ ' ', I i ~ ~ ~~~ ~'~\ ~~,A ~ I , I it ~ -- -- , , I, ' I ~~ ~, ~` ~ ~~~, ~ ~ l 1 I ~~` , << < \~v~ 1 ~ i l , ~ \\o , V ~~ yy \ ,\ \ \ ~ ~ ~ ~ 1 h I I !, t ~~ `~ ~ ~ 1 ~ ~ ~~ ~~~ ~ \~ ~\v \~~ ~n~ I~I ~~~\ \ .~ ~ \, A\ „~ ~~ ~I i ~ ~, ~ \ ~ \\, Gi` ~~VAA ~~~~~ ,A\V\~AV~,,~` ~A l~, t ~ I ~ ~~~ ~~\~ ~ \\ ,\~~~~,, .III III i ~ ~ ,~ ~`+~\ ~~~ \ ~~ \ ~ \\ VA ~ I ~~ ~ I l ~~ i ~ ~ A \ \ ~ I A ,~ I A ~ I V \ \~ ~ " ;~ ~~ I I I I ~ ~ ~ bJ ~ ~ l i 1 ~ I ~ ~ ,~ I .;. I ~ ~ ~~ \ \ 1 ~ I Ili ~~ I ~ ~~ ~ ~~~ i i~ I ~ I~ I, ~ \ ~ ~ I i ~ i i~~ ~ ~ i i l ~~ iy ~ ~ ~ ~i .~ \ i I ~ i ~ ~i~~ i~ i ;I 1 .11 \ '~, ~ ', I ~ ~ , ~ 1 ~, v ~ \ 1 V ' V \ s ."~ ~ ~ \wE ''~~° ~ ~~ ~ ', o ~ I \ ~ \~~~~,\A, v , y,A \V A~ \\ , ~ ,~ _~_ ~ r -~\~ ~, ~, ,A Vv ~ A ~ \\ V ~ \\ ~ ~ - ~ ,, ~ i Z ~ ~. ~ ~ ~ I ~ 1 V ~ ~ ~ ~ ~ ~ ~~ I' Illl i II III II t ~ I ~~ ~ \ v , A \ \ ~ ~, A ~, .~ ~ `~ ~ ~ ~~ ~~ ~~ ~~ ~~ ~ ~ ~~, ~ ~`;`'~ ~f~ll ~~illl it ~ I \ V~ ; ~ ,~A V'y \ \ \ v` v ~~ ~ ~~ A , , ~~~ ~ ', ~, ~~~; ~ ~ u ~ 1 ~ ~ ~~ ~~ ~ ~ ~ ~ ~ / A~ ~ ~ , ~ f,l` ~ ~ Permit Number_________ Ito be provided by DWq) c'~F WATFh,O ~~ O G ~ 9 ,...r. ~ > NCDENR ° ~ ~~ STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all the required information. I. PRbJECT INFORMATION Project name Summerwinds Plantation Contact name Mr. Ron Mikesh Phone number 919-291-5517 Date April 7, 2008 Drainage area number Stormwater Wetland #3 ~,, ,~ U. DESIGN INFORMATiQN ~ ``~ `~ . ~. ~ ~.- a. „ ,-r~' ~.. ~~ ~~' ~,,~, Site Characteristics Drainage area 467,643.00 ff2 Impervious area 187,057.20 ft2 Percent impervious 40.0% Design rainfall depth 1.00 inch Peak Flow Calculations 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Pre/Post 1-yr, 24-hr peak control Storage Volume: Non-SR Waters Design volume (temporary pool volume) Depth of temporary pool/ponding depth (DP,a~s) Drawdown time Diameter of orifice Coefficient of discharge (Cp) used in orifice diameter calculation Driving head (H°) used in the orifice diameter calculation Storage Volume: SR Waters Parameters 1-yr, 24-hr depth Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided 3.20 in N/A in/hr 5.77 ft3/sec 13.23 ft3/sec 7.46 ft3/sec 9,421.00 ft3 OK 12.00 in OK 2.00 days OK 3.00 in 0.60 (unitless) 0.66 ft in ft3 ft3 :.3 ft3 Drawdown orifice diameter may be insufficient. Please provide adequate supporting calculations. OK Form SW401-Wetland-Rev.2 Parts I and II. Project Design Summary, Page 1 of 3 Permit Number_ ___ (to be provided by OWO) Surface Areas of Wetland Zones Surface Area of Entire Wetland Shallow Land The shallow land percentage is: Shallow Water The shallow water percentage is: Deep Pool Forebay portion of deep pool (pretreatment) The Forebay surface area percentage is: Non-Forebay portion of deep pool The non-forebay deep pool surface area percentage is: 16,059.00 ft` 6,200.00 ft2 0.39 °~° 6,599.00 ftZ 0.41 °,o 1,660.00 ft` 0.10 °io 1,600.00 ft2 0.10 °'° 16,059.00 ft2 0.00 ft2 OK OK OK OK OK OK Total of wetland zone areas Add or subtract the following area from the zones Topographic Zone Elevations Temporary Pool Shallow Land (top) Permanent Pool Shallow Water (top) Deep Pool (top) Most shallow point of deep pool's bottom Deepest point of deep pool's bottom Design must meet one of the following two options: This design meets Option #1, Deep pool is 6+inches below SLWT, If yes: SLWT (Seasonally Low Water Table) This design meets Option #2, Has a clay liner If yes: Depth of topsoil above clay liner Topographic Zone Depths Temporary Pool Shallow Land Permanent Pool Shallow Water Deep Pool (shallowest) Deep Pool (deepest) Planting Plan Are cattails included in the planting plan? Number of Plants in planting plan recommended: Herbacious (4'inch diameter) Shrubs/small trees (1 gallon or larger) Trees (1.5° dbh) Number of Plants in planting plan provided (several species of each plant type are recommended): Herbacious (4`inch diameter) Shrubs/small trees (1 gallon or larger) Trees (2.5" dbh) 270.00 fmsl 269.00 fmsl 268.50 imsl 267.00 fmsl 266.00 fmsl (Y or N) fmsl Y 6.00 in 12.00 in OK 6.00 in OK 18.00 in OK 30.00 in OK N (Y or N) OK 486 324 81 Form SW401-Wetland-f~ev.2 Parts I and II. Project Design Summary, Page 2 of 3 Permit Number__ _ jto be provided by DWO) Additional Information Can the design volume be contained? Y (Y or N) OK Does volume in excess of the design volume flow evenly distributed through a vegetated filter? Y (Y or N) OK What is the length of the vegetated filter? 32.00 ft Are calculations for supporting the design volume provided in the application? Y (Y or N) OK Is BMP sized to handle all runoff from ultimate build-out? Y (Y or N) OK Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? Y (Y or N) OK The length to width ratio is: 1.85 :1 OK Approximate wetland length 178.00 ft Approximate wetland width 96.00 ft Approximate surface area using length and width provided 17, 2 088.00 ft This approx. surface area is within this number of square feet of the entire wetland surface area reported above: Will the wetland be stabilized within 14 days of construction? Y (Y or N) OK Form SW401-Wetland-Rev.2 Parts I and II. Project Design Summary, Page 3 of 3 ETHE.RILL 559 Jones Franklin Road, Suite I64 Raleigh, North Carolina 27606 Phone: 919-851-8077 Fax; 919-85]-8107 1209 Floral Parkway, Suite B Wilmington, North Carolina 28403 Phone:910-799-5682 Fax:910-799-5634 SliBJECT STe~r+w~se.a. ~./es/,~n„~~F3 PROJECT 5~-r+mGtw~~rds LOC,4TION PREPARED BY GSP DATE 4/ZfD6 STATION CHECKED BY DATE SHEET OF T rte/ A~.N,~ac AsE~~ lvp~bF3 SFr /o. 7sq~ ~Pa~vic~s '/. 40 Y. Ry wa, s./ GV,tTta. O~ /rn~ Voluble -._._ ~v.: 0.05+ D.oo91 t) ~ , 05 ~- • coe($o~ ~v. o. 4!o L,,,/r,... Vo%c. R~9'~~ ~iN ~ d. Wit.,/w. ,~t ~!' ~ /0.75ac /2'v O. 3(07 3 n c F-r ~~0i o0 o Fy- _ Sc.~QCC Ansa /2 et'a~ r Qv ~! ~G oo~o ~r 3 __, /Fs SA . /~ paa FT't' 3S 1S Pre-Dev. ost-Dev 2P Stormwater Wetland - #3 Subcat Reach1 on Link J Stormwater Wetland - #3_04_02_08 Prepared by {enter your company name here} Page 2 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Area Listing (all nodes) Area (acres) CN Description (subcats) 6.450 61 Managed Open Space (1S) 10.750 65 Woods/grass comb., Fair, HSG B (3S) 4.300 98 Roads, Houses, Driveways (1S) 21.500 Stormwater Wetland - #3_04_02_08 Type 11 24-hr 1 "Runoff Rainfall=2.00" Prepared by {enter your company name here} Page 3 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Time span=2.00-120.00 hrs, dt=0.05 hrs, 2361 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method -Pond routing by Stor-Ind method Subcatchment 1S: Post-Dev. Runoff Area=10.750 ac Runoff Depth=0.41" Tc=20.0 min CN=76 Runoff=4.07 cfs 0.371 of Subcatchment 3S: Pre-Dev. Runoff Area=10.750 ac Runoff Depth=0.14" Flow Length=525' Tc=19.4 min CN=65 Runoff=0.50 cfs 0.121 of Pond 2P: Stormwater Wetland - #3 Peak Elev=269.69' Storage=9,421 cf Inflow=4.07 cfs 0.371 of Primary=0.18 cfs 0.369 of Secondary=0.00 cfs 0.000 of Outflow=0.18 cfs 0.369 of Total Runoff Area = 21.500 ac Runoff Volume = 0.492 of Average Runoff Depth = 0.27" 80.00% Pervious Area =17.200 ac 20.00% Impervious Area = 4.300 ac Stormwater Wetland - #3_04_02_08 Type 11 24-hr 1 "Runoff Rainfall-2.00" Prepared by {enter your company name here} Page 4 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Subcatchment 1 S: Post-Dev. Post-Development Inflow to Pond #3 Drainage Area = 10.75 Acres °% Impervious = 40% Runoff = 4.07 cfs Q 12.16 hrs, Volume= 0.371 af, Depth= 0.41" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1" Runoff Rainfall=2.00" Area (act CN Descriotion 4.300 98 Roads, Houses, Driveways 6.450 61 Managed Open Space 10.750 76 Weighted Average 6.450 Pervious Area 4.300 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, Tc from Storm Drain Calculations Subcatchment 1 S: Post-Dev. Hydrograph ® Runoff Vl 3 0 LL Type 11 24-hr 1" Runoff Rainfall=2.00..." Runoff Area=10.750 ac Runoff Volume=0.371 of Runoff Depth-0.:41 " Tc=20.0 min CN-76 o 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland - #3_04_02_08 Type 11 24-hr 1 "Runoff Rainfall=2.00" Prepared by {enter your company name here} Page 5 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Subcatchment 3S: Pre-Dev. Post-Development Inflow to Pond #3 Drainage Area = 10.75 Acres °i° Impervious = 40% Runoff = 0.50 cfs @ 12.24 hrs, Volume= 0.121 af, Depth= 0.14" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1" Runoff Rainfall=2.00" Area (ac) CN Description 10.750 65 Woods/grass comb., Fair, HSG B 10.750 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.8 150 0.1133 0.17 Sheet Flow, Overland Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.20" 4.6 375 0.0750 1.37 Shallow Concentrated Flow, Shallow Concentrated Flow Woodland Kv= 5.0 fqs 19.4 525 Total Subcatchment 3S: Pre-Dev. Hydrograph °. 0~5 Type II ~4-hlr 1 " Runoff 0.45 Rainfall=2.00." °~4 Runoff Area=10.750 ac °.35 ~ Rlunoff Volume-0.121 of °.3 ~ Runoff Depth_0.14" 3 LL 0.25. ~ Flow Length=525' °.2 Tc=19.4 min 0.15 CN=65 0.1 ' ® Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland - #3_04_02_08 Type 11 24-hr 1 "Runoff Rainfall=2.00" Prepared by {enter your company name here} Page 6 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetland - #3 Inflow Area = 10.750 ac, Inflow Depth = 0.41" for 1" Runoff event Inflow = 4.07 cfs @ 12.16 hrs, Volume= 0.371 of Outflow = 0.18 cfs @ 18.71 hrs, Volume= 0.369 af, Atten= 96%, Lag= 393.4 min Primary = 0.18 cfs @ 18.71 hrs, Volume= 0.369 of Secondary = 0.00 cfs @ 2.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 269.69' @ 18.71 hrs Surf.Area= 16,985 sf Storage= 9,421 cf Plug-Flow detention time= 778.5 min calculated for 0.369 of (100% of inflow) Center-of-Mass det. time= 776.0 min (1,675.6 - 899.6 ) Volume Invert Avail.Storage Storage Description #1 269.00' 80,824 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) 269.00 9,600 789.0 0 0 9,600 269.50 16,059 494.0 6,346 6,346 39,721 270.00 18,606 525.0 8,658 15,004 42,247 271.00 20,210 544.0 19,402 34,407 43,950 272.00 21, 870 563.0 21, 035 55, 441 45, 713 273.00 23,587 582.0 22,723 78,164 47,536 273.10 29,718 645.0 2,659 80,824 53,688 Device Routing Invert Outlet Devices #1 Primary 265.00' 18.0" x 60.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 259.00' S= 0.1000 '/' Cc= 0.900 n= 0.024 #2 Device 1 269.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 270.00' 36.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 271.00' 20.0' long Sharp-Crested Rectangular Weir 2 E nd Contraction(s) Primary OutFlow Max=0.18 cfs @ 18.71 hrs HW=269.69' (Free Discharge) L =Culvert (Passes 0.18 cfs of 16.88 cfs potential flow) ~2_Orifice/Grate (Orifice Controls 0.18 cfs @ 3.61 fps) 3-Orifice/Grate (Controls 0.00 cfs) econdary OutFlow Max=0.00 cfs @ 2.00 hrs HW=269.00' (Free Discharge) =Sharp-Crested Rectangular Weir (Controls 0.00 cfs) Stormwater Wetiand - #3_04_02_08 Type lI 24-hr i " Runoff Rainfall=2.00" Prepared by {enter your company name here} Page 7 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetiand - #3 Hydrograph ^ Inflow L7 Outflow ~ Primary L7 Secondary N V O LL 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 65 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland - #3_04_02_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 8 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Time span=2.00-120.00 hrs, dt=0.05 hrs, 2361 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method -Pond routing by Stor-Ind method Subcatchment 1S: Post-Dev. Runoff Area=10.750 ac Runoff Depth=1.15" Tc=20.0 min CN=76 Runoff=13.23 cfs 1.032 of Subcatchment 3S: Pre-Dev. Runoff Area=10.750 ac Runoff Depth=0.60" Flow Length=525' Tc=19.4 min CN=65 Runoff=5.77 cfs 0.538 of Pond 2P: Stormwater Wetland - #3 Peak Elev=270.21' Storage=18,855 cf Inflow=13.23 cfs 1.032 of Primary=3.12 cfs 1.030 of Secondary=0.00 cfs 0.000 of Outflow=3.12 cfs 1.030 of Total Runoff Area = 21.500 ac Runoff Volume =1.570 of Average Runoff Depth = 0.88" 80.00% Pervious Area = 17.200 ac 20.00% Impervious Area = 4.300 ac Stormwater Wetland - #3_04_02_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 9 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Subcatchment 1S: Post-Dev. Post-Development Inflow to Pond #3 Drainage Area = 10.75 Acres Impervious = 40% Runoff = 13.23 cfs C~ 12.14 hrs, Volume= 1.032 af, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Yr. 24-Hr. Rainfall=3.20" Area (ac) CN Descriotion 4.300 98 Roads, Houses, Driveways 6.450 61 Managed Open Space 10.750 76 Weighted Average 6.450 Pervious Area 4.300 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, Tc from Storm Drain Calculations Subcatchment 1S: Post-Dev. Hydrograph 14 13.23 cfs ,3 ~~ Type 11.24-hr 1-Yr. 24-Hr. 12 Rainfa11~3.20" 10 ~ ~ Runoff Ar~a~10.750 ac 9 , Runoff Volume-1.b32 of v g y Runoff Depth=1.15" LL ° ' Tc=20:0 m i n 6 ` ~' CN~76 5 1 f8 Runoff 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland - #3_04_02_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 10 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Subcatchment 3S: Pre-Dev. Post-Development Inflow to Pond #3 Drainage Area = 10.75 Acres Impervious = 40% Runoff = 5,77 cfs @ 12.16 hrs, Volume= 0.538 af, Depth= 0.60" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Yr. 24-Hr. Rainfall=3.20" Area (ac) CN Description 10.750 65 Woods/grass comb,, Fair, HSG B 10.750 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.8 150 0.1133 0.17 Sheet Flow, Overland Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.20" 4.6 375 0.0750 1.37 Shallow Concentrated Flow, Shallow Concentrated Flow Woodland Kv= 5.0 fps 19.4 525 Total Subcatchment 3S: Pre-Dev. Hydrograph ® Runoff N ° LL Type 1124-hr 1-Yr. 24-Hr. Rainfa11~3.20" Runoff Area=10.750 ac Runoff Volume=0.538 of :Runoff. Depth-0.60'' Flow Length=525' Tc=19.4 min CN-65 o 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Tlme (hours) Stormwater Wetland - #3_04_02_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 11 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetland - #3 Inflow Area = 10.750 ac, Inflow Depth = 1.15" for 1-Yr. 24-Hr. event Inflow = 13.23 cfs @ 12.14 hrs, Volume= 1.032 of Outflow = 3.12 cfs @ 12.61 hrs, Volume= 1.030 af, Atten= 76%, Lag= 28.1 min Primary = 3.12 cfs @ 12.61 hrs, Volume= 1.030 of Secondary = 0.00 cfs @ 2.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 270.21' @ 12.61 hrs Surf.Area= 18,930 sf Storage= 18,855 cf Plug-Flow detention time= 536.6 min calculated for 1.029 of (100% of inflow) Center-of-Mass det. time= 537.4 min (1,402.6 - 865.2 ) Volume Invert Avail.Storage Storage Description #1 269.00' 80,824 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) 269.00 9,600 789.0 0 0 9,600 269.50 16,059 494.0 6,346 6,346 39,721 270.00 18,606 525.0 8,658 15,004 42,247 271.00 20,210 544.0 19,402 34,407 43,950 272.00 21,870 563.0 21,035 55,441 45,713 273.00 23, 587 582.0 22, 723 78,164 47, 536 273.10 29,718 645.0 2,659 80,824 53,688 Device Routing Invert Outlet Devices #1 Primary 265.00' 18.0" x 60.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 259.00' S= 0.1000'/' Cc= 0.900 n= 0.024 #2 Device 1 269.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 270.00' 36.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 271.00' 20.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=3.10 cfs @ 12.61 hrs HW=270.20' (Free Discharge) L =Culvert (Passes 3.10 cfs of 17.96 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.25 cfs @ 5.00 fps) 3-Orifice/Grate (Weir Controls 2.86 cfs @ 1.48 fps) econdary OutFlow Max=0.00 cfs @ 2.00 hrs HW=269.00' (Free Discharge) =Sharp-Crested Rectangular Weir (Controls 0.00 cfs) Stormwater Wetland - #3_04_02_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 12 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetland - #3 Hydrograph 13.23 cfs Inflow Area=10.750 ac 14- Peak ~lev=270.21' 13 ,2 Storage=18,855 cf 11 10 N , 8 0 7 LL 3.12 cfs 3.72 cfs ..r ~/ ~ ^ Inflow Outflow t~! Primary ^ Secondary 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland - #3_04_02_08 Type 11 24-hr 100-Yr. 24-Hr. Rainfall=8.40" Prepared by {enter your company name here} Page 13 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Time span=2.00-120.00 hrs, dt=0.05 hrs, 2361 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method -Pond routing by Stor-Ind method Subcatchment 1S: Post-Dev. Runoff Area=10.750 ac Runoff Depth=5.52" Tc=20.0 min CN=76 Runoff=65.31 cfs 4.948 of Subcatchment 3S: Pre-Dev. Runoff Area=10.750 ac Runoff Depth=4.22" Flow Length=525' Tc=19.4 min CN=65 Runoff=51.00 cfs 3.780 of Pond 2P: Stormwater Wetland - #3 Peak Elev=271.66' Storage=48,119 cf Inflow=65.31 cfs 4.948 of Primary=20.69 cfs 4.109 of Secondary=34.89 cfs 0.836 of Outflow=55.57 cfs 4.946 of Total Runoff Area = 21.500 ac Runoff Volume = 8.728 of Average Runoff Depth = 4.87" 80.00% Pervious Area = 17.200 ac 20.00% Impervious Area = 4.300 ac Stormwater Wetland - #3_04_02_08 Type 1124-hr 100-Yr. 24-Hr. Rainfall=8.40' Prepared by {enter your company name here} Page 14 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Subcatchment 1 S: Post-Dev. Post-Development Inflow to Pond #3 Drainage Area = 10.75 Acres Impervious = 40% Runoff = 65.31 cfs @ 12.12 hrs, Volume= 4.948 af, Depth= 5.52" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Yr. 24-Hr. Rainfall=8.40" Area (ac) CN Description 4.300 98 Roads, Houses, Driveways 6.450 61 Managed Open Space 10.750 76 Weighted Average 6.450 Pervious Area 4.300 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, Tc from Storm Drain Calculations Subcatchment 1 S: Post-Dev. Hydrograph ~ Runoif °° Type; II 24-hr 1 QO-Yr. 24-Hr. so ~ s Rainfall-8.40" 55 50 Runoff Area-10.75p ac 45 - Runoff Volume:-4:948 of 4o Y Runoff Depth=5.52" 35 Tc-20.0 m n LL 30 CN-76 ............... ... T,,, 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland - #3_04_02_08 Type 1124-hr 100-Yr. 24-Hr. Rainfall=8.40" Prepared by {enter your company name here} Page 15 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Subcatchment 3S: Pre-Dev. Post-Development Inflow to Pond #3 Drainage Area = 10.75 Acres Impervious = 40% Runoff = 51.00 cfs @ 12.12 hrs, Volume= 3.780 af, Depth= 4.22" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Yr. 24-Hr. Rainfall=8.40" Area (ac) CN Description 10.750 65 Woods/grass comb., Fair, HSG B 10.750 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.8 150 0.1133 0.17 Sheet Flow, Overland Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.20" 4.6 375 0.0750 1.37 Shallow Concentrated Flow, Shallow Concentrated Flow _ _ Woodland Kv= 5.0 fns 19.4 525 Total Subcatchment 3S: Pre-Dev. Hydrograph 55 si.oa ds 50 ~~ Type II 24-hr 100-Yr. 24-Hr. 45 s: Rainfall_8.4O" 40 Runoff Area=10.750 ac 35 Runoff Volume=3.780 of 3o Runoff Depth.-4.22" 3 Flow Length=525' tLL 25 Tc=19.4 min 20- CN=65 15 1 ® Runoff 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland - #3_04_02_08 Type 1124-hr 100-Yr. 24-Hr. Rainfall=8.40" Prepared by {enter your company name here} Page 16 ~roCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetland - #3 Inflow Area = 10.750 ac, Inflow Depth = 5.52" for 100-Yr. 24-Hr. event Inflow = 65.31 cfs @ 12.12 hrs, Volume= 4.948 of Outflow = 55.57 cfs @ 12.22 hrs, Volume= 4.946 af, Atten= 15%, Lag= 5.6 min Primary = 20.69 cfs @ 12.22 hrs, Volume= 4.109 of Secondary = 34.89 cfs @ 12.22 hrs, Volume= 0.836 of Routing by Stor-Ind method, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 271.66' @ 12.22 hrs Surf.Area= 21,299 sf Storage= 48,119 cf Plug-Flow detention time= 133.6 min calculated for 4.944 of (100% of inflow) Center-of-Mass det. time= 135.4 min (955.3 - 819.9 ) Volume Invert Avail.Storage Storage Description #1 269.00' 80,824 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq ft) 269.00 9,600 789.0 0 0 9,600 269.50 16, 059 494.0 6, 346 6, 346 39, 721 270.00 18,606 525.0 8,658 15,004 42,247 271.00 20,210 544.0 19,402 34,407 43,950 272.00 21, 870 563.0 21, 035 55, 441 45, 713 273.00 23,587 582.0 22,723 78,164 47,536 273.10 29, 718 645.0 2, 659 80, 824 53, 688 Device Routing Invert Outlet Devices #1 Primary 265.00' 18.0" x 60.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outle t Invert= 259.00' S= 0.1000 '/' Cc= 0.900 n= 0.024 #2 Device 1 269.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 270.00' 36.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 271.00' 20.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=20.67 cfs @ 12.22 hrs HW=271.65' (Free Discharge) L =Culvert (Inlet Controls 20.67 cfs @ 11.70 fps) ~2=Orifice/Grate (Passes < 0.38 cfs potential flow) 3-Orifice/Grate (Passes < 43.73 cfs potential flow) econdary OutFlow Max=34.15 cfs @ 12.22 hrs HW=271.65' (Free Discharge) =Sharp-Crested Rectangular Weir (Weir Controls 34.15 cfs @ 2.64 fps) Stormwater Wetland - #3_04_02_08 Type 1124-hr 100-Yr. 24-Hr. Rainfall=8.40" Prepared by {enter your company name here} Page 17 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetland - #3 Hydrograph ^ Inflow © Outflow ~ Primary Secondary N u 3 0 LL 5 to 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) .~ 4 ~~~~~8 ~~ ~ - /j/ - ti- - ~ _ _~~v\~ _ -~~~-- --_; =_--- -\~% \ \~* _ ~ ~ ~~ Iii !~l i ~~aa-_ ~ ~ ~_ ~ -~ ~~ v ~~ ~ ~ ~~~ ~~ '~ ~ -- - ~ ~'Ijl i ~``~ II~Ii111 C~~1'~i, ~~ yam, ~ ~ ~ 1% ~I /~ ~. ~ ~`~ . ~~ ~` ~ l l/ 11 11 / l ~ l~ ~ ~' ~ l ~ ~~ ~~l ~ v~ ~ / l~jl~ I . ~ ljlll ~ ~ lN~ ~~~~ll;/l I l/ / 1 i /~// ~ i ~ 1~1 '' -~ 1 / ~~'~j / ~ ~ 1. ~ ~' /~/ / / ~ / ~(1 ~~~ r ,~ I V j i 11 III ~ X/ /1~ ~ /~ ~~~~~~ I I 1 1 ~~/~ //, /l ll i ~~~ ~~-~w~ ,, I I 1 1111111 ~/~~~ ~~% ~~, ~~ j j I j j 1 11 11 IIIj ~~ ~ _ ~~ %~ ~~~ 9 I j j l ~ j ~ j I I I ~ I I I I I I I 111111111, ,~ / ~~~1 j ~i ~" ~~ ~~1~~ ~ jjl~l Ill ~~ /~j//lljlllllli ~I/~~~~ ~~ ~~ ~~~~~ ~1 I j 1 1 l / , / /~ //lj~l III 11~ ~4 ~ff~ ~ 1 ~ ~ ~ ~~ ~ ~ l / , l l l~ ~ t ; , ~~ ~~/ //// I ~ ~ ~ ~ Y 1 , _ ~ ~ lid, ,, 11 l/l~/l// /~ II ~~i~~//~ ~~I III ~~ ~ ~~==--~ ;' l ~ __ ~ -~ l i ~ ~ ~ ~i ! I' I ~ 1 I I i j ~ /~ ~ / // ~ ~ , I I ~ ~ , ~ ; 1'~ 1 afi I I r ~ ~ ~,~,~~ ~~~ III 1 ~ ~ I f \ \I I ~ 11 ~ 11~~~~ ~ ~1~1 ~l 1 ~ ~ l ~ 1~j~~ / II ~~~\~~~~~\ ~~ )jjl~ ~- ~ 111 `1\\\~ ICI I , I I I ~N~ ~~ ,,~~ ~\,~~,~v\~~ Ij I ~ I'. ,~ I 1 l; l i ' ~~ ~ i ~ ~~; >>>) ~ ~!;l ~ 1 Ij~li; ~ , ' ~~ ~ ~'I~y I~,I ' \\111111 ~~~,,\ ~ y , ~, ~k ~ ~,~,~ 1~ ~~1,'~A~ ~1,! ~ ~(//,%i,/j,/l/~~/ 1~ ~ ~ ~1~~*/~i'j~', ' ~~`~1,9~1~'llllll~~~~//,~,~ 1 , ~~ ~ ~ ~\ ~/ ~ ~ ~ ~ ~ Permit Number_________ ito be provided by DWQ) ~jO~F~~W A TE9 ~~~ OCOG ~~.,..- `- ~ r +rr~ ~ _ -, NCDENR ° STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This (orm must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all the required information. I. PROJECT INFORMATION Project name Summerwinds Plantation Contact name Mr. Ron Mikesh Phone number 919-291-5517 Date April 7, 2008 Drainage area number Stormwater Wetland #2 ,. R: _ • . , r . II.,.OESIC~N'INFORMATION~ , . ., .,; ., Site Characteristics Drainage area 696,960.00 ft2 Impervious area 230,868.00 ft2 Percent impervious 33.1% Design rainfall depth 1.00 inch Peak Flow Calculations 1-yr, 24-hr runoff depth 3.20 in 1-yr, 24-hr intensity N/A in/hr Pre-development 1-yr, 24-hr runoff 5.11 ft3/sec Post-development 1-yr, 24-hr runoff 16.31 ft3/sec Pre/Post 1-yr, 24-hr peak control 11.20 ft3/sec Storage Volume: Non-SR Waters Design volume (temporary pool volume) 11,506.00 ft3 Depth of temporary pool/ponding depth (DP,a~,s) 12.00 in Drawdown time 2.20 days Diameter of orifice 3.00 in Coefficient of discharge (Co) used in orifice diameter calculation 0.60 (unitless) Driving head (H°) used in the orifice diameter calculation 0.66 ft Storage Volume: SR Waters Parameters 1-yr, 24-hr depth in Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required (t3 Volume provided ft3 OK OK OK Drawdown orifice diameter may be insufficient. Please provide adequate supporting calculations. OK Form SW401-Wetland•Rev.2 Parts I and II. Project Design Summary, Page 1 of 3 Permit Number__________ Ito be provided by DWQ) Surface Areas of Wetland Zones Surface Area of Entire Wetland 20,220.00 ft` OK Shallow Land 8,039.00 ft` OK The shallow land percentage is: 0.40 °~ Shallow Water 8,165.00 ft2 OK The shallow water percentage is: 0.40 °o Deep Pool Forebay portion of deep pool (pretreatment) 2,313.00 ft2 OK The forebay surface area percentage is: 0.11 °~o Non-forebay portion of deep pool 1,703.00 ft2 OK The non-forebay deep pool surface area percentage is: 0.08 °o Total of wetland zone areas 20,220.00 ft2 OK Add or subtract the following area from the zones 0.00 ftz Topographic Zone Elevations Temporary Pool Shallow Land (top) 249.00 fmsl Permanent Pool Shallow Water (top) 248.00 fmsl Deep Pool (top) 247.50 fmsl Most shallow point of deep pool's bottom 246.00 fmsl Deepest point of deep pool's bottom 245.00 fmsl Design must meet one of the following two options: This design meets Option #1, Deep pool is 6}inches below SLWT, If yes: (Y or N) SLWT (Seasonally Low Water Table) fmsl This design meets Option #2, Has a clay liner Y If yes: Depth of topsoil above clay liner 6.00 in Topographic Zone Depths Temporary Pool Shallow Land 12.00 in OK Permanent Pool Shallow Water 6.00 in OK Deep Pool (shallowest) 18.00 in OK Deep Pool (deepest) 30.00 in OK Planting Plan Are cattails included in the planting plan? N (Y or N) OK Number of Plants in planting plan recommended: Herbacious (4'inch diameter) 612 Shrubs/small trees (1 gallon or larger) 408 Trees (1.5" dbh) 102 Number of Plants in planting plan provided (several species of each plant type are recommended): Herbacious (4~inch diameter) Shrubs/small trees (1 gallon or larger) Trees (2.5" dbh) Porm SW401-Wetland-Rev 2 Parts I and II. Project Design Summary, Page 2 of 3 Permit Number__ (to be provided by DWO) Additional Information Can the design volume be contained? Y (Y or N) OK Does volume in excess of the design volume flow evenly distributed through a vegetated filter? y (Y or N) OK What is the length of the vegetated filter? 29,00 ft Are calculations for supporting the design volume provided in the application? Y (Y or N) OK Is BMP sized to handle all runoff from ultimate build-out? Y (Y or N) OK Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? Y (Y or N) OK The length to width ratio is: 2.09 :1 OK Approximate wetland length 207.00 ft Approximate wetland width 99.00 ft Approximate surface area using length and width provided z 20,493.00 ft This approx. surface area is within this number of square feet of the entire wetland surface area reported above: Will the wetland be stabilized within 14 days of construction? Y (Y or N) OK Form SW401-Wetland-Rev.2 Parts I and II. Project Design Summary, Page 3 of 3 ETF•0~RlLL 559 Jones Franklin Road, Suite 164 Raleigh, North Carolina 27606 Phone:919-851-8077 Fas:919-851-8107 ]209 Floral Park~rav, Suitc B VFilmington, North Carolina 28403 Phoue:910-799-5682 Fax:910-~99-5684 D~~ I b 4 c. TD rA I SUBJECT S?Q~D/ti~,i-'~wM'*Gti ~/Cf~ANd C.t~GS PROJECT Sua-TenwinrdS LOCATION ~L25 C1~- PREPARED BY_ G SP DATE 3lZelos STATION CHECKED BY DA 3 .__-- 1 ~c 2c~wM1ad Wa•ra-~ Qual-TY VoluM~ Rv~ O.oS+ a•oo9 (_~ _ •05 + . aoq(33~ °~ 3 ~-7 w, I,,.. Vc1u,..e 2 eQ~p _ I ~,.•. ~ 0.347~~,,,,, '~ !.- x IbAc t2~~ o, q-y, 2 7 A c- Fr 2a~ X54 ~r3 sur~PPGE AtiEA 2EQ~A'% Qvol _ 2o~~s4~t3 ,()piA,~-r5 t ~T Z o~ i 5 4 FtZ SHEET _OF PGfLIhArrLNT POD' ~ E~ 2 4S.cb~ 3S Pre-Dev. 1S ost-Dev 2P Stormwater Wetland - Phase 2 Subcat CReach on Llnk~ Stormwater Wetland -Phase 2_03_28_08 Prepared by {enter your company name here} Page 2 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Area Listing (all nodes) Area (acres) CN Description (subcats) 10.740 61 Managed Open Space (1 S) 16.000 65 Woods/grass comb., Fair, HSG B (3S) 3.520 98 Houses & Driveways (1 S) 1.740 98 Roads (1 S ) 32.000 Stormwater Wetland -Phase 2_03_28_08 Type 11 24-hr 1 "Runoff Rainfall=2.00" Prepared by {enter your company name here} Page 3 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Time span=2.00-120.00 hrs, dt=0.05 hrs, 2361 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method -Pond routing by Stor-Ind method Subcatchment 1S: Post-Dev. Runoff Area=16.000 ac Runoff Depth=0.32" Tc=20.0 min CN=73 Runoff=4.12 cfs 0.427 of Subcatchment 3S: Pre-Dev. Runoff Area=16.000 ac Runoff Depth=0.14" Flow Length=987' Tc=40.3 min CN=65 Runoff=0.54 cfs 0.180 of Pond 2P: Stormwater Wetland -Phase 2 Peak Elev=248.67' Storage=11,506 cf Inflow=4.12 cfs 0.427 of Primary=0.17 cfs 0.423 of Secondary=0.00 cfs 0.000 of Outflow=0.17 cfs 0.423 of Total Runoff Area = 32.000 ac Runoff Volume = 0.607 of Average Runoff Depth = 0.23" 83.56% Pervious Area = 26.740 ac 16.44% Impervious Area = 5.260 ac Stormwater Wetland -Phase 2_03_28_08 Type 11 24-hr 1 "Runoff Rainfall-2.00" Prepared by {enter your company name here} Page 4 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Subcatchment 1S: Post-Dev. Post-Development Inflow to Pond #1 in Phase 2 Drainage Area = 16.00 Acres °'o Impervious = 33% Runoff = 4.12 cfs @ 12.17 hrs, Volume= 0.427 af, Depth= 0.32" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1" Runoff Rainfall=2.00" Area (ac) CN Descriotion 1.740 98 Roads 3.520 98 Houses & Driveways 10.740 61 Managed Open Space 16.000 73 Weighted Average 10.740 Pervious Area 5.260 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, Tc from Storm Drain Calculations Subcatchment 1 S: Post-Dev. Hydrograph ® Runoff 4~ Type 1124-h r 1" F~ u n off Rainfall-2.00" Runoff Area=16.000 ac 3 ~~ Runoff Volume=0.427 of V Runoff Depth=0.32." ~° 2-- - Tc_20.0 min CN=73 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland -Phase 2_03_28_08 Type 1124-hr 1 "Runoff Rainfall=2.00" Prepared by {enter your company name here} Page 5 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Subcatchment 3S: Pre-Dev. Post-Development Inflow to Pond #1 in Phase 2 Drainage Area = 16.00 Acres Impervious = 33% Runoff = 0.54 cfs @ 12.63 hrs, Volume= 0.180 af, Depth= 0.14" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1" Runoff Rainfall=2.00" Area (ac) CN Description 16.000 65 Woods/grass comb., Fair, HSG B 16.000 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.5 150 0.0267 0.09 Sheet Flow, Overland Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.20" 13.8 837 0.0406 1.01 Shallow Concentrated Flow, Shallow Concentrated Flow Woodland Kv= 5.0 fos 40.3 987 Total Subcatchment 3S: Pre-Dev. Hydrograph 0.55 o.ea as Type II 24-hr 1 " Runoff 0.5 Rainfall-2.00" 0.45 Runoff Area=16.000 ac 0.4 Runoff: Volume=0.180 of 0.35 Runoff Depth=0..14" 3 0.3 LL 0.25 Flow Length=987' 0 2 Tc=40.3 min 0.15 ~ CN=65 ~., 0.05 ® Runoff 2.- 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland -Phase 2_03_28_08 Type 1124-hr 1 "Runoff Rainfall=2.00" Prepared by {enter your company name here} Page 6 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetland -Phase 2 Inflow Area = 16.000 ac, Inflow Depth = 0.32" for 1" Runoff event Inflow = 4.12 cfs @ 12.17 hrs, Volume= 0.427 of Outflow = 0.17 cfs @ 20.91 hrs, Volume= 0.423 af, Atten= 96%, Lag= 524.5 min Primary = 0.17 cfs @ 20.91 hrs, Volume= 0.423 of Secondary = 0.00 cfs @ 2.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 248.67' @ 20.91 hrs Surf.Area= 21,228 sf Storage= 11,506 cf Plug-Flow detention time= 936.2 min calculated for 0.423 of (99% of inflow) Center-of-Mass det. time= 933.0 min (1,849.5 - 916.4 ) Volume Invert Avail.Storage Storage Description #1 248.00' 100,740 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) 248.00 12,181 937.0 0 0 12,181 248.50 20,220 597.0 8,016 8,016 53,687 249.00 23,284 628.0 10,867 18,883 56,725 250.00 25,198 647.0 24,235 43,118 58,755 251.00 27,168 666.0 26,177 69,294 60,846 252.00 29,194 685.0 28,175 97,469 62,997 252.10 36,359 747.0 3,271 100,740 70,063 Device Routing Invert Outlet Devices #1 Primary 244.00' 18.0" x 64.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 238.00' S= 0.0938'/' Cc= 0.900 n= 0.024 #2 Device 1 248.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 249.00' 36.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 250.00' 20.0' long Sharp-Crested Rectangular Weir 2 E nd Contraction(s) Primary OutFlow Max=0.17 cfs @ 20.91 hrs HW=248.67' (Free Discharge) t- =Culvert (Passes 0.17 cfs of 16.84 cfs potential flow) ~2=Orifice/Grate (Orifice Controls 0.17 cfs @ 3.55 fps) 3-Orifice/Grate (Controls 0.00 cfs) econdary OutFlow Max=0.00 cfs @ 2.00 hrs HW=248.00' (Free Discharge) =Sharp-Crested Rectangular Weir (Controls 0.00 cfs) Stormwater Wetland -Phase 2_03_28_08 Type 11 24-hr 1 "Runoff Rainfall=2.00" Prepared by {enter your company name here} Page 7 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetland -Phase 2 Hydrograph 4 3 N ' V 0 2 , LL 1 0.17 cts ,7/,,:r ,.~ •! 0.17 cfs 0.00 cfs 0 Inflow Area=16.000 ac Peak Elev-248.67' Storage=11,506 cf ^ Inflow CJ Outflow d Primary C] Secondary 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 B5 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland -Phase 2_03_28_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 8 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Time span=2.00-120.00 hrs, dt=0.05 hrs, 2361 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method -Pond routing by Stor-Ind method Subcatchment 1S: Post-Dev. Runoff Area=16.000 ac Runoff Depth=0.98" Tc=20.0 min CN=73 Runoff=16.31 cfs 1.310 of Subcatchment 3S: Pre-Dev. Runoff Area=16.000 ac Runoff Depth=0.60" Flow Length=987' Tc=40.3 min CN=65 Runoff=5.11 cfs 0.801 of Pond 2P; Stormwater Wetland -Phase 2 Peak Elev=249.21' Storage=23,782 cf Inflow=16.31 cfs 1.310 of Primary=3.19 cfs 1.305 of Secondary=0.00 cfs 0.000 of Outflow=3.19 cfs 1.305 of Total Runoff Area = 32.000 ac Runoff Volume = 2.111 of Average Runoff Depth = 0.79" 83.56% Pervious Area = 26.740 ac 16.44% Impervious Area = 5.260 ac Stormwater Wetland -Phase 2_03_28_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 9 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Subcatchment 1 S: Post-Dev. Post-Development Inflow to Pond #1 in Phase 2 Drainage Area = 16.00 Acres Impervious = 33°'0 Runoff = 16.31 cfs @ 12.14 hrs, Volume= 1.310 af, Depth= 0.98" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Yr. 24-Hr. Rainfall=3.20" Area (ac) CN Descriotion 1.740 98 Roads 3.520 98 Houses & Driveways 10.740 61 Managed Open Space 16.000 73 Weighted Average 10.740 Pervious Area 5.260 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, Tc from Storm Drain Calculations Subcatchment 1 S: Post-Dev. Hydrograph ® Runoff ~~ ic.aias ,6 Type II 24-hr 1-Yr. 24-Hr. ,5~ ~ Rainfall=3.20" 14 ,3 ~ Runoff Area=16.000 ac 12 „ - Runoff Volume=1.10 of '° 41 Runoff Depth-0.98" 39 LL 8 j Tc=20.0 m i n CN=73 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Tlme (hours) Stormwater Wetland -Phase 2_03_28_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 10 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Subcatchment 3S: Pre-Dev. Post-Development Inflow to Pond #1 in Phase 2 Drainage Area = 16.00 Acres °% Impervious = 33% Runoff = 5.11 cfs @ 12.45 hrs, Volume= 0.801 af, Depth= 0.60" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Yr. 24-Hr. Rainfall=3.20" Area (ac) CN Description 16.000 65 Woods/grass comb., Fair, HSG B 16.000 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.5 150 0.0267 0.09 Sheet Flow, Overland Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.20" 13.8 837 0.0406 1.01 Shallow Concentrated Flow, Shallow Concentrated Flow Woodland Kv= 5.0 fps 40.3 987 Total Subcatchment 3S: Pre-Dev. Hydrograph ~ Runoff 5 Type II 24-hr 1-Yr. 24-Hr. t: Rainfa11~3.:20" 4 Runoff Area=16.000 ac Runoff Volume=0.801 of 3 ~ ~ Runoff Depth-0.60" ,° Flow Length=987' 2-1 I E Tc=40.3 m i n CN=65 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland -Phase 2_03_28_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 11 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetland -Phase 2 Inflow Area = 16.000 ac, Inflow Depth = 0.98" for 1-Yr. 24-Hr. event Inflow = 16.31 cfs @ 12.14 hrs, Volume= 1.310 of Outflow = 3.19 cfs @ 12.72 hrs, Volume= 1.305 af, Atten= 80%, Lag= 34.3 min Primary = 3.19 cfs @ 12.72 hrs, Volume= 1.305 of Secondary = 0.00 cfs @ 2.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 249.21' @ 12.72 hrs Surf.Area= 23,677 sf Storage= 23,782 cf Plug-Flow detention time= 605.0 min calculated for 1.305 of (100% of inflow) Center-of-Mass det. time= 602.6 min (1,477.6 - 875.1 ) Volume Invert Avail.Storage Storage Description #1 248.00' 100,740 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) 248.00 12,181 937.0 0 0 12,181 248.50 20,220 597.0 8,016 8,016 53,687 249.00 23,284 628.0 10,867 18,883 56,725 250.00 25,198 647.0 24,235 43,118 58,755 251.00 27,168 666.0 26,177 69,294 60,846 252.00 29,194 685.0 28,175 97,469 62,997 252.10 36,359 747.0 3,271 100,740 70,063 Device Routing Invert Outlet Devices #1 Primary 244.00' 18.0" x 64.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 238.00' S= 0.0938'/' Cc= 0.900 n= 0.024 #2 Device 1 248.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 249.00' 36.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 250.00' 20.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=3.18 cfs @ 12.72 hrs HW=249.21' (Free Discharge) t- =Culvert (Passes 3.18 cfs of 17.97 cfs potential flow) ~2=Orifice/Grate (Orifice Controls 0.25 cfs @ 5.01 fps) 3-Orifice/Grate (Weir Controls 2.93 cfs @ 1.49 fps) econdary OutFlow Max=0.00 cfs @ 2.00 hrs HW=248.00' (Free Discharge) =Sharp-Crested Rectangular Weir (Controls 0.00 cfs) Stormwater Wetland -Phase 2_03_28_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 12 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetland -Phase 2 Hydrograph ^ Inflow C7 Outflow Primary ^ Secondary N V 3 O LL 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland -Phase 2_03_28_08 Type 1124-hr 100-Yr. 24-Hr. Rainfall=8.40" Prepared by {enter your company name here} Page 13 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Time span=2.00-120.00 hrs, dt=0.05 hrs, 2361 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method -Pond routing by Stor-Ind method Subcatchment 1S: Post-Dev. Runoff Area=16.000 ac Runoff Depth=5.17" Tc=20.0 min CN=73 Runoff=91.32 cfs 6.888 of Subcatchment 3S: Pre-Dev. Runoff Area=16.000 ac Runotf Depth=4.22" Flow Length=987' Tc=40.3 min CN=65 Runoff=47.53 cfs 5.627 of Pond 2P: Stormwater Wetland -Phase 2 Peak Elev=250.92' Storage=67,012 cf Inflow=91.32 cfs 6.888 of Primary=20.45 cfs 5.257 of Secondary=56.77 cfs 1.625 of Outflow=77.22 cfs 6.882 of Total Runoff Area = 32.000 ac Runoff Volume = 12.515 of Average Runoff Depth = 4.69" 83.56% Pervious Area = 26.740 ac 16.44% Impervious Area = 5.260 ac Stormwater Wetland -Phase 2_03_28_08 Type 1124-hr 100-Yr. 24-Hr. Rainfall=8.40" Prepared by {enter your company name here} Page 14 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Subcatchment 1 S: Post-Dev. Post-Development Inflow to Pond #1 in Phase 2 Drainage Area = 16.00 Acres °~o Impervious = 33% Runoff = 91.32 cfs Q 12.12 hrs, Volume= 6.888 af, Depth= 5.17" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Yr. 24-Hr. Rainfall=8.40" Area (ac) CN Description 1.740 98 Roads 3.520 98 Houses & Driveways 10.740 61 Managed Open Space 16.000 73 Weighted Average 10.740 Pervious Area 5.260 Impervious Area Tc Length Slope Velocity Capacity Description ___~min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, Tc from Storm Drain Calculations Subcatchment 1 S: Post-Dev. Hydrograph ® Runoff 9° Type 11 24-hr 100-Yr. 24-Hr. 95 - Rainfall.-8.40" 80 tx ~o - ~ Runoff Area=16.000 ac 65 Runoff Volume =6.88..8 of y 60 Runo#f Depth-5.17" v 55 3 50 °'. Tc=20.0 m i n o LL 45 40 ~ CN=73 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland -Phase 2_03_28_08 Type 1124-hr 100-Yr. 24-Hr. Rainfall=8.40" Prepared by {enter your company name here} Page 15 HydroCAD® 8.00 s/n 004959 ©2006 HVdroCAD Software Solutions LLC 4/7/2008 Subcatchment 3S: Pre-Dev. Post-Development Inflow to Pond #1 in Phase 2 Drainage Area = 16.00 Acres °% Impervious = 33°% Runoff = 47.53 cfs Q 12.38 hrs, Volume= 5.627 af, Depth= 4.22" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Yr. 24-Hr. Rainfall=8.40" Area (ac) CN Description 16.000 65 Woods/grass comb., Fair, HSG B 16.000 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.5 150 0.0267 0.09 Sheet Flow, Overland Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.20" 13.8 837 0.0406 1.01 Shallow Concentrated Flow, Shallow Concentrated Flow Woodland Kv= 5.0 fos 40.3 987 Total Subcatchment 3S: Pre-Dev. Hydrograph ® Runoff 45~ ~ ~.~' Type II 24-hr 100-Yr. 24-Hr. Rainfall=8.40" 4° Runoff Area=16.000 ac 35 ~ Runoff Volume-=5.627 of 30 ~ a~ Runoff Depth.4,22" 0 25_ ~ Flow Length=987' LL 2° ~ Tc-40.3 min CN=65 o 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland -Phase 2_03_28_08 Type 1124-hr 100-Yr. 24-Hr. Rainfall=8.40'' Prepared by {enter your company name here} Page 16 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetland -Phase 2 Inflow Area = 16.000 ac, Inflow Depth = 5.17" for 100-Yr. 24-Hr. event Inflow = 91.32 cfs @ 12.12 hrs, Volume= 6.888 of Outflow = 77.22 cfs @ 12.22 hrs, Volume= 6.882 af, Atten= 15%, Lag= 5.6 min Primary = 20.45 cfs @ 12.22 hrs, Volume= 5.257 of Secondary = 56.77 cfs @ 12.22 hrs, Volume= 1.625 of Routing by Stor-Ind method, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 250.92' @ 12.22 hrs Surf.Area= 26,999 sf Storage= 67,012 cf Plug-Flow detention time= 136.1 min calculated for 6.880 of (100% of inflow) Center-of-Mass det. time= 137.7 min (964.0 - 826.3 ) Volume Invert Avail.Storage Storage Description #1 248.00' 100,740 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) 248.00 12,181 937.0 0 0 12,181 248.50 20,220 597.0 8,016 8,016 53,687 249.00 23,284 628.0 10,867 18,883 56,725 250.00 25,198 647.0 24,235 43,118 58, 755 251.00 27,168 666.0 26,177 69,294 60, 846 252.00 29,194 685.0 28,175 97,469 62,997 252.10 36,359 747.0 3,271 100,740 70,063 Device Routing Invert Outlet Devices #1 Primary 244.00' 18.0" x 64.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 238.00' S= 0.0938 '/' Cc= 0.900 n= 0.024 #2 Device 1 248.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 249.00' 36.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 250.00' 20.0' long Sharp-Crested Rectangular Weir 2 E nd Contraction(s) Primary OutFlow Max=20.44 cfs @ 12.22 hrs HW=250.90' (Free Discharge) t- =Culvert (Barrel Controls 20.44 cfs @ 11.57 fps) ~2_Orifice/Grate (Passes < 0.39 cfs potential flow) 3_Orifice/Grate (Passes < 46.97 cfs potential flow) econdary OutFlow Max=55.74 cfs @ 12.22 hrs HW=250.90' (Free Discharge) =Sharp-Crested Rectangular Weir (Weir Controls 55.74 cfs @ 3.11 fps) Stormwater Wetland -Phase 2_03_28_08 Type 1124-hr 100-Yr. 24-Hr. Rainfall=8.40'' Prepared by {enter your company name here} Page 17 HydroCAD® 5.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetland -Phase 2 Hydrograph ^ Inflow ~~ Outflow FD Primary ^ Secondary N V 3 O LL 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 60 85 90 95 100 105 110 115 120 Ttme (hours) °°' ;~ ~ ~, ~ ~ ~ ~ ~ ~ ~ 1 _ ~ ~ ~ __ i ~ ___~ -- -.1 ~~ ~ ~ ~ ~ ~ _ _- __- ~- _~~_ .-- / ~~ ~ ~ / ,, _--- ___ ~~~ _ ', ,_'I--- -- --------- t ~ ,/ , ~~ _ ~, ~'~~__'_~~, -' _ _ ----~_------ ~_ ~~, ~ ~ ~~ ~~ iii ~ ~ ~ ~` v f~~~~' . = - _ _ ~ ~ `a L ~ \ ~ \~\ ' ~ ~~. A A / ~ _ ~~ ~ A '~ ~ ~ ~ ~ / r ~\ \ ~ \ ~ ~ / ~~: ~ ~ \ ~ ~' ~~ ~ ~ ~ ~ ~,~ ~ ~ \ V \\~~\\\\ \ ~ ~ ~ \ v ~ i ,, ,~, ~ ~ ~ ~ ~ ~~~ \_~ ~`~ ~~\\ ~_ ~_ ~yv\\\\\\, ~\\\\ ~ .~ ~~ , ~~A\\\V~~,A \ \ ~ ~ ~ ~, ~ ---- Permit Number _ ,to be provided by DWQ) ~~ ~~F W A )~E9 ~~~ O '.._, ~G ~ ~r NCDENR ~~~ o ;~~~~~_..~.,;- - STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all the required information. i. PROJECT INFORMATION Project name Summerwinds Plantation Contact name Mr. Ron Mikesh Phone number 919-291.5517 Date April 7, 2008 Drainage area number Stormwater Wetland #4 II. DESIGN INFORMATION _ _, , ... ,, Site Characteristics Drainage area 524,822.00 ftz Impervious area 314,893.20 ftz Percent impervious 60.0% Design rainfall depth 1.00 inch Peak Flow Calculations 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Pre/Post 1-yr, 24-hr peak control Storage Volume: Non-SR Waters Design volume (temporary pool volume) Depth of temporary pool/ponding depth (DP,a~,s) Drawdown time Diameter of orifice Coefficient of discharge (Cp) used in orifice diameter calculation Driving head (H°) used in the orifice diameter calculation Storage Volume: SR Waters Parameters 1-yr, 24-hr depth Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Form SW401-Wetland-Rev.2 3.20 in N/A in/hr 3.91 ft3/sec 21.39 ft3/sec 17.48 ft3/sec 21,665.00 ft3 12.00 in 3.20 days 3.00 in 0.60 (unitless) 0.66 ft in ft3 ft3 ft3 ft3 OK OK OK Drawdown orifice diameter may be insufficient. Please provide adequate supporting calculations. OK Parts I and II. Project Design Summary, Page 1 of 3 Permit Number______ __ (to be provided by DWOI Surface Areas of Wetland Zones Surface Area of Entire Wetland Shallow Land The shallow land percentage is: Shallow Water The shallow water percentage is: Deep Pool Forebay portion of deep pool (pretreatment) The Forebay surface area percentage is: Non-Forebay portion of deep pool The non-forebay deep pool surface area percentage is: Total of wetland zone areas Add or subtract the following area from the zones Topographic Zone Elevations Temporary Pool Shallow Land (top) Permanent Pool Shallow Water (top) Deep Pool (top) Most shallow point of deep pool's bottom Deepest point of deep pool's bottom Design must meet one of the following two options: This design meets Option #1, Deep pool is 6'inches below SLWT, If yes: SLWT (Seasonally Low Water Table) This design meets Option #2, Has a clay liner If yes: Depth of topsoil above clay liner Topographic Zone Depths Temporary Pool Shallow Land Permanent Pool Shallow Water Deep Pool (shallowest) Deep Pool (deepest) Planting Plan Are cattails included in the planting plan? Number of Plants in planting plan recommended: Herbacious (4'inch diameter) Shrubs/small trees (1 gallon or larger) Trees (1.5" dbh) Number of Plants in planting plan provided (several species of each plant type are recommended): Herbacious (4'inch diameter) Shrubs/small trees (1 gallon or larger) Trees (2.5" dbh) Form SW401-Wetland-Rev.2 _ 25,873.00 f12 10,160.00 ft2 0.39 °o 10.536.00 ft2 0.41 °a 2,600.00 ft2 0.10 °a 2,577.00 ft2 0.10 25,873.00 ft2 0.00 ft2 303.00 fmsl 302.00 fmsl 301.50 fmsl 300.00 fmsl 298.50 fmsl (Y or N) fmsl Y 6.00 in 12.00 in 6.00 in 18.00 in 36.00 in N (Y or N) 780 520 130 OK OK OK OK OK OK OK OK OK OK OK Parts I and II. Project Design Summary, Page 2 of 3 Permit Number_______ ____ __ tto be provided by DWQ) Additional Information Can the design volume be contained? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Are calculations for supporting the design volume provided in the application? Is BMP sized to handle all runoff from ultimate build-out? Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? The length to width ratio is: Approximate wetland length Approximate wetland width Approximate surface area using length and width provided Will the wetland be stabilized within 14 days of construction? Y (Y or N) Y (Y or N) 25.00 ft Y (Y or N) Y (Y or N) Y (Y or N) 1.99 :1 229.00 ft 115.00 ft 26,335.00 ft2 Y (Y or N) OK OK OK OK OK OK This approx. surface area is within this number of square feet of the entire wetland surface area reported above: OK Form SW401-Wetland-Rev.2 Parts I and II. Project Design Summary, Page 3 of 3 ~.~,;. N~~.~~HG 559 Jones Franl.lin Road, Suite 164 Raleigh, North Carolina 27(~O6 Phone: 919-551-3077 Fas: 919 ti51-?+107 I2t19 Floral Parkway, Suite B Wilmington, North Carolina 23403 Phone:910-799-Sh32 Fax~910-799-5684 A~RIn~A(9E A/2EAa SL;BJECT_ n+we~n Wc~~~+~-n.d .~¢ PROJECT ~m wi,v~S LOCATION PKEP:\RED BY G~__ DATE 4IZIOS STA`I70N CHECKED BY. Rv c o•05 -f- 0.009 (_~ ~~~ 'O5 -t •no9(c~cl Rte= ~ O. 590 c., /w, DATE SHEET OF Volu„,.e Re~ 'c/ ~ ~,., ~' o. 59a ~. ~ I -~E- /Z• o5ge Vol /Zy'~ 2 5 807 F'-r 3 2S$p7 5 A = Z 5 P,o'1 ~ :. 3S 1S Pre-Dev. ost-Dev 2P Stormwater Wetland - #4 Subcat Reachl Pon Link ---J Stormwater Wetland - #4_04_03_08 Prepared by {enter your company name here} Page 2 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Area Listing (all nodes) Area (acres) CN Description (subcats~ 4.820 61 Managed Open Space (1S) 12.050 65 Woods/grass comb., Fair, HSG B (3S) 7.230 98 Roads, Houses, Driveways (1S) 24.100 Stormwater Wetland - #4_04_03_08 Type 11 24-hr 1 "Runoff Rainfall=2.00" Prepared by {enter your company name here} Page 3 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Time span=2.00-120.00 hrs, dt=0.05 hrs, 2361 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method -Pond routing by Stor-Ind method Subcatchment 1S: Post-Dev. Runoff Area=12.050 ac Runoff Depth=0.70" Tc=20.0 min CN=83 Runoff=8.89 cfs 0.698 of Subcatchment 3S: Pre-Dev. Runoff Area=12.050 ac Runoff Depth=0.14" Flow Length=952' Tc=39.4 min CN=65 Runoff=0.41 cfs 0.136 of Pond 2P: Stormwater Wetland - #4 Peak Elev=302.92' Storage=21,665 cf Inflow=8.89 cfs 0.698 of Primary=0.21 cfs 0.687 of Secondary=0.00 cfs 0.000 of Outflow=0.21 cfs 0.687 of Total Runoff Area = 24.100 ac Runoff Volume = 0.834 of Average Runoff Depth = 0.42" 70.00% Pervious Area = 16.870 ac 30.00% Impervious Area = 7.230 ac Stormwater Wetland - #4_04_03_08 Type 1124-hr 1 "Runoff Rainfall=2.00" Prepared by {enter your company name here} Page 4 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Subcatchment 1 S: Post-Dev. Post-Development Inflow to Pond #4 Drainage Area = 12.05 Acres Impervious = 60% Runoff = 8.89 cfs @ 12.14 hrs, Volume= 0.698 af, Depth= 0.70" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1" Runoff Rainfall=2.00" Area (acl CN Description 7.230 98 Roads, Houses, Driveways 4.820 61 Managed Open Space 12.050 83 Weighted Average 4.820 Pervious Area 7.230 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (fVsec) (cfs) 20.0 Direct Entry, Tc from Storm Drain Calculations Subcatchment 1 S: Post-Dev. Hydrograph ® Runoff 9 Type II 24-h1r 1" Runoff 8 =~ Rainfall=2.00" 7 ~ Runoff Aria=12.050 ac 6 ~ Runoff Volume=0.698 of Runoff Depth-0.70" 3 5 ° Tc=20.0 min lL ' 4 CN=83 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Tlme (hours) Stormwater Wetland - #4_04_03_08 Type 11 24-hr 1 "Runoff Rainfall=2.00" Prepared by {enter your company name here} Page 5 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Subcatchment 3S: Pre-Dev. Post-Development Inflow to Pond #4 Drainage Area = 12.05 Acres °% Impervious = 60°% Runoff = 0.41 cfs @ 12.62 hrs, Volume= 0.136 af, Depth= 0.14" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1"Runoff Rainfall=2.00" Area (ac) CN Description 12.050 65 Woods/grass comb., Fair, HSG B 12.050 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 22.5 150 0.0400 0.11 Sheet Flow, Overland Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.20" 16.9 802 0.0250 0.79 Shallow Concentrated Flow, Shallow Concentrated Flow Woodland Kv= 5.0 fqs 39.4 952 Total Subcatchment 3S: Pre-Dev. Hydrograph D Runoff vo.4 Type 1124-h r 1 " Runoff 0.38 0.36 Railnfa11.~2.00" 0.34 0.32 ~ ; Runoff Area=12.050 ac 0.3- 0~28 Runoff Volume=0.36 of w 0.26. 0.24 Runoff Depth=0.14" ° 0.22_ LL 0.2 Flow Length-952' 0., 6 0.16 Tc=39.4 m i n 0.14 0.12 CN=65 °., 0.08 _ ` °.°~- 0.02.. °- 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland - #4_04_03_08 Type 11 24-hr 1 "Runoff Rainfall=2.00" Prepared by {enter your company name here} Page 6 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetland - #4 inflow Area = 12.050 ac, Inflow Depth = 0.70" for 1" Runoff event Inflow = 8.89 cfs @ 12.14 hrs, Volume= 0.698 of Outflow = 0.21 cis @ 20.42 hrs, Volume= 0.687 af, Atten= 98%, Lag= 496.7 min Primary = 0.21 cfs @ 20.42 hrs, Volume= 0.687 of Secondary = 0,00 cis @ 2.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 302.92' @ 20.42 hrs Surf.Area= 28,620 sf Storage= 21,665 cf Plug-Flow detention time= 1,322.3 min calculated for 0.687 of (98% of inflow) Center-of-Mass det. time= 1,315.0 min (2,182.4 - 867.4 ) Volume Invert Avail.Storage Storage Description #1 302.00' 124,893 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) 302.00 15,713 1,076.0 0 0 15,713 302.50 25,873 645.0 10,291 10,291 74,741 303.00 29,178 677.0 13, 754 24, 046 78,124 304.00 31,236 696.0 30,201 54,247 80,310 305.00 33,350 714.0 32,287 86,534 82,450 306.00 35,522 733.0 34,430 120,965 84,754 306.10 43,168 796.0 3, 928 124, 893 92, 420 Device Routing Invert Outlet Devices #1 Primary 297.50' 15.0" x 70.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 283.00' S= 0.2071 '/' Cc= 0.900 n= 0.024 #2 Device 1 302.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 303.00' 18.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 304.00' 20.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=0.21 cfs @ 20.42 hrs HW=302.92' (Free Discharge) t-1=Culvert (Passes 0.21 cfs of 12.94 cfs potential flow) ~2=Orifice/Grate (Orifice Controls 0.21 cfs @ 4.29 fps) 3=Orifice/Grate (Controls 0.00 cfs) econdary OutFlow Max=0.00 cfs @ 2.00 hrs HW=302.00' (Free Discharge) =Sharp-Crested Rectangular Weir (Controls 0.00 cfs) Stormwater Wetland - #4_04_03_08 Type 1124-hr 1 "Runoff Rainfall=2.00" Prepared by {enter your company name here} Page 7 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetland - #4 Hydrograph inflow Area=12.050 ac Peak Elev=302.92' Storage=21,665 cf 7- 6 N V ' 3 5 _O ' LL 4 3 2 1 ''~ 0.00 cfs ~' ^ Inflow L' Outflow G~ Primary Ci Secondary 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Tlme (hours) Stormwater Wetland - #4_04_03_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 8 HydroCAD® 8.00 sin 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Time span=2.00-120.00 hrs, dt=0.05 hrs, 2361 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method -Pond routing by Stor-Ind method Subcatchment 1S: Post-Dev. Runoff Area=12.050 ac Runoff Depth=1.61" Tc=20.0 min CN=83 Runoff=21.39 cfs 1.616 of Subcatchment 3S: Pre-Dev. Runoff Area=12.050 ac Runoff Depth=0.60" Flow Length=952' Tc=39.4 min CN=65 Runoff=3.91 cfs 0.603 of Pond 2P: Stormwater Wetland - #4 Peak Elev=303.36' Storage=34,824 cf Inflow=21.39 cfs 1.616 of Primary=3.66 cfs 1.604 of Secondary=0.00 cfs 0.000 of Outflow=3.66 cfs 1.604 of Total Runoff Area = 24.100 ac Runoff Volume = 2.219 of Average Runoff Depth =1.10" 70.00% Pervious Area =16.870 ac 30.00% Impervious Area = 7.230 ac Stormwater Wetland - #4_04_03_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall-3.20" Prepared by {enter your company name here} Page 9 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Subcatchment 1 S: Post-Dev. Post-Development Inflow to Pond #4 Drainage Area = 12.05 Acres °% Impervious = 60% Runoff = 21.39 cfs Q 12.13 hrs, Volume= 1.616 af, Depth= 1.61" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Yr. 24-Hr. Rainfall=3.20" Area (ac) CN Description 7.230 98 Roads, Houses, Driveways 4.820 61 Managed Open Space 12.050 83 Weighted Average 4.820 Pervious Area 7.230 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, Tc from Storm Drain Calculations Subcatchment 1 S: Post-Dev. Hydrograph ~ Runoff 22 aiaa cis 21 20 Type II 24-hr 1-Yr. 24-Hr. ,9 ~ Rainfall-3.20" 18 17 Runoff Area=12.050 ac 16 r: 15 ~ ~~ Runoff Volume_1.616 of ,... 14 ,2 Runoff Depth-1.61 " ° " '~ Tc=20.0 m i n ~ 10 9 CN-83 8~ 7 6- 5 4 3 2 1. 0- . ., 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Tlme (hours) Stormwater Wetland - #4_04_03_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 10 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Subcatchment 3S: Pre-Dev Post-Development Inflow to Pond #4 Drainage Area = 12.05 Acres °o Impervious = 60% Runoff = 3.91 cfs @ 12.43 hrs, Volume= 0.603 af, Depth= 0.60" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Yr. 24-Hr. Rainfall=3.20" Area (ac) CN Description 12.050 65 Woods/arass comb., Fair, HSG B 12.050 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 22.5 150 0.0400 0.11 Sheet Flow, Overland Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.20" 16.9 802 0.0250 0.79 Shallow Concentrated Flow, Shallow Concentrated Flow Woodland Kv= 5.0 fps 39.4 952 Total Subcatchment 3S: Pre-Dev. Hydrograph ® Runoff ' Type II 24-hr 1-Yr. ~4-Hr. _~ Rainfall-3.20" 3 Runoff Area.'12.050 ac r Runoff Volume=0.603 of w Runoff Depth.0.60'' ~° 2 Flow Length-952' Tc-39.4 min CN=65 o 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland - #4_04_03_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20" Prepared by {enter your company name here} Page 11 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetland - #4 Inflow Area = 12.050 ac, Inflow Depth = 1.61" for 1-Yr. 24-Hr. event Inflow = 21.39 cfs @ 12.13 hrs, Volume= 1.616 of Outflow = 3.66 cfs @ 12.70 hrs, Volume= 1.604 af, Atten= 83%, Lag= 34.1 min Primary = 3.66 cfs @ 12.70 hrs, Volume= 1.604 of Secondary = 0.00 cfs @ 2.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 303.36' @ 12.70 hrs Surf.Area= 29,921 sf Storage= 34,824 cf Plug-Flow detention time= 736.3 min calculated for 1.604 of (99% of inflow) Center-of-Mass det. time= 731.8 min (1,574.5 - 842.7 ) Volume Invert Avail.Storage Storage Description #1 302.00' 124,893 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) 302.00 15, 713 1, 076.0 0 0 15, 713 302.50 25,873 645.0 10,291 10,291 74,741 303.00 29,178 677.0 13,754 24,046 78,124 304.00 31,236 696.0 30,201 54,247 80,310 305.00 33,350 714.0 32,287 86,534 82,450 306.00 35, 522 733.0 34, 430 120, 965 84, 754 306.10 43,168 796.0 3,928 124,893 92,420 Device Routing Invert Outlet Devices #1 Primary 297.50' 15.0" x 70.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 283.00' S= 0.2071 '/' Cc= 0.900 n= 0.024 #2 Device 1 302.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 303.00' 18.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 304.00' 20.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=3.66 cfs @ 12.70 hrs HW=303.36' (Free Discharge) L =Culvert (Passes 3.66 cfs of 13.53 cfs potential flow) ~2=Orifice/Grate (Orifice Controls 0.26 cfs @ 5.36 fps) 3_Orifice/Grate (Weir Controls 3.39 cfs @ 1.97 fps) econdary OutFlow Max=0.00 cfs @ 2.00 hrs HW=302.00' (Free Discharge) =Sharp-Crested Rectangular Weir (Controls 0.00 cfs) Stormwater Wetland - #4_04_03_08 Type 1124-hr 1-Yr. 24-Hr. Rainfall=3.20'' Prepared by {enter your company name here} Page 12 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetland - #4 Hydrograph ~ Inflow Outflow D Primary ^ Secondary h w v 3 0 LL 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland - #4_04_03_08 Type 1124-hr 100-Yr. 24-Hr. Rainfall=8.40` Prepared by {enter your company name here} Page 13 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Time span=2.00-120.00 hrs, dt=0.05 hrs, 2361 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method -Pond routing by Stor-Ind method Subcatchment 1S: Post-Dev. Runoff Area=12.050 ac Runoff Depth=6.36" Tc=20.0 min CN=83 Runoff=82.62 cfs 6.387 of Subcatchment 3S: Pre-Dev. Runoff Area=12.050 ac Runoff Depth=4.22" Flow Length=952' Tc=39.4 min CN=65 Runoff=36.36 cfs 4.238 of Pond 2P: Stormwater Wetland - #4 Peak Elev=304.89' Storage=82,755 cf Inflow=82.62 cfs 6.387 of Primary=12.08 cfs 4.438 of Secondary=54.08 cfs 1.936 of Outflow=66.16 cfs 6.374 of Total Runoff Area = 24.100 ac Runoff Volume =10.624 of Average Runoff Depth = 5.29" 70.00% Pervious Area = 16.870 ac 30.00% Impervious Area = 7.230 ac Stormwater Wetland - #4_04_03_08 Type 1124-hr 100-Yr. 24-Hr. Rainfall-8.40" Prepared by {enter your company name here} Page 14 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Subcatchment 1 S: Post-Dev. Post-Development Inflow to Pond #4 Drainage Area = 12.05 Acres Impervious = 60% Runoff = 82.62 cfs C~ 12.12 hrs, Volume= 6.387 af, Depth= 6.36" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Yr. 24-Hr. Rainfall=8.40" Area (ac) CN Description 7.230 98 Roads, Houses, Driveways 4.820 61 Managed Open Space 12.050 83 Weighted Average 4.820 Pervious Area 7.230 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, Tc from Storm Drain Calculations Subcatchment 1 S: Post-Dev. Hydrograph Runoff o° 80 ~ °~ Type II 24-hr 100-Yr. 24-Hr•. 75 ~' Rainfall=8.40" 70 65 Runoff Area=12.050 ac 55 Volume:-6,387 of .~i Runoff 50 . ~ ~ Runoff Depth_6:36" 0 45 " '~ Tc=20.0 min ~ 40 35 ~ ''N=83 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland - #4_04_03_08 Type 1124-hr 100-Yr. 24-Hr. Rainfall=8.40" Prepared by {enter your company name here} Page 15 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Subcatchment 3S: Pre-Dev. Post-Development Inflow to Pond #4 Drainage Area = 12.05 Acres °% Impervious = 60% Runoff = 36.36 cfs @ 12.37 hrs, Volume= 4.238 af, Depth= 4.22" Runoff by SCS TR-20 method, UH=SCS, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Yr. 24-Hr. Rainfall=8.40" Area (ac) CN Description 12.050 65 Woods/grass comb., Fair, HSG B 12.050 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 22.5 150 0.0400 0.11 Sheet Flow, Overland Sheet Flow Woods: Light underbrush n= 0.400 P2= 3.20" 16.9 802 0.0250 0.79 Shallow Concentrated Flow, Shallow Concentrated Flow Woodland Kv= 5.0 fps 39.4 952 Total Subcatchment 3S: Pre-Dev. Hydrograph wu ~ Runoff 38 36.36 cfs 36 ~~ Type II 24-hr 100-Yr.'24-Hr. 34 32 ~ Rainfall=8.40" 30 28 Runoff Area=12.05Q ac 28 Runoff Volume:=4.238 of 24. 22 Runoff Depth=4.22" 20 LL 18 ~' Flow Length=952' ,6 ~ Tc-39.4 min 14- ,2 CN_65 io 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Stormwater Wetland - #4_04_03_08 Type 11 24-hr 100-Yr. 24-Hr. Rainfall=8.40' Prepared by {enter your company name here} Page 16 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetland - #4 Inflow Area = 12.050 ac, Inflow Depth = 6.36" for 100-Yr. 24-Hr. event Inflow = 82.62 cfs @ 12.12 hrs, Volume= 6.387 of Outflow = 66.16 cfs @ 12.23 hrs, Volume= 6.374 af, Atten= 20%, Lag= 6.4 min Primary = 12.08 cfs @ 12.23 hrs, Volume= 4.438 of Secondary = 54.08 cfs @ 12.23 hrs, Volume= 1.936 of Routing by Stor-Ind method, Time Span= 2.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 304.89' @ 12.23 hrs Surf.Area= 33,106 sf Storage= 82,755 cf Plug-Flow detention time= 230.1 min calculated for 6.374 of (100% of inflow) Center-of-Mass det. time= 228.9 min (1,032.6 - 803.7 ) Volume Invert Avail.Storape Storage Description #1 302.00' 124,893 cf Custam Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft) 302.00 15, 713 1 , 076.0 0 0 15, 713 302.50 25,873 645.0 10,291 10,291 74,741 303.00 29,178 677.0 13,754 24,046 78,124 304.00 31,236 696.0 30,201 54,247 80,310 305.00 33,350 714.0 32,287 86,534 82,450 306.00 35,522 733.0 34,430 120,965 84,754 306.10 43,168 796.0 3,928 124,893 92,420 Device Routing Invert Outlet Devices #1 Primary 297.50' 15.0" x 70.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 283.00' S= 0.2071 '/' Cc= 0.900 n= 0.024 #2 Device 1 302.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 303.00' 18.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 304.00' 20.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=12.06 cfs @ 12.23 hrs HW=304.88' (Free Discharge) L =Culvert (Passes 12.06 cfs of 15.36 cfs potential flow) ~2=Orifice/Grate (Orifice Controls 0.39 cfs @ 7.99 fps) 3-Orifice/Grate (Orifice Controls 11.66 cfs @ 6.60 fps) econdary OutFlow Max=53.46 cfs @ 12.23 hrs HW=304.88' (Free Discharge) =Sharp-Crested Rectangular Weir (Weir Controls 53.46 cfs @ 3.07 fps) Stormwater Wetland - #4_04_03_08 Type 1124-hr 100-Yr. 24-Hr. Rainfall-8.40'' Prepared by {enter your company name here} Page 17 HydroCAD® 8.00 s/n 004959 ©2006 HydroCAD Software Solutions LLC 4/7/2008 Pond 2P: Stormwater Wetland - #4 Hydrograph ^ Inflow ^ Outflow Primary ^ Secondary N u 3 0 a o iu io zu za ~u :i5 au 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours)