Loading...
HomeMy WebLinkAbout20080440 Ver 1_Triage Comments_20080319-1~ Use this form instead of writing inside the foS ex c~PN ~ ~~ • ~~~' ~~~ ~ ~s ~S Triage Comment Sheet l~ MS ~ ~ cAL DwQ# 1-I ~~~ Triaged By: I ] Reviewer 1 !/ Date: Reviewer 2 ~-~ ~ ~x ~-. r. `-.s 5 ~ ~~ Date: -' ~ ~ ~ Reviewer 3 Date: ^ Issue Project (Reviewer 1) ^ Issue Project (Reviewer 2) ~ ~ Issue with conditions (Reviewer 1) r~~ ~ ~ CON ~ ~ 1)~.~ ~, Issue with conditions (Reviewer 2) Ml~~V, ' . -- d a 6 A DN ~. ~, 7 0 ~ ~ ~ LL ~ T~ ~.~ 1'~ G~Y~ C P r\ ~-, ~ t w t. ~ ~ ~ / ~r c ate' Yh -~-~ More Information (Reviewer 1) ^ More Information (Reviewer 2) Return Application (Reviewer 1) Send to Regions (Reviewer 1) ^ Return Application (Reviewer 2) Send to Regions (Reviewer 2) S:\Triage Forms\Triage Issue Sheet.doc PLEASE PRINT CLEARLY 08-0440 Bhangoo Property AML comments March 19, 2008 1. Per the requirements of the Neuse Riparian Buffer Rule, all stormwater drainage from the proposed dry detention basin must be discharged through a correctly designed level spreader. Level spreader design requirements are set forth in Chapter 8 of the North Carolina Stormwater BMP Manual, available at: http://h2o.enr.state.nc.us/su/bmp forms.htm. In order that the DWQ can review your diffuse flow plan, please provide a Level Spreader Supplement Form, including the Required Items checklist and all items listed therein. The Level Spreader Supplement Form is also available at the above web site. 2. Please provide documentation of the City of Durham's approval of the stormwater management plan for this project by providing EITHER: • A valid approval letter from the City of Durham indicating that the proposed activity has an approved SMP and one copy of the approved SMP, including plan details, calculations and other supporting information, OR • A set of stormwater plan details and calculations stamped as "Approved" by the City of Durham.