Loading...
HomeMy WebLinkAbout20080631 Ver 1_Triage Comments_20080410Use this form instead of writing inside the folder Triage Comment Sheet DWQ# ~y~yv G ~/ Triaged By: Reviewer 1 ~ ~ ~1,.r. Date: o ~ Reviewer 2 ~ Date: ~~ Reviewer 3 Date: ^ Issue Project (Reviewer 1) ^ Issue Project (Reviewer 2) ^ Issue with conditions (Reviewer 1) ^ Issue with conditions (Reviewer 2) ~j More Information (Reviewer 1) ^ Return Application (Reviewer 1) ^ Send to Regions (Reviewer 1) ^ Send to Regions (Reviewer 2) ~j More Information (Reviewer 2) `^~Return Application (Reviewer 2) S:\Triage Forms\Triage Issue Sheet.doc PLEASE PRINT CLEARLY . ~ (j~ 3/ Date: `~ ~ Who Reviewed: DWQ#~_---~--- ~ - ~ . ~ Plan Detail Incomplete hic ma for the project. ~} Please provide a location map/most recent NRCS soil survey map/USGS 1.24,OQQ~pegraF P ^ Please re-submit your site plans on full plan sheets at a scale of no smaller than 1"=50'. • ^ Please provide cross section details showing the provisions for .aquatic life passage. ^ Please provide the location of any proposed stormwa ter mana ement. devices as required by GCC . ^ Please provide plans and profiles for all the stormwa g ^ Please indicate all stormwater inlets and outfalls on the site plan. ^ Please provide an inventory of proposed project imp dewalks,eSravel surfaced areaseamenity areas, etc conditions. Please include all proposed building footprints, roads, driveway , g on the site fans. ^ Please provide building envelopes for all lots with wetlands, streams or buffers (or lots ~~ p ^ Please indicate proposed lot layout as an overlay on the site plan. ^ Please provide a signed and sealed geotechnical repoGuidelines for DrainaaetStudiesand H draulic Desil n, prepared by A L. report must comply with the Division of Ht~hwa s Hankins, Jr., State Hydraulics Engineer - 1999. ^ Please locate any planned sewer Lines on the site plan. standard format includes: scientific name, common name, ^ Please provide a detailed planting plan for ( source of the plant material, plant spacing, wetland indicator status, etc., as well as planting specifications). ^ Please indicate all proposed stream or wetland driveway crossings on your plan sheet (including future proposed). ^ Please indicate all stream impacts including all fill slopes, dissipaters, and bank stabilization on the site plan. ^ Please indicate all wetland impacts including fill slopes on the site plan. ^ Please enumerate all riparian buffer impacts on the site plan and clearly label impacts (Buffer Impact 1, etc.). ^ Please locate all isolated or non-isolated wetlands, streams, and other waters of the State as overlays on the site plan. ^ Please locate all of the protected riparian buffers as overlays on the site plan, clearly showing Zone 1 and Zone 2. Avoidance and Minimization ^ The labeled as on the plans does not appear to be necessary. Please eliminate the or provide additiona information as to why it is necessary for this project. ^ This Office believes that the labeled on the plans as can be moved or reconfigured to avoid the impacts to the . Please revise the plans to avoid the impacts. ^ This Office believes that the labeled on the plans as can be moved or reconfigured to minimize the impacts to the .Please revise the plans to minimize the impactsplease re-configure your proposed stream ^ Your proposed stream crossing appears to be aligned at approximately crossing to show it aligned approximately perpendicular (between 75° and 105°). Other ^ The application fee is insufficient because over 150 feet of stream and/or over 1 acre of wetland impacts were requested. Pease provide $ .This additional fee must be received before your application can be reviewed. ^ Please complete Section(s) __ on the application. ^ Please provide a signed copy of the application. ^ Please provide an agent authorization letter for the application signature. ^ Please indicate which 404 Permit the USACE has authorized for this project. ^ Please provide copies of the application, copies of the site plans or other supporting documentation. ^ Please resubmit copies of your information on the most current March 2005 Pre-Construction Notification form. You can download this format the following web addr"ess: htta'//h2o enr.stvia email t Sian mcm~llan(a~n~ et and provide a CD (TIFF ^ Please submit electronic CAD files showing Group 4 format (black and white, not grayscale or color)) along with your response to the add tream andrdownstream photos and ^ Please provide intermittent/perennial stream determination documentation on the site. (up DWQ stream identification forms). ^ Please provide a qualitative indirect and cumulative impact analysis for the project. Please see DWQ's policy for guidance on our website at: http://h2o.enr.state.nc.us/ncwetlands/documents/InterimInternalPolicyCumulativeImpact,doc ^ For areas in nutrient sensitive waters or buffered river basins fertilizer specifications for stormwater BMPs should state that that only an initial minimal application of fertilizer to establish the plants shall be used. ^ Please indicate whether or not the proposed impacts have already been conducted.. Mitigation ^ of compensatory mitigation is required for this project. Please provide a compensatory. mitigation plan. The plan must conform to the requirements of 15A NCAC 2H .0500 and must be appropriate to the type of impacts proposed. ^ Buffer mitigation is required for all road crossings that impact 150 linear feet of riparian buffer or more. Please submit a mitigation plan detailing the amount of buffer impact at crossing and how the impact will be mitigated. ^ Please provide documentation from the NCEEP indicating their willingness to accept your request to purchase (type of mitigation) credit to mitigate for the proposed (type of mitigation) impacts listed in your PCN application per section VIII, No. 2. Stormwater ^ Please provide BMP Supplement for the proposed on the site plan. ^ Please provide BMP Supplements for every proposed BMP on your site. The Supplement forms (including the Required Items Checklist) can be found at: http://h2o.enr.state.nc.us/su/bmp forms.htm. ^ Please use the most current version of the BMP Supplement available on the DWQ website at http://h2o.enr.state.nc.us/su/bmp forms.htm. The submitted version is outdated. ^ Please redesign your- BMP to comply with the 2007 DWQ Stormwater BMP manual (current revisions can be found at: http://h2o.enr.state.nc.us/su/bmp_forms.htm). ^ Please complete all items in Part I of the BMP Supplement form: Project Information. ^ Please include all information list in Part II of the BMP Supplement form: The Required Items Checklist was not included in your original submittal. ^ P-ease indicate the diffuse flow provision measures on the site plan and submit diffuse flow provision measure supplement forms (Supplement forms available on the DWQ website at http•//h2o enr state.nc.us/su/bmp forms.htm). ^ Please provide calculations to show the outlet velocity to ensure that anon-erosive velocity will be achieved for the 10-year storm. This should include the delineated drainage area, percent imperviousness, peak flow calculations for the 10- year storm, cross-section, and longitudinal slope. ^ The slope from the proposed level spreader(s) lip ( ) to the top of bank of the stream exceeds the maximum allowable slopes for level spreaders (6% for wooded vegetation and 8% for thick ground cover and grass). If an appropriate area for level spreader(s) cannot be found then another BMP such as a bioretention area must me proposed. Notes: V~ / ~ c~Z~/~- l~-~ /Iliw~ ~yi~ ~ ,S~e.S ~~ ~ /~US~ ~ ~!~/lvS (~-DG~vT Gt,c ~l ~ / !~/ ~ i~ev~7 i~r ~ i'[aw o ~ ~ C ret,.~. -~-~ 'f ~-~- G ~/ 5 ~~e y ~ T/~a. C~h G h n ~G (~ .. ~i ~/ !~,l.3 L S Li ~~~~e~c/ ~a n1 <- li S 7`~ ~~1~ ~w~S __rw~/1 S_ / ~- ~D/~-r~ SLv,I.~ ~~~5 ~ ~ai..~ G,.;i~y~ Gt +'~ l ~ ~ t ~~s %S ~~ 3G ~~/ Gva.`ki. /u'2.p L~,~i..'~c~io,~