HomeMy WebLinkAbout20080554 Ver 1_Triage Comments_20080410~'se this form instead of writing inside the folder
Triage Comment Sheet
.. .. ~ ~ ~ D~Q# Zvo$
Triaged By; ~ .
Reviewer I / at/lw'..._ ~ Date: `/
Reviewer 2 Date: ~ ~
Reviewer 3 Date:
~ Issue Project (Reviewer 1) ^ Issue Project (Reviewer 2)
^ Issue with conditions (Reviewer 1)
More Information (Reviewer 1)
^ Return Application (Reviewer 1)
. Send to Regions ~R.ev~~wer 1)
ore Information (Reviewer 2)
~ Return Application (Reviewer 2)
~ Send to Regions (Reviewer 2)
. S:1Triage Eorn~s\'Il~iage Issue Shec~doc
PLEASE PRINT CLEARLY.'
Date: Who Reviewed: ~ ~~
DWQ#: ~-csc~~
Plan Detail Incomplete
^ Please provide a location map/most recent NRCS soil survey map/USGS 1:24,000 topographic map for the project.
^ Please re-submit your site plans on full plan sheets at a scale of no smaller than 1"=50'.
^ Please provide cross section details showing the provisions for aquatic life passage.
^ Please provide the location of any proposed stormwater management practices as required by GC
^ Please provide plans and profiles for all the stormwater management. devices as required by GC
^ Please indicate all stormwater inlets and outfalls on the site plan.
^ Please provide an inventory of proposed project imperviousnesravel surfa ed areaseamenity areas, etc conditions. Please include
all proposed building footprints, roads, driveways, sidewalks, g on the site lans.
^ Please provide building envelopes for all lots, with wetlands, streams or buffers (or lots _ ) p
^ Please indicate proposed lot layout as an overlay on the site plan.
^ Please provide a signed and sealed geoof Hn hwarspoGuidelines for DrainaaetSt diesand Hodraulic Desil tie prepared byTA.L.
report must comply with the Division
Hankins, 7r., State Hydraulics Engineer - 1999.
^ Please locate any planned sewer lines on the site plan.
standard format includes: scientific name, common name,
^ Please provide a detailed planting plan for (
source of the plant material, plant spacing, wetland indicator status, etc., as well as planting specifications).
^ Please indicate all proposed stream or wetland driveway crossings on y nd bank stabili ation o tithe site planosed).
^ Please indicate all stream impacts including all fill slopes, dissipaters, a
^ Please indicate all wetland impacts including fill slopes on the site plan.
^ Please enumerate all riparian buffer impacts on the site plan and clearly label impacts (Buffer Impact 1, etc:).
^ Please locate all isolated or non-isola an bufferssastoverlays on the site plan, clearly showing Zone 1 and Zonee2 Ian.
^ Please locate all of the protected ripar
Avoidance and Minimization
^ The labeled as on the plans does not appear to be necessary. Please eliminate the or provide additional
information as to why it is necessary for this project.
^ This Office believes that the labeled on the plans as can be moved or reconfigured to avoid the impacts to the
Please revise the plans to avoid the impacts.
^ This Office believes that the Pleaselrevise the plans to minimize the mpa td or reconfigured to minimize the impacts to
the .Please re-configure your proposed stream
^ Your proposed stream crossing appears to be aligned at approximately
crossing to show it aligned approximately perpendicular (between 75° and 105°).
Other
^ The application fee is insufficient because over 150 feet of stream and/or over 1 acre of wetland impacts were requested. Pease
provide $ .This additional fee must be received before your application can be reviewed.
^ Please complete Section(s) __ on the application.
^ Please provide a signed copy of the application.
^ Please provide an agent authorization letter for the application signature.
^ Please indicate which 404 Permit the USACE has authorized for this project.
^ Please provide copies of the application, copies of the site plans or other supporting documentation.
^ Please resubmit copies of your information on the most current March 2005 Pre-Construction Notification form. You can
download this format the following web address: http //h2o enr st via email t ~ianl m_ cmillan(artncmail.net and provide a CD (TIFF
^ Please submit electronic CAD files showing
Group 4 format (black and white, not grayscale or color)) along with your response to the additional information requested.
^ Please provide intermittent/perennial stream determination documentation on the site.. (upstream and downstream photos and
DWQ stream identification forms).
^ Please provide a qualitative indirect and cumulative impact analysis for the project. Please see DWQ's policy for guidance on
our website at: http://h2o.enr.state.nc.us/ncwetlands/documents/InterimInternalPolicyCumulativeImpact.doc
^ For areas in nutrient sensitive waters or b~,ffZe d ore tablish the plants shall~ble utseds for stormwater BMPs should state that that
only an initial minimal application of fen
^ Please indicate whether or not the proposed impacts have already been conducted.
(/JI ~~ v
Mitigation
^ of compensatory mitigation is required for this project. Please provide a compensatory.
mitigation plan. The plan must conform to the requirements of 15A NCAC 2H .0500 and must be appropriate to the type of
impacts proposed.
^ Buffer mitigation is required for all road crossings that impact 150 linear feet of riparian buffer or more. Please submit a
mitigation plan detailing the amount of buffer impact at crossing and how the impact will be mitigated.
^ Please provide documentation from the NCEEP indicating their willingness to accept your request to purchase
(type of mitigation) credit to mitigate for the proposed (type of
mitigation) impacts listed in your PCN application per section VIII, No. 2.
Stormwater
^ Please provide BMP Supplement for the proposed on the site plan.
^ Please provide BMP Supplements for every proposed BMP on your site. The Supplement forms (including the Required Items
Checklist) can be found at: http://h2o.enr.state.nc.us/su/bmp forms.htm.
^ Please use the most current version of the BMP Supplement available on the DWQ website at
http://h2o.enr.state.nc.us/su/bmp forms.htm. The submitted version is outdated.
^ Please redesign your BMP to comply with the 2007 DWQ Stormwater BMP manual (current revisions can be
found at; http://h2o.enr.state.nc.us/su/bmp_forms.htm).
^ Please complete all items in Part I of the BMP Supplement form: Project Information.
^ Please include all information list in Part II of the BMP Supplement form: The Required Items Checklist was
not included in your original submittal.
~] Please indicate the diffuse flow provision measures on the site plan and submit diffuse flow provision measure supplement forms
(Supplement forms available on the DWQ website at http://h2o.enr.state.nc.us/su/bmp forms.htm).
^ Please provide calculations to show the outlet velocity to ensure that anon-erosive velocity will be achieved for
the 10-year storm. This should include the delineated drainage area, percent imperviousness, peak flow calculations for the 10-
year storm, cross-section, and longitudinal slope.
^ The slope from the proposed level spreader(s) lip ( ) to the top of bank of the stream exceeds the maximum
allowable slopes for level spreaders (6% for wooded vegetation and 8% for thick ground cover and grass). If an appropriate area
for level spreader(s) cannot be found then another BMP such as a bioretention area must me proposed.
Notes: