August 6, 2002
Mr. Riclc Shiver
N.C. Dept. Environment &. Natural Resources
Water Quality Regional Supervisor
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
RE: Middle Sound Sewer Project (Appeal)
Project #010093
Dear Riclc:
I am in receipt of your July 19, 2002 letter.
~. ! ,
~~ AUG - 82002 ,
_,. .~..,
i~ ~ ~ C -~~~ ~~~
t
CERTIFIED
In response, we will proceed with the portion of the project outside your
jurisdiction while we wait for our timely .appeal for a variance from the conditions in
your letter (anti-seepage de-ices, 25' set back, ferrous pipe).
In addition to the logical conclusions I stated in my June 10, 2002 letter, I
would like to add the following in considering the expeditious approval of my
variance request.
1) If the sewer main and rock bed will drain the creek and surrounding
area, exactly where will the ground water go? Also, what particular
projects in coastal North Carolina, installed below sea level, has this
phenomena happened?
2) I offer that short term impacts, as outlined in my June 10, 2002 letter,
do not justify long term cost in regards to the unsubstantiated set back.
r - -_. ___._ _..__. __..__._ ....._ __---_. ._.
August 6, 2002
Page Two
3) Ferrous pipe is not "better" than PVC with identical joint standards
when buried at the planned depths. Also, by today's material standards,
"0" infiltration is permitted, per specification. Any flow would be into
and not out of the gravity sewer pipe, under normal operation, when
considering the pressure differential between the ground surface water
and the gravity sewer pipe. ,
The linear. stream foatage a~ ~d proposals to minimize impact was addressed in
Tony Boahn's McKim &. Creed, June 12, 2002 and my aforementioned June 10,
2002 letters. Cost is always an issue when not fully justified, especially when using
the public's money.
In closing, I would like you to respond and address my variance request within
a legitimate time frame to be set up by you within the next three weeks. When
considering your approval of this variance, please feel free to call me regarding any
clarifications which you may need regarding my positions.
Sincerely,
~--' t~,a
ame .Craig, P.E.
Engineering Manager
New Hanover County
cc: Wyatt E. Blanchard, P.E.
Dave Weaver
Cyndi I<aroly
Danny Smith
Angie Pennock
Tony Boahn
Ed Brooks
JSC/aj