Loading...
HomeMy WebLinkAbout20070656 Ver 2_More Info Received_20080410L ITT /6,1 Wetland and Natural Resource Consultants, Inc. April 7, 2008 To: NC Division of Water Quality 401 Wetlands Unit Attn: Mrs. Cyndi Karoly 2321 Crabtree Blvd., Suite 250 Raleigh, North Carolina 27604 Re: Road and Dam Upgrade Project The Cliffs at High Carolina (+/-2100 acres) DWQ #07-0656 / Corps Action ID: 200701619 Buncombe County, North Carolina Cyndi: Ap R 1 0 2006 ??DSjA RBRR?? v+? This response letter and the enclosures are being submitted on behalf of The Cliffs Communities for the High Carolina project in response to the additional information request letter dated March 12, 2008 received from your office. Request For More Information, March 12, 2008: Additional Information Requested: 1. For the DWQ to consider this project a 'separate and complete "'project you w111 need to bridge all the crossings and apply for the impacts that facilitate the dam improvements only. Please note, bottomless culverts require approval from the DWQ or IVCDOT if they will ultimately assume maintenance of the culvert. Alternatively, you may submit your proposed impacts for Phase 1 of your project and conceptual impacts for the remaining phases through built-out. Response: The Cliffs Communities would like to proceed with permitting Phase 1 of High Carolina which includes two road crossings and dam upgrades. Enclosed are five copies of the conceptual master plan and five copies of the conceptual impact table for the remainder of the High Carolina project. Canton Office PO Box 882 Canton, NC 28716 828-648-8801 828-648-8802 Fax Thank you for your help with this project. Best regards, Jennifer L. Robertson Enclosures: Full Size Conceptual Master Plan Stream/Wetland Impact Tables Copies To: Corps - Lori Beckwith Canton Office PO Box 882 Canton, NC 28716 828-648-8801 828-648-8802 Fax High Carolina Impact Table Phase 1 Impacts Channel Impacts Site # Length ft. 1 90 3a 59 149 Wetland Impacts Site # Size ac. 2 0.014 3b 0.038 0.052 Impact 1 = Road Impact Impact 2 = Road Impact Impact 3a = Pond Maintenance Impact 3b = Pond Maintenance Conceptual Impacts Total Wetland Impacts (ac.): 0.197 Total Channel Impacts (ft.): 5548 Road Impacts Channel Impacts Site # Length ft. 4 80 5 80 5b 60 6 80 6b 60 7 40 8 80 9 80 10 80 11 80 12 80 12b 20 13 80 13b 40 14 80 14b 80 15 80 16 80 17 50 18 80 19 80 20 80 20b 20 21 b 20 21 80 22 20 23 80 23b 80 24 80 25 80 25b 40 25c 80 2130 Wetland Impacts Site # Size ac. 16a 0.135 Golf Impacts Channel Impacts Site # Length ft. 26 296 27 211 28, 507 29 144 30 497 36 694 37, 484 39 585 3418 Wetland Impacts Site # Size ac. 33 0.001 31 0.01 32, 0.013 34 0.024 35 0.01 38 0.004 0.062 Avoid & Minimize Channel Impacts Length ft. 40 80 41 80 42, 80 43 80 44 80 45 80 46 80 47 80 48 80 49 80 50 80 51, 80 960 0.135 O ap O O ' U = 1 M ~ c~ ~ c ~ c ~ o N i. , _ ~ U o mV ~ ~ ~ U ~Q~ L Z a = ~ 3 ~ ~ o ~ ~ z C ~ 1F N / A m ~ ~ N Q ~ ~ ~ •O y ~ i ~ j~ ~ , L ~ ~ o a ~ U ~ E ~ w o ~ ~ ~ ~ U ~ U ti / ~ ~ ~ V ~ _ ti r U H ~ L i ~ m E U ~ F W j ~ ~ o .3 m ~o a ~ J ~ ~ ~ ~ i J~ ON ~U ~ ' ~zo r ~o~ ~ ~ H ~ ~ ~U~O - - o0 ~ ~ iii. ~ 0000 oNo z b o ~ ~ as ~0 ~1 r ~ ~a ' 'd- ~ T„~, 0 0 L „ ~ a 0 N M 3 S ' 1 ~ I I~_ O °o ~ ~ T g ~ ~ . ~ „ ~ O ~ J a V (11 0 7 - }T Jr I T_ ~ I g 0 ~ o ~ ~ Z o M M M N C ~ ~ N M N w n ~I Z II