CONCURRENCE POINT 2A UPDATE AND PROJECT REVIEW
NEPA/404 MERGER TEAM MEETING MINUTES
NC 215 FROM US 64 AT CHERRYFIELD TO SR 1326
SOUTH OF BALSAM GROVE, TRANSYLVANIA COUNTY, NC
DATE:
SUBJECT:
PARTICIPANTS
August 20, 2007
NC 215 TIP R-2594, Transylvania County
Federal Aid Project No. STP 215(1), State Project No. 8.1000601
Donnie Brew
Sarah McBride
Marella Buncick
Karen Compton
Christopher Militscher
Kathy Matthews
Marla Chambers
Dave Baker
Brian Wrenn
Dewayne Sykes, P.E.
Tony Houser, P.E.
Jody Kuhne, P.E.
John Pilipchuk, P.E.
Neb Bullock, P.E.
Andrew Nottingham, P.E.
Elizabeth Lusk
Carla Dagnino
Ed Lewis
Michael Turchy
Jamie Wilson (via teleconference)
Joel Setzer, P.E. (via teleconference)
Mark Davis (via teleconference)
Artie Wilson (via teleconference)
Teresa Hart, P.E.
Stacy Oberhausen, P.E.
Ahmad Al-Sharawneh
Matt Wilkerson
Steve Whitley, P.E.
Mike Young, P.E.
FHWA
NC State Historic Preservation Office
US Fish and Wildlife
US Forest Service
US Environmental Protection Agency
US Environmental Protection Agency
NC Wildlife Resources Council
US Army Corps of Engineers
NCDENR Division of Water Quality
NCDOT Roadway Design Unit
NCDOT Roadway Design Unit
NCDOT Geotechnical Unit
NCDOT Geotechnical Unit
NCDOT Structure Design Unit
NCDOT Hydraulics Unit
NCDOT Natural Environment Unit
NCDOT Natural Environment Unit
NCDOT Human Environment Unit
NCDOT Natural Environment Unit
NCDOT Division 14 Construction Eng.
NCDOT Division 14 Engineer
NCDOT Division 14 Env. Officer
Transylvania County Manager
NCDOT PD&EA Branch
NCDOT PD&EA Branch
NCDOT PD&EA Branch
NCDOT Human Environment Unit
Ko & Associates
Ko & Associates
Suzanne Unger Young, P.E. Baker Engineering
Ken Gilland Baker Engineering
MAILING ADDRESS: TELEPHONE: 919-733-3141 LOCATION:
NC DEPARTMENT OF TRANSPORTATION FAX: 919-733-9794 TRANSPORTATION BUILDING
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1 SOUTH WILMINGTON STREET
1548 MAIL SERVICE CENTER WEBSITE: WWW.DOH.DOT.STATE.NC. US RALEIGH NC
RALEIGH NC 27699-1548
Meeting Summary
August 20, 2007
Page 5
proposed strictures lengths were based on the updated design. Also to bring the Merger Team
members up to date on the project since it had been several years since the team last met.
Marla Chambers stated that the main change was the piping of stream 31R. Marella Buncick stated
that an increase of 800 feet in linear stream impacts was substantial. Marla Chambers asked if
increasing the length of the bridge would lessen the impacts to the archaeological site. Matt
Wilkerson stated that since the impacts to Gloucester Gap Road were caused by the visual intrusion of
the bridge, increasing the length of the bridge would not reduce the impacts to the site.
Chris Militscher stated, and the rest of the Merger Team agreed, that they would sign the Concurrence
Form if NCDOT would stipulate that another meeting of the Merger Team would take place to discuss
cultural resource and detour issues, with the understanding that these issues might require a
reevaluation of agreed upon crossing structures, particularly the bridge over Big Mountain Branch.
NCDOT agreed to the stipulation and the Merger Team signed the form.
Additional Questions
After the Merger Team signed the document, additional project questions were asked. Marla
Chambers asked what would happen to existing NC 215 if the "New Location" option were chosen.
Since the purpose of the project was safety, she questioned if additional work would be required on
existing NC 215 in the future. Ken Gilland stated that there were several options for existing NC 21 S
if the "New Location" option were chosen, including removal from the state system. Jamie Wilson
stated that most of the people using NC 215 lived to the north of the project area and would use the
relocated NC 215 almost exclusively. Those still living on existing NC 215 are familiar with the road
and are used to the conditions there. DeWayne Sykes stated that the "New Location" facility would
provide a reasonable alternative to existing NC 215.
Marla Chambers asked if there were acidic soils in the project area. Jody Kuhne stated that they were
not. She also stated that there was a nearby bog turtle population, that the olive darter was found in
the North Fork of the French Broad River, and that many of the streams in the project area were trout
streams.
Dave Baker asked about the amount of waste associated with the project build alternatives. Based on
the preliminary design, the following wastes quantities were estimated:
New Location Alternate (40 mph design speed):
Cut = 5,158,000 cubic yards
Fi11= 1,840,746 cubic yards
Waste = 3,317,524 cubic yards
Improve Existing Alternate (40 mph design speed):
Cut = 8,794,000 cubic yards
Fi11= 72,000 cubic yards
Waste = 8,722,000 cubic yards
If you have any questions, please contact Ahmad Al-Sharawneh at 919-733-7844 Extension 258 or
Ken Gilland at 919-459-9035.
cc: Meeting Participants
NC 215 Improvements (R-2594) July 02, 2007
Culvert and Bridging Data
Stream Name (No.) Type & Length of the Existing Hydraulic Structure Required Hydraulic Cast of Structure Agreed on Length of Cost of Bridge Costs Sub•basin Best Drainage Average Linear Required Hydrauic
Existing Hydraulic Field Condifions Structure Hydrauic at 5104 2a meeting Proposed Proposed Beyood Hydraulic Usage Area Channel Stream Structure (Hydraulcs Report
'
Structure Structure Brid a ft * Brid a** Re uirements Class. S Miles Width Im acts or Crassin s OW
Ma
IMPROVE EXISTING ALTERNATIVE ft ft
d Ri
lE
h B
k h CMP wlconcrete headwall
24 i Good condition; level with streambed CMP extension 40 ft $2,000.00 Calvert Extension 6010105 C-Tr 0.03 3-4 40
ver
roa
UT to North For
Frenc
UT to North Fork French Broad Rivet 2E nc
18 inch CMP w/concrete headwall Good condition; 7 foot dro to streambed CMP Extension 60 ft $1,620.00 Calvert Extension 6010105 C-Tr 0.009 5-6 60
UT to North Fork French Broad River 3E 30 inch CMP Fair u stream to Good downstream ;level with streambed CMP Extension 40 ft $2,200.00 Culvert Extension 6010105 C-Tr 0.019 4-5 40
UT to Bi Bearwallow Creek 4E 24 inch CMP wlconcrete headwall Good u stream to Fair downstream ; 4 foot dro to streambed CMP Extension 20 ft $1,000.00 Calvert Extension 6010105 C-Tr O.D36 8 20
UT to Bi Bearwallow Creek SE 24 inch CMP Good condition; 0.4 foot dro to streambed Culvert Extension 30 ft $1,500.00 Calvert Extension 6010105 C-Tr 0.034 4-5 30
UT to North Fork French Broad River 6E 30 inch CMP Good condition; 0.3 foot dro to streambed 54" CMP Re lacement 150 ft) $11,520.00 Calvert Extension 6010105 C-Tr 0.18 4.5 10 W-5, 1 54" x 150' RCP Class
Little Bearwallow Creek l0E 42 inch CMP wlconcrete headwall Goad condition; level with streambed Bottomless Calvert $75,000.00 Bottomless Calvert 60 ft 6010105 C-Tr 0.29 8 60
'
'
Bi Bearwallow Creek 20E 72 inch CMP wlconcrete headwall Good wndition; level with streambed Bottomless Calvert $75,000.00 Bottomless Calvert 60 ft 6010105 C-Tr 0.95 l0 60 x T x 320
W-0, 1 12
RCE
UT to North Fork French Broad River 21 E 12 inch CMP wlconcrete headwall Good conditioq I foot dro to streambed CMP Extension 10 ft $230.00 Calvert Extension 6010105 C-Tr 0.039 6-8 10
UT to Bi Bearwallow Creek 22E 24 inch CMP w/wncrete headwall Fair u stream to Good downstream ; 0.3 foot dro to streambed No Extension Re aired $0.00 No New Structure 6010105 C-Tr 0.031 4-5 0
Bi Mountain Branch 30E 72 inch CMP wlconcrete headwall Good condition, 2 foot dr to streambed 72 inch CP Roadwa Relocated $0.00 Bride 675 $3,84Q,000.00 $3,840,000 6010105 GTr 0.72 10 0 W-3, 112' x T x 460' RCB(
UT to North Fork French Broad River 31 E 24 inch CMP Poor stream to Good downstream ; 8.5 foot dro to streambed No Extension R aired $0.00 No New Structure 60] 0105 C-Tr 0.014 5 0
UT to Nordr Pork French Broad River 40E 30 inch CMP Good condition; level widr streambed 30 inch CMP Roadwa Relocated $0.00 Bride 800 $3,240,000.00 $3,240,000 6010105 C-Tr 0.14 4.5 0 W-2, 54"x 430' RCP, Class
UT to North Fork French Broad River 4IE 24 inch CMP Good stream to Ve Poor downstream ;outlet not visible CMP Extension 40 ft $600.00 Culvert Extension 6010105 C-Tr 0.14 5 40
'
'
Jason Branch SOE 72 inch CMP wlconcrete headwall Good condition; 0.3 foot dro to streambed No Extension Re aired $0.00 No New Structure 6010105 C-Tr 0.45 7 0 W-1, 1 B
x T x I ]0
RCBC
' North Fork French Broad River 60E None None No Stmcture Re aired $0.00 No Structure Re aired 6010105 C-Tr 27 48 0
North Fork French Broad River 70E None None No Structure R aired $0.00 No Structure Re aired 6010105 C-Tr 32 51 0
North Fork French Broad River (BOE) None None No SWcture Required $0.00 No Structure Required 6010105 C-Tr 37 51 0
Total **** $7,080,000 370
NEW'LOCATION ALTERNATIVE
UT to Che reld Creek lR None None 36 inch CP for 140 ft $11,200.00 CP 6010105 C-Tr 0.042 2-0 140
'
'
'
N None 6 ft b 8 ft RCBC for 250 ft $312,500.00 Bride 225.00 $664,000.00 $551,500 6010105 C-Tr 0.89 10 0 x 370
RCBC
A-5, 3 8
x 6
Mason Creek lOR one 2 7 ft b 7 ft RCBC for 500 ft 250
000
00
$1 Bride 1
050.00 $5
208,000.00 $3,958,000 6010105 C-Tr 2.2 l3 0 A-0, 2 10'x 9' 440' RCBC
Che eld Creek 20R None None ,
.
, , ,
UT to Sawmill Creek 21R None None 36 inch CP for 640 ft $51,200.00 CP 6010105 C-Tr 0.044 2-4 640
"
'
UT m Sawmill Creek 30R Npne None 60 inch CP for 380 ft $76,000.00 CP 6010105 C-Tr 0.1 5.5 380 A-3, 160
x480
RCP Class V
UT to Bi Mormtain Branch 3l R None None 24 inch CP far 800 ft $29,250.00 CP 6010105 C-Tr 0.048 2-4 800
UT to Bi Mountain Branch 32R None None 36 inch CP for 350 ft $15,750.00 Brid ed with 4DR 6010105 GTr 0.052 2-0 0
"
'
N None 66 inch CP for 600 ft $I SQ,000.00 Bride 1,020.00 $5,712,000.00 $5,457,000 6010105 C-Tr 0.38 10 0 RCP, 5 ec Desi
A-2, 2 60
x 760
Bi Mountain Branch 40R
UT to Bi Mountain Branch 41R one
None None 30 inch CP for 500 ft $30,000.00 Brid ed with 40R 6010105 C-Tr 0.02 2-4 0
UT to North Fork French Broad River SOR None None 36 inch CP for 150 ft
h CP Por 170 ft
66 i $12,000.00
00
$51
000 CP
Bridge
160.00
$563
200.00
$S 12,200 6010105
6010105 C-Tr
C-Tr 0.047
0.41 5.5
7 150
0
A-1, (1) 8' x 6'560' RCBC
Jason Branch (60R) None None nc .
, , inn
* Estimated length subject to change with adjustments to roadway profile.
New Structure at 132+35 l0130+00 nOt a stream Crossing 665 feet
** Assumes budges with 30-foot widths Improve Existing (I t-foot lanes, 4-foot shoulders), 32-foot widths New Location (12-foot lanes, 4-foot shoulders)
Culvert Extension and Coucrete Pipe costs vary according the the type and diameter of the swcture
Box Culvert and Bottomless Culvert costs are $1250 per linear foot and Bridge costs are $80 per square foot.
*** Tributaries given same rating as the stream into which they flow.
**** Bridging is required for roadway alignnxnt issues as well as hydraulic needs.
r 1
Concrete Pipe Costs
Pipe Extension Costs
30-Inch Concrete Pipe (CP) - $60.00/ft 12-Inch Corregated Metal Pipe (CMP) - $30.00/ft
36-Inch CP - $80.OOlft I S-Inch CMP - $40.00/ft
42-Inch CP - $100.00/ft l8-Inch CMP - $SO.OOIft
54-inch CP - $160.00/ft 24-Inch CMP - $60.00/ft
60-Inch CP - $2DO.OOIft 30-Inch CMP - $70.00/ft
66-Inch CP - $300.OOlft 42-Inch CMP - $250.OOlft
72-Inch CP - $62D.OOlft 72-loch CMP - $4SO.OOIft
Black Bear Habitat ~' r'
~,~
,~ ~
~---
~~,, ,
~ ~ ~~ * ~
~~ ~.. _~,
~o
~' ~ ~ t
~~~ ..
r~o} i ~
,~
ti,:_,.
n n~ ~ ~'t:
(~
~ t
r- `-- _ ~ ~ ~--+tiJ
F^f ~,~ O
~i~ 1
~~ ,- ~! , ~
{~,~; ~ ~,-' 4~ti LEGEND
_~ ~ i
s-~ ~ • ,-. ~ , ` 0
s8f~r ,-.-~ ,A.r^'~~'~"~' '_ - ;lard Boundary
~~ ~ s ~
q~tirr i ~ County Boundary
Bear Habitat Capability
_ HCI>OS
O HCI 0 3-0 5
w~~ 20 0 2D 40 Miles ~ Hci<o3
Map 4.1 ProAUCad bythe USDA Forest Sernce, National Forests in North Carolina. August 200
A
I ~ ~ ; 60R
`'
~ t~
,
l~'
\
~ ,i
~ d ~ 31 R r X
i ,
^ d
~,
-+aoa ~ ~' I
(j~. , .>f,ha' , 1 50R Q~ ~
~
I
~ I
/
I
~ ~ . _: ,I
,
. 1•_ ~r Ir (
I rl i
C
J
80E / ~;; R _-
- _ Archaeological Sites 31N801/802
SI, r;r
111~~' ~
50E Y
'
"41 E f41Rr ,~' .:=~. -~--
`~
--' i 40R Mou
~ ,
n!etr>" 'la •_.w--..-. __,~, (• ~
tl I Archaeological Slte 31N859
Z`ti
~
~
,
~ I ~ / , L _ ~
--
'
`,
_',.~-`'`r~'' ' '
~
~\ till
~
. i,~" ._ nnG ~
31E ~' ~`,,I("
_ C '~
r
y
.
~
i.
1Pt ~ ,~ -~ RevlsedAltematlve3a is?ti ti
N^
~{
;~ c. 9
1R
sa
`l..
`ti
err =_
'C M:». -
.~~,:rl.~ - -
,v:
.~-~-
}~,, ,,
•;--
~'.~,
-l~ _-.~ 5
soE
Legend
Pisgah Parcels
., if
tinram Nmnhcr ti[rcam Name
IoF Ludc Bcmuallou~ Gcck
I IIR Mason Branch
IE l71'ro Nosh Fod: Frrcnch Brnad Rvcr
IR LII'w C'hcmticld Crcck
21iE Bq; Bcm~culloo Gcck
311R Clcmlicld Crcck
21E LrF w Nonlr Folk Fmxh Brood Rvcr zls Project Area
I R VT w Saomill Crock
2'_E LT w Big Mountain Branch
?E VT to North Furl: Frcrx:h Bro:ul River 5
3dE Bg Mounmm Bunch ~ sa
3UR lIf w Saurmll Crcck ~
JIE UTw ~IIE
31 R UT to Big Mounrmn Brwmh ._.
TfaBSYIVBRIa COUBtY
?R UT w Brg Mountain Bryuh -
;E UT w North Folk Frnxh Broad Rrvcr
dllE lIT w Nurdr Fork Fn:rn;h Bro:ul River
ddR Bg Mounlaln Branch
+IE UTwNnn,,Fnd:Frc„chBr.,adRivcr R-2594 Overview Map
J I R UT w Big Mountain Bimmh
rove Existin
NC 215 and
Im
JE llTwBigBwtral,o„crc~k g
p
,.1E ,,snn Bran°', Revised Alternative 3 Stream Crossings
?IIR
,E lT w North Fork Frci>ch Broad River
IfFweigBcm,callotvGcck
Transylvania County, North Carolina
611E Norilr Foik French Broad Ricer
Ii11R Jason Branch
(,E LT w No~ilr Fort: French Broad Rrvcr 'Z
000 ~
000 Q 2
00 4
0~~ 6
~~~
70E Nodh Fork French Brnad Ricer ,
,
,
,
,
tl11E Nash Foci. Frcrx;h Bra.~d Ricer Feet
Section 404/NEPA Merger Project Team Meeting
Concurrence Point No. 2a
Bridging and Alignment Review
Project No./TIP No./Name/Description
FA Project Number:
State Project Number
WBS Number
TIP Project Number
Project Description
STP-215(1)
8.1000601
34475.1.1
R-2594
NC 215 Improvements from US 64 to SR 1326.
Transylvania County, North Carolina
Based on the preliminary designs, preliminary hydraulics recommendations, Merger
Team analyses, and a project review and update, the members of the Merger Team have
concurred on this date of August 14, 2007 with the hydraulic crossing recommendations
listed on the attached spreadsheet and map.
"New Location" Alternative:
In summary, the stream crossings on the "New Location" alternative that require major
structures {Crossings 1 OR and 20R) will be bridged as will Crossings 40R and 60R.
Culverts or concrete pipes will be utilized for all other stream crossings on this
alternative, as listed in the enclosed spreadsheet.
"improve Existing" Alternative:
The major hydraulic structures on the "Improve Existing" alternative, where the proposed
roadway will be relocated (Crossings 30E and 40E), will be bridged. All other crossing
structures on the "Improve Existing" alternative will be extended or replaced, as
recommended in the enclosed spreadsheet.
USACE "~ ~.~~--
USEP ~--~ ~ ,
"""~~,
USDA-FS
NCDW
NCDCR
NCDOT G~~~~
USFWS ~~~!!4~. ~ ~~~"ti Y~
TVA
NCWRC~ '~ ~l 'rG~
FHWA Gi~l~t