HomeMy WebLinkAbout20080081 Ver 1_Staff Comments_20080305Staff Report
Project Num: 20080081 Version: 1
Name: 250-Million Gallon Reservoir Expansion, Franklin
Water Treatment Plant
County: Mecklenburg
Location: UT to Stewart Creek CTB Charlotte
Latitude: +35°16'53"
SW Plan Location:
Owner: Shearin, Barry
Contact Person: Shearin, Barry
Inspection Date: 09/05/2008
Reason for Inspection: Routine
On-Site Representative(s):
Primary Inspector: Alan D Johnson
Secondary Inspector(s):
Title:
Entry Time: 10:00 AM
Status: Received
Project Type: Sewer/Wastewater
Region: Mooresville
Longitude: -80°53'23"
Phone: 704-399-2551
Exit Time:
Inspection Type: Staff Report
Phone: 704-663-1699 Ext.2200
Question Areas:
N Site Visit
Inspection Summary:
stream appeared to be influenced from seeps coming from the upper resevoir. It was suggested that the pond be drained to see if
that would affect the channel. It did. The channel has been manipulated in the past either during construction of the original/existing
resevoir and "road" on site. Based on the site visit and subsequent follow up by S&ME. I have no problems with issuance of the
permit.
Page: 1
Project Num: 20080081 Owner: Shearin, Barry
Inspection Date: 09/05/2008 Inspection Type: Staff Report Reason for Visit: Routine
Site Visit Yes No NA NE
Do impacts described in the application differ those seen in the field? ? 0 ? ?
If yes,. please describe differences: see summary
Are the Intermittent/Perennial calls different in the application? ? E ? ?
If yes, please describe differences, and how mitigation ratios are affected:
Are there additional impacts not described in the application? 0 0 0 0
If yes, please describe and quantify:
Were the impacts in place prior to the application for the 401 Certification? 0 0 0 0
Additional conditions recommended for the Certification
Recommended project modifications:
Is this a modification request to an existing Certification? 0000
Are there additional stromwater conditions that should be required due to the following classifications: 0 ? ? ?
# 303(d)list, Class WS, NSW, ORW, HQW
Describe
Is this a subdivision or otherwise part of a larger project? M ? ? ?
# If yes, what phase is this?
Are there prior impacts from prior phases? 0 ? ? ?
If yes, what are the cumulative imacts for this project?
Possible secondary impacts noted:
Comment:
Page: 2