HomeMy WebLinkAbout20071815 Ver 1_Approval Letter_20080407O~O~ W A T ~9QG
~ ~
() 'C
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
Apri17, 2008
DWQ Project # 07-1815
Wake County
Mr. Robert Shank
1st American Builder
2514 Reliance Avenue
Apex, NC 27539
Subject Property:
The Meadows Subdivision
Richland Creek [030402, 27-21-(0.5), C, NSW]
Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse River
Buffer Protection Rules (15A NCAC 2B .0233) with Additional Conditions
Dear Mr. Shank:
You have our approval, in accordance with the attached conditions and those listed below, to place fill
within or otherwise impact 150 linear feet of intermittent stream and 8,030 square feet of Zone 1 Neuse
River basin protected riparian buffer, and 4,837 square feet of Zone 2 Neuse River basin protected
riparian buffer, as described in your application dated October 23, 2007, and received by the Division of
Water Quality (DWQ) on October 26, 2007, with additional information received by you on December
18, 2007, January 18, 2008 and March 20, 2008, to construct a residential subdivision at the site. After
reviewing your application, we have decided that the impacts are covered by General Water Quality
Certification Number(s) 3705 (GC3705). The Certification(s) allows you to use Nationwide Permit(s)
NW29 when issued by the US Army Corps of Engineers (USAGE). In addition, you should obtain or
otherwise comply with any other required federal, state or local permits before you go ahead with your
project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations.
Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as
depicted in your application shall expire upon expiration of the 404 or LAMA Permit.
This approval is for the purpose and design that you described in your application. If you change your
project, you must notify us and you may be required to send us a new application. If the property is sold,
the new owner must be given a copy of this Certification and approval letter and is thereby responsible for
complying with all conditions. If total fills for this project (now or in the future) exceed one acre of
wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A
NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached
certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http://h2o.enr.state.nc.us/ncwetlands
None Carolina
~tura"~~
1S` American Builder
Page 2 of 4
April 7, 2008
T e of Im act Amount A roved Units Plan Location or Reference
Stream -intermittent 150 (linear feet) PCN a e 8 of 13
Buffers Zone 1 8,030 (s uare ft.) PCN a e 12 of 13
Buffers Zone 2 4,837 (s uare ft.) PCN a e 12 of 13
2. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond
the footprint of the impacts depicted in the Pre-Construction Notification. All construction
activities, including the design, installation, operation, and maintenance of sediment and erosion
control Best Management Practices, shall be performed so that no violations of state water quality
standards, statutes, or rules occur.
3. Erosion and sediment control practices must be in full compliance with all specifications governing
the proper design, installation and operation and maintenance of such Best Management Practices in
order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated; and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control measures and
stormwater routing and treatment shall be on site at all times.
4. Sediment and Erosion Control Measures
Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum
extent practicable. If placement of sediment and erosion control devices in wetlands and waters is
unavoidable, they shall be removed and the natural grade restored within six months of the date that
the Division of Land Resources has released the project;
5. Culvert Installation
All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures
from the most current version of NCDOT Construction and Maintenance Activities manual
(http://www.ncdot.or doh/operations/BMP manual/download/BMP Manual.pdf)
such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent
excavation in flowing water.
Culverts required for this project shall be installed in such a manner that the original stream profiles
are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and
longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be
designed and installed to allow for aquatic life movement as well as to prevent head cutting of the
streams. If any of the existing pipes are or become perched, the appropriate stream grade shall be re-
established or, if the pipes installed in a perched manner, the pipes shall be removed and re-installed
correctly.
15` American Builder
Page 3 of 4
April 7, 2008
Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up
or down stream of the culvert(s). Existing stream dimensions (including the cross section dimensions,
pattern and longitudinal profile) shall be maintained above and below locations of each culvert.
Placement of culverts and other structures in waters, streams, and wetlands must be placed below the
elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20
percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow
passage of water and aquatic life. Design and placement of culverts and other structures including
temporary erosion control measures shall not be conducted in a manner that may result in dis-
equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the
above structures. The applicant is required to provide evidence that the equilibrium shall be
maintained if requested in writing by DWQ.
The establishment of native, woody vegetation and other soft stream bank stabilization techniques
must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is
necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of
Water Quality.
Installation of culverts in wetlands must ensure continuity of water movement and be designed to
adequately accommodate high water or flood conditions.
Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of
Completion" form to notify NCDWQ when all work included in the §401 Certification has been
completed. The responsible party shall complete the attached form and return it to the 401/Wetlands
Unit of the NC Division of Water Quality upon completion of the project. Please send photographs
upstream and downstream of each culvert site to document correct installation along with the
Certificate of Completion form.
6. Stormwater Management Plan Implementation Procedures (No Further Approval Needed)
• The approved SMP must be constructed and operational before any permanent building or
other structure is occupied at the site. If a development is phased, then the approved SMP for
each future phase must be constructed and operational before any permanent building or other
structure associated with that phase is occupied.
• The approved SMP as well as drainage patterns must be maintained in perpetuity.
• The SMP may not be modified without prior written authorization from the SMP approval
authority. If the SMP falls under another state stormwater program, then a copy of the
approval letter and the modified SMP must be submitted to the 401 Oversight/Express Unit
prior to the commencement of the modifications.
7. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within these
boundaries approved under this authorization shall be clearly marked with orange warning fencing
(or similar high visibility material) for the areas that have been approved to infringe within the
buffer, wetland or water prior to any land disturbing activities;
8. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules, and any subsequent modifications, the applicant is required to return the attached
151 American Builder
Page 4 of 4
Apri17, 2008
certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina
Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650.
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct
impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon
expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved wetland or
stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that
you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of
the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a
hearing.
Any disputes over determinations regarding this Authorization Certificate (associated with the approved
buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is
subject to review as provided in Articles 3 and 4 of G.S. 150B.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If Y9u have
any questions, please telephone Cyndi Karoly or Ian McMillan at 919-733-1786.
CHS/ijm
Enclosures: GC 3705
Certificate of Completion
Sincere ,
Coleen H. Sullins
cc: USACE Raleigh Regulatory Field Office
Lauren Witherspoon, DWQ Raleigh Regional Office
DLR Raleigh Regional Office
File Copy
Central Files
Pete Fraccaroli, BSC Group, 701 Corporate Center Drive, Raleigh, NC 27607
Filename: 071815TheMeadowsSD(Wake~01_NBR