HomeMy WebLinkAbout20041223 Ver 1_More Info Received_20040907Soil & Environmental Consultants, PA
11010 Raven Ridge Road Raleigh, North Carolina 27614 Phone: (919) 846-5900 Fax: (919) 846-9467
www.SandEC.com
~TLANDS ! 401 GRt~UP
SEP 0 7 2004
WATER QUALITY SECTION
USAGE
Attn: Ms. Jennifer Burdette
6508 Falls of Neuse Road
Suite 120
Raleigh, NC 27615
Dear Ms. Burdette and Ms. Edwards:
September 3, 2004
S&EC, PA Project #3985.W0
NCDWQ -Express Review
Ms. Debbie Edwards
2321 Crabtree Blvd.
Suite 250
Raleigh, NC 27604
Please find enclosed revisions to parts of our previously submitted application for a Nationwide
14 Permit and associated water quality certification for the Bedford at Falls River Phases 37, 38,
and 39. Revised requested impacts total 0 wetland impact, 293 feet of stream and 27,878 ft2 of
buffer impacts. These revisions were due to changes requested by DWQ that involved raising
headwalls, shortening pipes, and adding rip rap dissipaters:
Please call if you have questions regarding this application.
Sincerely,
Kevin Martin,
President
Attachments: PCN form (only pages with changes are being submitted)
Impact Maps (Sheets 1 of 3, 2 of 3, and 3 of 3)
Charlotte Office: Greensboro Off ce: Hickory Office:
236 LePhillip Court, Suite C 3817-E Lawndale Drive 622 Coon Mountain Lane
Concord, NC 28025 Greensboro, NC 27455 Taylorsville, NC 28681
Phone: (704)720-9405 Phone: (336)540-8234 Phone .(828)635-5820
Fax: (7041720-9406 Fax: (336)540-8235 Fax: (828)635-5820
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: Construction of two (2) road
crossings using typical grading equipment and meeting City of Raleigh Road Design standards.
2. Individually list wetland impacts below:
Wetland Impact
Site Number
(indicate on map)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(yes/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized cleanng, grading, tut,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://www.fema.QOV.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: 1.21 acres
(outside of buffers)
Total area of wetland impact proposed: 0 (for these phases)
3. Individually list all intermittent and perennial stream impact
Stream Impact
Site Number
(indicate on map)
Type of Impact* Length of
Impact
(linear feet)
Stre ame** Average Width
of Stream
Before Impact Perennial or
Intermittent?
(please specify)
1 FilUculvert 100 UT Neuse River 4' Perennial
2 FilUculvert IIT Neuse River 2' Intermittent
1 Riprap 25 UT Neuse River 4' Perennial
2 Rips 25 UT Neuse River 2' Intermittent
1 ear 13 UT Neuse River 4' Perennial
2 Clear 9 iTT Neuse River 2' Intermittent
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
Page 4 of 9
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.usgs.gov. Several Internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com,
www.ma~quest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 293' (current application)
Note• Stream importance calls were made by Todd Tugwell of the USACE on October 30,
2001 with Brad Suther of S&EC.
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below:
Open Water Impact
Site Number
(indicate on map)
Type of Impact* Area of
Impact
(acres)
Name of Waterbody
• (if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
* List each impact separately and identity temporary impacts. Impacts mciuae, nur are nor umrreo w: n,y cxcavauv,,, u«us~„s,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands
Describe the method of construction .(e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It maybe useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The client engineer S&EC and City of Raleigh had several meetings to discuss the proposed
aliment and minimization of avoidance All concurred that the proposed alignment and
Page 5 of 9
impacts are justifiable A road crossing in phase 42 (shown as 41 on attached overall map) was
eliminated at the request of DWQ and the Corps in order to minimize overall impacts.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000,. mitigation will be required when
necessary to ensure that adverse .effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan. or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http•//h2o enr state.nc.us/ncwetlands/strmgide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), .and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
If mitigation is required the client proposes payment to the NCEEP at a 1:1 ratio for the 148'
of.perennial stream impact at Area #1 Buffer mitigation should not be required because
impacts for crossings are below DWQ buffer mitigation thresholds
Page 6 of 9
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCM. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet): 148'
Amount of buffer mitigation requested (square feet): 0
Amount of Riparian wetland mitigation requested (acres): 0
Amount ofNon-riparian wetland mitigation requested (acres): 0
Amount of Coastal wetland mitigation requested (acres): 0
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federaUstate) funds or the use of public
(federaUstate) land?
Yes ^ No
If yes, does the. project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ^ No ^
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ^ No ^
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the .applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact .protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ® No ^ If you answered "yes", provide the following information:
Page 7 of 9
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet) Multiplier Required
Mitigation
1 18295 3 0
2 9583 1.5 0
Total 27878 0
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additiona120 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration /Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
None required
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Impervious surface is below 30% (see sheet 1 of 3) according to engineers calculations (i.e.
27 2%) The project will comply with City of Raleigh requirements. Calculations and locations
of level spreaders for providin¢ diffuse flow are enclosed. -
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Municipal -
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ^ No
Is this an after-the-fact permit application?
Yes ^ No
Page 8 of 9