HomeMy WebLinkAbout20050399 Ver 1_Certification of Completion_20071002
~. ~ Group, ~n~.
LA N a iP LA N N I N G
CI~/IL ENGIN1=E21NG
LAND ~ U 2~/ EY I N G
Transmittal
TO: 401 Oversight/Express Permit Unit
North Carolina Div. of Water Quality
2321 Crabtree Blvd., Suite 250
Raleigh, NC 27604
ATTN: Permit Certifications
DATE: October 1, 2007
PROJ. NO: 500-093
RE: Brooks Creek Subdivision
401 Water Quality Certification
DWQ Project # 05-0399
II Quantity I Drawing No. I Description ~I
1 Signed 4/17/07 Original Certification of Completion for DWQ Project # 05-0399
1 copy Dated 4/4/05 Copy of April 4, 2005 original wetland permit from NCDENR -DWQ (FYI)
REMARKS
DWQ - I was just going thru my files and I am not sure this was ever sent to DWQ in April 2007. It might
have fallen thru the cracks between my client and me as to who was going to send this in.
If you have already received this, please disregard. If you have not received this yet, please file it and I
apologize for the lateness. Please call me if you have any questions. Thank you.
CC: ~ ~~ P,~ ~ ~~n~ CE Group, Inc.
i5 ~' V ~ Signed
~ ~ T Q ~ 2007 Mike Zaccardo, P.E.
D9 ADD 5T042~,1~!AT6i't BRANCH
11000 Regency Parkway, Suite 410 Cary, N.C. 27518 919-367-8790 ext. 105 voice 919-367-8791 fax
mike@cegroupinc.com -email
JOHN LEGGETT & COMPANY Fax ~ 919-469-4778 Feb 15 ' 07 18 09 P. 07
Certification of Completion
DWQ Project No.: ~~ `-03 g ~ County, ~~/G --
Applicant: ~2. /~' ,,Siu.~1~r/ ~' 0 /"OGi~~.~~1~~ v~V L L C'
Project Name: ,~/Z4oi~s ~~2.~y ~v~w~S~dw --
Date of Issuance of Wetland Permit: ~~~ , `r ~~ ~~
v~,c Zoe Zoo S~~i~-~o
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certlflcatlo~a and Buffer Rules, and any
subsequent~rrcodifications, the applicant is required to return this certificate to the 401 Oversig(,t/F,tcpress Permitting Unit,
North Carplina Division of Water Quality, 1650 Mail Service Centex, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. Zt is not necessary to send
certificates from all of these.
Applicant's Certif::cation
I, ,hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality CertiBcatioa and Buffer Rulea, the approved plans and specifications,
and other supporting materials.
Signature:
Date:
Agent's Certification
I, , hereby state that, to the best of my abilities, due raze and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and speei~eations,
and other supporting materials.
Signature;
Dace:
If this project was designed by a Certified Professional
I, ~ `~~j~ V Gi~l~r~i~~0 as a duly registered Professional 6~~`r'~~•e. ngineer,
• in the State of North Carolina, having been authorised to observe (pert ,
weekly, full time) the construction of the project, for the l'ermittee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality (:ertiticatlon and Huffer Rules, the approved plans and
specifications, a er s pporti aterials. ,/
Signature: Registration No. Q~23Z Date y ? ~