Loading...
HomeMy WebLinkAbout20080603 Ver 1_CAMA Application_200804020 8- 0 6 0 3 ~~~'~ ~~_ NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor James H. Gregson, Dt'rector Wiliam G. Ross Jr., Secretary March 25, 2008 MEMORANDUM: TO: Ms. Cyndi Karoly Environmental Biological Supervisor Division of Seater ~ualit,T FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit App ~ ~ ~~'~~/ "J ~pR ~ 2008 _. DtN~ - VVti1 tR c?uAUi r Ub'ETLANDS AND STDRMir1ATER BRANCH lication Review Applicant: Graydon and Melba Tripp Project Location: 551 Neptune Drive, Cape Carteret, Carteret County Proposed Project: The applicant is proposing to install 2 new slips with the installation of a boatlift in one slip area, maintenance excavation of an access channel and the existing high ground basin, new dredging at the west side of the existing basin, construction of a high ground deck and two retaining walls. Please indicate below your agency's position or viewpoint on the proposed prof ect and return this form by 4/15/2008. If you have any questions regarding the proposed project, please contact Heather Styron at (252) 808-2808. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 400 Commerce Avenue, Morehead City, North Carolina 28~~7 Phone: 252.808.28081 FAX: 22.247.33301 Internet: www.nccoas~almznagemen~.ne~ An E~u31 Opporturnty 1 A~uma'rve Action Emplpyer - 50'•, FiacyCled 1 10°b Post Cons_~zr Pape' MAJO PER1ti1IT FEE i~iAT~IX ~~~ ``~ `J r~ - ~ \~ ~Y3~:~.P%.~;.,~4~~~^'~-~:'?.^_Fs~:r".~~,z"~a."^`'. _.'g ..~c'9gS~~' w~ ' "' :aa " Selection Devaluprr:Cl:t Typo ~ r-ee aCr~ ~Q ~ ~j4 /('~ '^",""`"• °IO ('14300 16Q1 x35100093 1625 6253} (24300 1602 435100a9:i 2341) I. Private, non-commercial development that does not $~50 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or o en water areas: It. Public or commercial development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or o en water areas: IIL For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below a lies: III(A). For Private non- commercial development, if $250- 100% ($250) 0% ($0) General Water Quality Certification No. 3301 (see attached can be a lied: I II(B).-For public or commercial development, if $400 100% ($400) 0% ($0) General Water Quality Certification No. 3301 (see attached can be a lied: III(C). If General Water `- Quality Certification No. $400 60% ($240) 40% ($160) 3301 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or a vatic life: III(D). If General Water L. Quality Certification No. $400 60% ($240) 40% ($160) 3301 (see attached) cannot be a lied: IV, For development that involves the filling and/or $475 60% ($285) 40% ($190) excavation of more than one acre of wetlands and/or o en water areas: ~~ ~ DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Graydon and Melba Tripp C/o Kathy Vinson 2. LOCATION OF PROJECT SITE: 551 Neptune Drive, Cape Carteret, off of Yaupon Drive, off Hwy 24 in the western part of Carteret County. Photo Index - 2000: 39-494 grid (N-14)(P-14) 2006: 39-8057 grid (I-11)(I-12)(J-11)(J-12) State Plane Coordinates - X: 2584351.283 Y: 344594.099 Rover # J011509A LAT 34°40'51.96831 LON 77°03'22.21256 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 1/15/08 Was Applicant Present -Yes 5. PROCESSING PROCEDURE: Application Received - 1/22/08 Office -Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan -Cape Carteret Land Classification From LUP -Residential (B) AEC(s) Involved: CW, PTA, EW, ES (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing -none Planned -none (F) Type of Structures: Existing -basin, existing bulkhead, dock and 3 boatlifts at the east side of the basin. Planned -maintenance excavation of the existing high ground basin and access channel. New dredging within the basin on the west side, install a bulkhead, 2 new slips with one having a boatlift, construct a high ground deck and retaining wall (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: DREDGED FILLED OTHER (A) Shallow Bottom 984 ft2 N/A N/A (B) Public Trust Area N/A N/A 144 ft2 Incorp. (C) High Ground 900 ft2 7075 ft2 N/A (D) Coastal Wetlands 423 ft2 N/A N/A (D) Total Area Disturbed: 9526 ft2 (E) Primary Nursery Area: No (F) Water Classification: SA, ORW Open: Yes 8. PROJECT SUMMARY: The applicant is proposing to insta112 new slips with the installation of a boatlift in one slip area, maintenance excavation of an access channel and the existing high ground basin, new dredging at the west side of the existing basin, construction of a high ground deck and two retaining walls. Graydon and Nlelba Tripp Page 02 9. Narrative Description: The Melba and Grayden Tripp project is located at 551 Neptune Dr. in Cape Carteret, Carteret County. Neptune Dr. is found by turning south off of Hwy 24 east onto Yaupon Drive then west at the second entrance for Neptune Drive. The site lies on the north side of Bogue Sound in this area. The subject property is 38,158.6 square feet in its entirety and ranges from 2'to 5.7' in elevation above NHW. There are not any structures on the high ground portion of the site. Along the shoreline of this property is a 15 wide by 180' long fringe of Coastal Marsh that contains Smooth Cordgrass (~artina alterniflora). The high ground portion of the track is vegetated with Loblolly Pine (Pinus taeda) and Wax Myrtle (Myrica cerifera). There is an existing basin, which is shared by the applicants and the adjacent owner. The basin currently measures 210' in length and and at its widest point 50' narrowing to 37'. The current channel measures 115' in length and 130' narrowing to 65' in width. At this time the adjacent owner currently has 3 existing boatlifts, and a bulkhead. The applicant wishes to add two slips on their side of the basin with the total for the basin becoming five. They are also asking for vinyl bulkhead, high ground deck, a boatlift, a high ground retaining wall parallel and alongside the high ground deck and an additional retaining wall on the southwest corner of the property to help prevent storm water from affecting the neighbor to the west. The shoreline has a total length along the NHW line of 285 ft. There are single-family homes with private docks on both sides of the proposed project along Bogue Sound. The Division of Water Quality classifies this area as SA, ORW waters. This area is not a Primary Nursery Area. No shellfish or SAV's were observed during site visits. This portion of Bogue Sound is open to the taking of shellfish and is roughly a mile wide in this area. Cape Carteret's Land Use Plan dated 2007 classifies this area as Residential. There are no shellfish leases in this area. 10. Proiect Description: This property shares an existing high ground basin with the adjacent property to the east. The adjacent owners currently have three existing slips with boatlifts, dock and bulkhead. In order for the applicants to have slips within the existing basin they are proposing two additional slips and also to maintenance excavate the basin and channel, perform new dredging for the new slip areas, install a 300' bulkhead, a 6'x60' high ground deck, install a 12'x12' boatlift in one of the new slip areas, construct a high ground retaining wall measuring 70'x1' parallel and along the sides of the high ground deck, and an additional 50' x 1' retaining wall on the southwest corner to prevent storm water from affecting the neighboring property to the west. Graydon and IVlelba Tripp Page 03 In order to accomplish what is proposed the applicants are proposing to use a track hoe for the excavation with the spoils stored a minimum of 30' above NHW. They are asking to maintenance dredge the existing basin and channel. The basin is irregularly shaped and measures 210' in length and 50' at its widest point. The narrowest portion is 37'. The access channel is 115' long and at its widest point is 130' with it narrowing to 65'. They are also proposing new dredging in a small fringe of coastal wetlands. In order to accomplish this, they are requesting to excavate a 7' wide fringe of Coastal wetlands for a length 60'. The cubic yards to be excavated for the total project will disturb 1179 ft2, which includes the high ground excavation. Water depths in the existing basin are at -2.3' NLW. The final depth for the excavation area in the existing basin will not exceed -3.9 feet below NLW. The channel is at a depth of -2.5' and will be -3.9' at NLW when the project is complete. The connecting waters are at a depth of - 3.9ftbelow NLW. Substrate composition is mostly silt. The applicant is also requesting a vinyl bulkhead measuring 300'. It will be installed along the eastern and southern shorelines of the property. It will be installed landward of the NHW and remaining coastal wetlands. Two retaining walls are also being proposed. One retaining wall measuring 50'x 1' and will be installed on the southwest upland corner to help prevent storm water from impacting the neighboring property to the west. The second retaining wall will be installed parallel and along side the high ground deck which will be 6' x 60' at grade near the head of the basin. A 12' x 12' boatlift is requested for part of this area where the high ground deck is being proposed. A second smaller area at this deck is also being requested as a wet slip. 11. Anticipated Impacts: This proposed installation of the new boatlift and pilings would result in temporary turbidity and would incorporate 169 square feet of Public Trust Area. An increase in turbidity will also occur during excavation and incorporate 984 ft2 of shallow bottom. The area proposed for excavation is a silt shallow bottom habitat. A small fringe of coastal marsh would be excavated during this project and would incorporate 423 ft2. However there should be no adverse impacts. Through site observation and aerial photos this small fringe volunteered after the high ground basin was dredged in. There is not a potential to impact SAV's or shellfish with docking ingress and egress due to the lack of SAV's and shellfish in this area. Heather Styron Morehead City March 24, 2008 COASTAL PLANNING SERVICES, INC. Kathy B. Vinson, AICP Comprehensive Land Use Planning and Development Assistance P.O. Box 827 Morehead City, NC 28557 Office 252.354.4916 Cell 252.240.9297 March 17, 2008 Ms. Heather Styron NC Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Re: Major Permit Application Graydon and Melba Tripp 551 Neptune Drive Cape Carteret, NC Dear Heather: Enclosed are the revised Major application forms, narrative, and project plans that you requested for this project when we met on March 12. Also enclosed is a copy of the recorded subdivision plat for the Cape Carterett Subdivision, dated June 11, 1964. The highground basin currently located adjacent Lot #5 (the Tripps' property) and Lot #6 in Block Q is not shown on this plat. The current area of the basin is shown as high ground on the original plat. We appreciate all of your help with this project. Please call me at 252-240-9297 if you have questions or need additional information. Sincerely, ~~C~ ~,G-utter,-~, Kathy B. Vinson, AICP Enclosure(s) ~~ ~~ ~q~3 a FnrJ 3~;~; ACM rr-1 ArPLICAfl,N for Mee Der~lopm~t Permlt ~~t grog, North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Infon»ation Business Name Project Name (if applicable) N/A n/a Applicant 1: First Name MI Last Name Graydon W. Tripp Applicant 2: First Name MI Last Name Melba Tripp If additiona! applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 105 Marion Drive Greenville NC ZIP Country Phone No. FAX No. 27858 USA 252 - 756 -4422 ext. n/a 252 - 756 -4422 Street Address (~f different from above) City State ZIP n/a - Email trippg@suddenlink. net 2. AgenlbContractorlnformation Business Name Coastal Planning Services, Inc. AgenU Contractor 1: First Name MI Last Name Kathy B. Vinson AgenU Contractor 2: First Name MI Last Name n/a Mailing Address PO Box City State P.O. Box 827 827 Morehead City NC ZIP Phone No. 1 Phone No. 2 28557 0827 252 - 354 - 491 6 ext. 252 - 240 - 9297 ext. FAX No. Contractor # 252 247-5875 n/a Street Address (-f different from above) City State ZIP n/a - Email kbvinson@ec.rr.com <Form continues on back> ~ ~~ ;-- 1 ~ a a ~~-" .~ ~;__ . 3 ?~~. 3~.~t ;0~~,,~„~, ._ T Form DCM MP-1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret 551 Neptune Drive n/a Subdivision Name City State Zip Cape Carteret Subdivision Part-B Section IV Cape Carteret NC 28584 - Phone No. Lot No.(s) (rf many, attach additional page with list) n/a - - ext. 19, a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Bogue Sound c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ^Manmade ^Unknown Bogue Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ^No work falls within. Town of Cape Carteret 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 285' 38,158.6 sq. ft. c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or 38,158.6 sq. ft., NWL (normal water level) (Jf many lot sizes, please attach additional page with a list) 5' ®NHW or ^NWL e. Vegetation on tract Grass, trees, and shrubs f. Man-made features and uses now on tract none g. Idenfdy and describe the existing land uses adJacent to the proposed project site. Single-family residences are located on either side of property. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? R-20 Single-family residential (Attach zoning compliance certficate, if applicable) ®Yes ^No ^NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ^Yes No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. Yes No NA If yes, by whom? n/a I. Is the proposed project located in a National Registered Historic District or does it involve a ^Yes ®No ^NA National Register listed or eligible property? <Form continues on next page> m. p) Are tnere wetianas on (ii) Are there coastal wetlands on the site? (iii) If yes to either (i) or (ii) above, has a delineation been conducted? (Attach documentation, if available) ®Yes ^No ^Yes Q ..~ ~,. -, ~. ~, b~ ); Form DCM MP-1 (Page 3 of 5) APPLICATION for Major Development Permit n. Describe existing wastewater treatment None. o. Describe existing drinking water supply source. None. p. Describe existing storm water management or treatment systems. None. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ^Commercial ^PubliUGovernment ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Project will allow for daily boating use of existing highground basin. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. A trackhoe will be used for excavation and a bulldozer will spread spoils on-site. One trackhoe and one bulldozer will be stored on-site. d. List all development activities you propose. Maintenance excavation of boat basin and access channel and additional new excavation of basin, installation of bulkhead and boat lift, construction of high-ground deck and retaining wall, and application of fill (de-watered spoils) in low areas of lot. e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 7,075 ®Sq.Ft or ^Acres g. Will the proposed project encroach on any public easement, public accessway or other area ^Yes ®No ^NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Surtace water run-off to Bogue Sound. i. Will wastewater or stomtwater be discharged into a wetland? ^Yes ®No ^NA If yes, will this discharged water be of the same salinity as the receiving water? ^Yes ^No ®NA j. Is there any mtigation proposed? ^Yes ®No ^NA If yes, attach a mitigation proposal. <Form continues on back> 6. Additionallnformation In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (t) arse always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plts,,drawinga to_distinguish between work completed and proposed. -`~~' ~. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site- 3 _ . ~_,;; ~~N ,, Form DCM MP-1 (Page 4 of 5) APPLICATION for Major Development Permit d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Paxon McLean Holz Phone No. 252-393-8144 Address 106 Manatee Street, Cape Carteret, NC 28584 Name Joyce M. Brogdon Phone No. 252-393-8839 Address 553 Neptune Drive, Cape Carteret, NC 28584 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, pemtittee, and issuing dates. General CAMA permit #42701 issued to Bill and Paxon Holz on 11/11/2005. General CAMA permit #47372 issued to Paxon Holz on 11/02/2006. h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. ~ 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date -March 17, 2008. Signature Print Name -Kathy B. Vinson w ~"~ ~ ;~~ Please indicate application attachments pertaining to your proposed project. ~~.,<+~' _ °' i~;r' ®DCM MP-2 Excavation and Fill Information pDCM MP-5 Bridges and Culverts +~D~~~'t~~~.xa~s ~.,Ix .: Form DCM MP-1 (Page 5 of 5) APPLICATION for Major Development Permit ®DCM MP-3 Upland Development ®DCM MP-4 Structures Information ~., t ~`~ -_ d~~ f~.. PROJECT DESCRIPTION Graydon and Melba Tripp Carteret County March 17, 2007 The proposed project will allow for daily boating use of an existing highground boat basin located at 551 Neptune Drive, Cape Carteret, North Carolina. The project site is located adjacent Bogue Sound and is currently undeveloped. The property shares an existing high-ground basin with the adjacent property located to the east. The basin was dug from high ground portions of the two lots that now share the basin. The two residential lots adjoining the basin are shown on the original subdivision plat for the Cape Carterett Subdivision Part-B Section IV, Block Q as Lots 5 and 6. The plat, recorded on June 11, 1964, does not show the basin. The current area of the basin is shown as high ground areas of Block Q, Lots 5 and 6 on the original plat. The neighbor on the east has an existing bulkhead, dock, and three boatlifts in the basin. There are no existing structures on the west side of the basin adjoining the Tripps' property. General permits have been issued in recent years to the adjacent neighbor for maintenance excavation of the basin and channel, but it is our understanding that the work was not performed. The Tripps are applying for permits to maintenance excavate the basin and access channel and perform new dredging within the basin near their property, install a bulkhead and boatlift, and construct ahigh-ground deck and adjacent retaining wall. The project also includes spreading de- watered dredge spoils on the high-ground area of the Tripps' property. As previously noted, the shared boat basin currently contains three boat lifts/slips for use by the neighboring property owner. The proposed work will accommodate two additional boats on the west side of the basin, for a total of five boat lifts/slips in the shared basin. The irregularly shaped high-ground boat basin measures 210' in length and at the widest point will measure 50'. The narrowest portion of the basin will measure 37' in width. The access channel is 115' long and measures 130' narrowing to 65'. A trackhoe will remove a total of 984 cubic yards of sand and mud below Normal High Water for the access channel and boat basin. High-ground excavation will remove 195 cubic yards of sand and mud. Approximately 47 cubic yards of spoil material will be deposited on the project site in an area located more than 30' from the shoreline and will be contained by a sediment fence until dry. Once dry, the de-watered spoils will be spread on low areas of the property and will also be used as backfill for the bulkhead. The remaining spoils (approximately 1132 cubic yards) will be trucked off-site to apre-approved disposal site. The applicants are requesting to dredge a fringe of coastal wetlands measuring approximately 60' in length near the head of the basin. The wetlands appear to have "volunteered" after the basin was dredged from high ground. The purpose of dredging in this area is to allow sufficient width to maneuver a small boat within the basin and to avoid the boat lift pilings from infringing upon the one-quarter rule for construction within a water body. Representatives of the NC Divisions of Marine Fisheries and Water Quality have been on-site tp g ;; ~ .~ review the wetland fringe proposed for dredging. It is our understanding from the on-site ,, ~ ~ ~. ., ~ ., ., .- :r~ ~ ~,. ~ll'_ ... - .. Project Description March 17, 2008 Page Two meetings that the representatives will not object to dredging in the wetland fringe. Approximately 423 square feet of wetlands will be impacted by the work. It should be noted that a much wider area of coastal wetlands adjoins the Tripps' property near the mouth of the basin, as shown on the project plans. No excavation within the wider area of wetlands is proposed. A high-ground deck measuring 6' x.60' is proposed for construction "at grade" near the head of the basin. The deck will be used for access to the proposed boatlift measuring 12' x' 12'. A second small boat will be accommodated by use of a spring line attached to the deck. A retaining wall (72' x 1') is proposed for installation parallel and along the sides of the high-ground deck. A vinyl bulkhead measuring 300 linear feet will be installed along the eastern and southern shorelines of the property. The bulkhead will be installed landward of Normal High Water and the remaining wetlands. An additional retaining wall measuring 50' x 1' will be installed on the southwest upland corner of the property to prevent stormwater from adversely affecting the neighboring property to the west. ~, ~ ~; .. ~~ Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel NLW Canal Boat Basin Boat Ramp Rock Groin Rock (excluding ( or Breakwater shoreline NWL stabilization Length 115' n/a 210' n/a n/a n/a n/a 130' Width narrowing to n/a S0' narrowing ' n/a n/a n/a n/a 65' to 37 Avg. Existing ' Depth _2.5 NLW n/a -2.0' n/a NA NA n/a Final Project ' Depth -4.0 NLW n/a -3.0' n/a NA NA n/a 7. EXCAVATION a. Amount of material to be excavated from below NHW or NWL in cubic yards. 984 cY c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ®CW 423 ^SAV ^SB ^WL ®None (ii) Describe the purpose of the excavation in these areas: A fringe of coastal marsh is proposed for excavation to provide adequate width in basin to maneuver small boats and to avoid boatlift from exceeding 1/4 width of basin. ^This section not applicable Type of material to be excavated. mud and sand d. High-ground excavation in cubic yards. 195 cy 2. D/SPOSAL OF EXCAVATED MATERIAL ^This section not applicable a. Location of disposal area b. Dimensions of disposal area. Approximately 47 cy yards will disposed on-site. The 22' x 52' for onsite disposal of 47 cy. The off-site disposal remaining spoils (approximately 1132 cy will be trucked off- areas for the remaining 1132 cy will consist of .5 acre. site to apre-approved disposal site. c. (i) Do you claim title to disposal area? ®Yes ^No ^NA (ii) If no, attach a letter granting permission from the owner. e. (i) Dces the disposal area include any coastalwetlands/marsh (CW) submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ^CW ^SAV ^SB ^WL ®None (ii) Describe the purpose of disposal in these areas: n/a d. (i) Will a disposal area be available for future maintenance? ^Yes ®No ^NA (ii) If yes, where? n/a (i) Does the disposal include any area in the water? ^Yes ®No ^NA (ii) If yes, how much water area is affected? .- . ~ m`~Y ,~y~~~, t ~~` 11. ,~ ~ _ - ~ ~,„+ a ,. f 3. SHORELINE STABILIZATION ^This section not applicable (!f development is a wood groin, use MP-4 -Structures) a. Type of shoreline stabilization: b. Length: 300' ®Bulkhead ^Riprap ^BreakwatedSill ^Other: Width: 1' c. Average distance waterward of NHW or NWL: 0 d. Maximum distance waterward of NHW or NWL: 0 e. Type of stabilization material: vinyl sheet pile. g. Number of square feet of fill to be placed below water level. Bulkhead badcfill 0 Riprap n/a Breakwater/Sill n/a Other n/a i. Source of fill material. Dried spoils from basin. f. (i) Has there been shoreline erosion during preceding 12 months? ^Yes ®No ^NA (ii) If yes, state amount of erosion and source of erosion amount information. n/a h. Type of fill material. de-watered dredge spoils ~. OTHER FILL ACTIVITIES ^This section not applicable (Excluding Shoreline Stabilization) ~. (i) Will fill material be brought to the site? ^Yes ®No ^NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (ii) Amount of material to be placed in the water n/a (iii) Dimensions of fill area n/a (iv) Purpose of fill n/a submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ^CW ^SAV ^SB ^WL ®None (ii) Describe the purpose of the fill in these areas: n/a I5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Silt fencing, seeding, and mulching. Trackhoe c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project ^Yes ®No ^NA site? ^Yes ®No ^NA (ii) If yes, explain what type and how they will be implemented. (ii) If yes, explain steps that will be taken to avoid or minimize n/a environmental impacts. n/a March 17, 2008 Date Project Name Graydon and Melba Tripp AP plicant Name p plicant Si ture `;~~~ . ~ .~~_ r ~ ~ !' a. r ~, fi 1 ~~iS1'>~ ~ 9~ 't "'. Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT Type and number of buildings, facilities, units or structures proposed. One high-ground deck measuring 6' x 60' is proposed for construction "at grade" adjacent the proposed boat lift. A retaining wall measuring 72' 1' is proposed for installation parallel and along the sides of the highground deck. An additional retaining wall measuring 50' x 1' will be installed on the southwest upland corner of the property to prevent stormwater from adversely affecting the neighboring property to the west. b. Number of lots or parcels. c. Density (give the number of residential units and the units per acre). n/a e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land-disturbing activity begins. (i) tf applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ^Yes ^No ®NA (ii) If yes, list the date submitted: n/a g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built-upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. Less than 1 %. i. Give the percentage of the entire tract to be covered by impervious and/or built-upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 0% j. Describe proposed method of sewage disposal. None. I. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges). Surface runoff to Bogue Sound. d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. 7075 sf (0.16 acre) f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. No impervious surfaces proposed. h. Projects that require a CAMA Major Development Permit may also require a stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ^Yes ®No ^NA (ii) If yes, list the date submitted: _n/a k. Have the facilities described in Item (i) received state or local approval? ^Yes ^No ®NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater ,- U ;~ design? ~ ' ^Yes ®No ^NA <"' If yes, attach appropriate docu ntation. rhi e:, ~ sa~~. ~ ~~~3 ~~~ a: ~ m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) None. o. When was the lot(s) platted and recorded? June 11, 1964 March 17, 2008 Date Project Name Graydon and Melba Tripp ap plicant Name ~. l/~~~ p pli ant Sign t re n. (i) Will water be impounded? ^Yes ®No ^NA (ii) If yes, how many acres? n/a p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ^Yes ^No ®NA ,E_-~,..--_, s., i~ x;, ,~~~i; _ t' - g 4~q gy~ <~~~~ ~~F Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS ^This section not applicable a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ^Commercial ^PubliGGovemment ®Private/Community ^Yes ®No c. (i) Dock(s) andlor pier(s) (ii) Number 0 (iii) Length n/a (iv) Width n/a (v) Floating ^Yes ®No e. (i) Are Platforms included? ^Yes ®No If yes: (ii) Number n/a (iii) Length n/a (iv) Width n/a (v) Floating ^Yes ®No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 2 new slips for total of 5 slips in shared basin (ii) Number of slips existing 3 in shared basin d. (i) Are Finger Piers included? ^Yes ®No If yes: (ii) Number n/a {iii) Length n/a (iv) width n/a (v) Floating ^Yes ®No f. (i) Are Boatlifts included? ®Yes ^No If yes: (ii) Number 1 (iii) Length 12' (iv) Width 12' h. Check all the types of services to be provided. ^ Full service, including travel lift and/or rail, repair or maintenance service ^ Dockage, fuel, and marine supplies ® Dockage ("wet slips") only, number of slips: 5 ^ Dry storage; number of boats: ^ Boat ramp(s); number of boat ramps: ^ Other, please describe: i. Check the proposed type of siting: ® Land cut and access channel ^Open water; dredging for basin and/or channel ^Open water; no dredging required ^Other; please describe: k. Typical boat length: 20' to 24' m. (i) Will the facility have tie pilings? ^Yes ®No (ii) If yes number of tie pilings? n/a j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). open runabout i ~~,1 . `~' .~, I. (i) Will the facility be open to the general public?`~" ' ^Yes. ®No ~ 2. DOCKING FACILITY/MARINA OPERATIONS ^This section not applicable ~ a,/`e. ~ o ~ ~~n ~pa.s,' ~ ~ ~ Cons~i"Kc7`- 0.- -~ a~ %.-~ ~ a. Check each of the following sanitary facilities that will be included in the proposed project. ^ Office Toilets ~`Cv ^ Toilets for patrons; Number: ;Location: ~~ ^ Showers y~, ^ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. n/a c. Describe the disposal of solid waste, fish offal and trash. n/a d. How will overboard discharge of sewage from boats be controlled? n/a e. (i) Give the location and number of "No Sewage Discharge" signs proposed. n/a (ii) Give the location and number of "Pumpout Available" signs proposed. n/a f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. n/a g. Where will residue from vessel maintenance be disposed of? n/a h• Give the number of channel markers and "No Wake" signs proposed. 0 i. Give the location offuel-handling facilities, and describe the safety measures planned to protect area water quality. No fuel-handling proposed. j. What will be the marina policy on overnight and live-aboard dockage? n/a k. Describe design measures that promote boat basin flushing? Proposed water depths in basin are equal to or shallower than the adjoining waters of Bogue Sound. If this project is an expansion of an existing marina, what types of services are currently provided? n/a m. Is the marina/docking facility proposed within a primary or secondary nursery area? QYes ®No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ®Yes ^No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (V11L)? if any boxes are checked, provide the number of square feet affected. ®CW 423 ^SAV ^SB - A" ,.~~ QWL ^None ' ': '~.. .. xri ~~. ~ ~t ~~l,C. ~~ p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ^Yes ®No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. n/a 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ^Commercial ^PubliGGovernment ^Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. {i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): b. Number ^Commercial ^PubliGGovernment ^Private/Community c. Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. e. Arc of the swing 7, GENERAL a. Proximity of structure(s) to adjacent riparian property lines Outermost piling of boat lift is 18' from adjacent riparian property line. Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 50' at boat lift location e. (i) Will navigational aids be required as a result of the project? ^Yes ®No ^NA (ii) If yes, explain what type and how they will be implemented, b. Proximity of structure(s) to adjacent docking facilities. 40' to closest boat lift in adjacent property's docking facility. d. Water depth at waterward end of structure at NLW or NWL 3.0' 8. OTHER - > ' :; rThis section not applicable ~~ a. Give complete description: One highground deck measuring 6' x 60' is proposed for construction "at grade" adjacent the proposed boatlift. The deck will be used to moor one boat by use of a spring line in addition to the boat to be stored on the proposed lift. A retaining wall measuring 72' x 1' is proposed for installation parallel and along both sides of the highground deck. An additional retaining wall measuring 50' x 1' will be installed on the southwest upland corner of the property to prevent stormwater from adversely impacting the neighbor to the west. March 17, 2008 Date Project Name Graydon and Melba Tripp plicant Name ~~ JJ U~ ;~ P pli nt Signa e ~. _ .. _. ~ ~;; Y,,y