HomeMy WebLinkAbout20071634 Ver 1_Certification of Completion_20080331o~CF ~~I A TF9oG
>_ ~W~ 1
O 'C
D\ti Q Project No.: (~0 3
Applicant: N C061-
Project Name: ~G.~~ ~Jih3ww~~ !' Sficea.~I•w•k ~ Der~••i elm. 4~ 1dCt~'~- '~~
Date of Issuance of 401 \Yater Quality Certification: (J~~ 0? a~' V~I
CN ar~~ (~ ~/q~ic ~C r
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting
Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form
may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. ]t is not
necessary to send certificates from all of these.
Applic:wt's Certification
I, ~ W • ~ bw""~" ~ ,hereby state that, to the best of my abilities, due care and diligence
vas used in the observation of the construction such that the construction .vas observed to be built ~+•ithin st.-bstantial
compliance and intent of the 401 \\'ater Quality Certification and Buffer Rules, the approvcd plans and
specifications, and other supporting materials.
Signature: ~ .1~ ~ ,-- ~ Date: 211 ~ ~g
Agent's Certification
I, ,hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and- intent of the 401 \Vater Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: Date:
Engineer's Certification
Partial Final
I. , as a duly registered Professional Engineer in the State of North
Carolina, havins been authorized to observe (periodically, ++•eekly, full time) the construction of the project,for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction +vas observed to be built within substantial compliance and intent of the 401
\~'ater Quality Certification and Buffer Rules, the approved plan; and specifications, and other supporting materials.
Signature Registration No.
Date
Qi r~
~'
~idfr.. ~Q~?~
~4,~~~~T~'~i~TgCi ~,.
~BRe.._ ,
Tra~srora5cn Pz.-r;`iry U .ii
1510 ~U-;~ C-'/'r., Cc---'n• .. ~'c ;~h. ~1^r?1 (`q,~!~^~ ?7F0~].lf, ~r?
r;tic_: r.: r;,;i i~coirr„+y~:~ra;-.odollr~t:rct:nttDJ~nZO.enr.s!at?.n~~.us/ncw2t12nd5
titichael F. Easley, Governor
1:'Jilliam G. Ross Jr., Secretary
North Carolina DapaRment of Environment and (`Ja:ural Resources
,..... .tc..:~i
Division of Water Quality
County: ~
An =_G:al O;por:uni~~JAY.r^utve Action Em,'vy=.r -SO',o Ree~•feJ10°; Post Co^sumer Paper