HomeMy WebLinkAbout20071470 Ver 1_EEP Acceptance Letters_20070723PROGRAM
July 18, 2007
Steve Dewitt, P.E.
NC Turnpike Authority
5400 Glenwood Avenue, Suite 400
Raleigh, NC 27612
Project: Western Wake Expressway County: Wake
The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to
accept payment for impacts associated with the above referenced project. Please note that this decision does not assure that
the payment will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the
applicant to contact these agencies to determine if payment to the NCEEP will be approved.
This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of
the issued 404 Perrmt1401 Certification/CAMA permit within this time frame, this acceptance will expire. It is the
applicant's responsibility to send copies of the permits to NCEEP. Once NCEEP receives a copy of the permit(s) an invoice
will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized
work. The amount of the In Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and
policies listed at www.nceep.net.
Based on the information supplied by you the impacts that may require compensatory mitigation are summarized in the
following table.
Cape Fear
03030002 Stream (feet) Wetlands (acres) Buffer I
(Sq. Ft.) Buffer II
(Sq. Ft.)
Cold Cool Warm Riparian Non-Riparian Coastal Marsh
Impacts 0 0 4,910 6.56 6.94 0 0 0
Credits 0 0 9,820 13.12 13.88 0 0 0
Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation. If the regulatory agencies
require mitigation credits greater than indicated above, and the applicant wants NCEEP to be responsible for the additional
mitigation, the applicant will need to submit a mitigation request to NCEEP for approval prior to permit issuance. The
mitigation will be performed in accordance with the Memorandum of Understanding between the N. C. Department of
Environment and Natural Resources and the U. S. Army Corps of Engineers dated November 4, 1998.
If you have any questions or need additional information, please contact Kelly Williams at (919) 716-1921.
Sincerely,
WilliD. Gilmore, PE
Director
cc: Cyndi Karoly, NCDWQ Wetlands/401 Unit
Eric Alsmeyer, USACE-Raleigh
Linda Fitzpatrick, NCDOT
Beth Harmon, NCEEP
File
kmtoY' E .. Pro" our .ftA fift
North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 91 9-71 5-0476 / www.nceep.net
r '11V_
A?Ji
svstem
Mmement
PROGRAM
July 18, 2007
Steve Dewitt, P.E.
NC Turnpike Authority
5400 Glenwood Avenue, Suite 400
Raleigh, NC 27612
Project: Western Wake Expressway County: Wake
The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to
accept payment for impacts associated with the above referenced project. Please note that this decision does not assure that
the payment will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the
applicant to contact these agencies to determine if payment to the NCEEP will be approved.
This acceptance is valid for six months from the date of this letter and is not transferable. Uwe have not received a copy of
the issued 404 Permit/401 Certifiication/CAMA permit within this time frame, this acceptance will expire. It is the
applicant's responsibility to send copies of the permits to NCEEP. Once NCEEP receives a copy of the permit(s) an invoice
will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized
work. The amount. of the In Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and
policies listed at www.neeep.net.
Based on the information supplied by you the impacts that may require compensatory mitigation are summarized in the
following table.
Cape Fear
03030004 Stream (feet) Wetlands (acres) Buffer I
(Sq. Ft.) Buffer Il
(Sq. Ft.)
Cold Cool Warm Riparian Non-Riparian Coastal Marsh
Impacts 0 0 5,149 4.25 2.39 0 0 0
Credits 0 0 10,298 8.50 4.78 0 0 0
Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation. If the regulatory agencies
require mitigation credits greater than indicated above, and the applicant wants NCEEP to be responsible for the additional
mitigation, the applicant will need to submit a mitigation request to NCEEP for approval prior to permit issuance. The
mitigation will be performed in accordance with the Memorandum of Understanding between the N. C. Department of
Environment and Natural Resources and the U. S. Army Corps of Engineers dated November 4, 1998.
If you have any questions or need additional information, please contact Kelly Williams at (919) 716-1921.
Sincerely,
b.
Willi Gilmore, PE
Director
cc: Cyndi Karoly, NCDWQ Wetlands/401 Unit
Eric Alsmeyer, USACE-Raleigh
Linda Fitzpatrick, NCDOT
Beth Harmon, NCEEP
File
X"bring... Ep ... Prot Our Stag
2644 6L
North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 / www.nceep.net