Loading...
HomeMy WebLinkAbout20041000 Ver 1_Certification of Completion_20080401~y - t~~~ DEPARTMENT OF THE ARMY WILMINGTON 151STRICT, CORPS OF ENGINEERS 151 PATTON AVENUE ROOM 208 ASHEVILLE, NORTH CAROLINA 28801-5006 REPLY TO ATTENTION OF: Permit Number: 200431112 Permit Type: GP30 ;. Name of County: Caldwell Name of Permittee: Fred W. Craig Date of Issuance: July 20, 2004 Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: U.S. Army Corps of Engineers Attention: CESAW-RG-A 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 Please note that your permitted activity is subject to a compliance inspection by an U.S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocaticn. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and conditions of the said permit, and required mitigation was completed in accordance with the permit conditions. Sign ture of mittee ~. `~ ~.. -~ Date Certifi~~cate of Completion DWQ Project No.: '~ ~ ~ ~ ~ ~ 6 County: G(. l .GtJ E'. l Applicant: ~~L-' ~ ~~Jt i ~ (_~-- Project Name: (fit- f ~ ~' e- Date of Issuance of 401 Water Quality Certification: #~ Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1 I, ,hereby state that, to the best of my abilities, due care and diligence was used in the o ation of the construction such that the construction was observed to be built within substantial complian e and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials:. Signature:~~i~do ~„ Date: ~ - g' b~ Agent's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No.: Date: