Loading...
HomeMy WebLinkAbout20041787 Ver 1_Certification of Completion_20050118"' .. Steve Summers Construction, Inc. P.O. Box 1282 Cary, NC 27512 919-859-6418 January 15, 2005 Room Addirions * Remodeling * Stucco Mr. Bob Zarzecki N.C. Division of Water Quality Wetlands/401 Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Re: DWQ Project # 04-1787 Dear Mr. Zarzecki: ~~ ~ ~1AN 1 8 200 DENR - vVA't'~R QUALITY WETLANDS ANL S~+CRMVNATER BRANCH Per the terms of the Additional Conditions of the Minor Variance Approval Certification dated 11/30/04, we have completed the following: 1. Three (3) Azalea shrubs (3ga1) have been planted within the retained portions of the protected buffers. 2. Diffuse flow devices have been installed on the ends of the two (2) gutter downspouts. The devices uncoil and discharge the water in a sprinkler pattern through a series of holes along the uncoiled tube. 3. The Certificate of Completion is enclosed. Thank you for your assistance in this matter. Sincerely, Steve Summers CC: Mr. Mike Horan N.C. Division of Water Quality Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 JAN-7.4-2D05 ].5:41 FRDM:DWD-WETLANDS 9197336893 :_ - TD:98596418 P:2~2 Celrtilficate of Completion DWQ Project No.: O `{ ~' (~ $ ~ County: vJ a k e. I,~ppl.icant• E r~~ C. ~ S d c~ i= ~ v 1 ~L ~• e r Pry ject Name: t \ O F~ \ -F e vv~ o o r G o ~ ~ -1-' a.~ ~ ~- Z-I S I AAte of Issuance of A01 Water Quality Certification: ~ ((3 0 ~ 0 4 Upon. cotnplcaon of al.l work approved within the 401 Water Quality Certification and Buffer Rules, and an.y subsequent modifications, the applicant is zequired to return this certificate to the 4UllWetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center., Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer, It is not necessary to send certificates from all of these. A,pplicar~t's Certification I, ,hereby state that, to the best of my abilities, duo care and diligence wac used in the observation of the construction such th..at the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification. an..d Buffer Rules, the approved plans and specifications, and other supporting materials. Siga,ttture: Date: A,gent',r Certt~cation 1~ S-E' e.re r. ~ . S ~ ~- ~ e. r s ,hereby state that, to the best of my abilities, due care and dili.gcnce was used in the observation of the construction sucl? that the construction was observed to be built within substantial compliance and intent of the 401 Water. Quality Certification and Buffer Rules, the a.pprovcd plans alnd specifications, and other supporting .m..aterials. Si.gnaturc: ~~~ tnlA l~_y,,,,~,~ u~ Dace: ~I '~ IO j Go ~..-F v U C'Eo v i It}C~ G~~ ,~ f this ,project was designed by a Certified Professional 1, , as a duly registered Professional (i.e., Engi.nccr, Landscape Architect, Sw-veyor, etc.) in the State of North Carolina, having been authorized to observe (peri.odically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the hest of my abilities, due case and diligence wa& used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Ccrti:ficadon and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No.: Date: