Loading...
HomeMy WebLinkAbout20021743 Ver 1_Certification of Completion_20030805Boone, NC V~ ~ ~ LETTER OF TRANSMITTAL Date: 07/30/03 Project No.: B03015.3 To: 401 /Wetlands Unit From: Mike Trew NC Division of Water Quality 1621 Mail Service Center Raleigh, NC 27699-1621 Boone, NC Office RE: Rhymer Property WE ARE SENDING YOU: Copies Date No. Description 1 7/30/03 Certificate of Com let ,, ~„ TRANSMITTED: ® FOR YOUR USE/FILE ^ FOR APPROVAL ^ AS YOU REQUESTED ^ FOR REVIEW/COMMENT ^ FOR SIGNATURE ^ AS REQUESTED BY: ^ FOR YOUR INFORMATION ^ FOR REMARKS: VIA: ®lsr CLASS MAIL ^FAX ^HAND DELIVERED ^PICK UP ^ COPY: Stewart Rhymer 671 West King Street Suite A - PO Box 349 Boone, North Carolina 28607 Phone (828) 262-1767 -Fax (828/ 265-2601 E-mail (general) mesco@boone.net To contact our Engineers via a-mail: engineers-mesco@boone.net To contact our Surveyors via a-mail: surveyors-mesco@boone.net __ YETI' ~aS 1 X41 rAI~R~ DWQ Project No.: _ 0 217 4 ~ Applicant: Stewart Rhymer Project Name: au~ ~~ ~ County: Watauga DATER QUpIITY SECTION Stewart Rhymer Property, 8980 US Hwy 421 S. Deep Gap, NC 28618 Date of Issuance of 401 Water Quality Certification: November 18, 2002 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: A en,t's Cc~ tifcrtion Date: i, -.______ ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substanti ~.omplie: ~e anc int:;nt of the 401 Water Quality Ce!-tificaden and Buffer Rules, the approved plans and specifications, and o±her supporting materials. Signature: Engineer's Certification Partial x Final Date: I, Michael P . T r e w , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically,~l~l~ 1{ll~€) the construction of the project,for the Permittee hereby state that, to the best of abilities, due care and diligence was used in the observation of the construction such that the constructio observed to be built within substantial compliance and intent of the 401 Water Quality Certific~t~ d Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. 1818 6 Date ~- 3a • 0 3