HomeMy WebLinkAbout20021585 Ver 1_Certification of Completion_20040210t
BORUM. WADE AND ASSOCIATES. P. A.
ENGINEERS -PLANNERS -SURVEYORS
405-D PARKWAY, GREENSBORO, NC 27401
P.O. BOX 14215, GREENSBORO, NC 27415-4215
PHONE: 336/275-0471 -FAX: 336/275-3719
TO: 401/WETLANDS UNIT
NC DIVISION OF WATER QUALITY
1621 MAIL SERVICE CENTER
RALEIGH, NC 27699-1621
DATE: 1-29-04
RE: CANDACE RIDGE
(X) herewith ( )under separate cover
For Your:
( ) approval
( ) review & comment
(X) use
TRANSMITTAL LETTER
~IET-..ANC1S ! d.~~ ~POl1P
FEB 1 0 2004
~IATEP i~~lALI'Iv SECTION
i ne rouowmg:
Copies Date Descriptions
1 CERTIFICATION
Remarks:
THANKS,
SENT BY: MATT WILLIAMS, P.E. COPY T0:
14
.~~-
~.
~r
0~ U8:OSa David Michaels
D\VQ Project Nn
oa i sus
County
336-G76-11£37
G u, ~1~~
Applicant: _ ~~Wd~?- 2/~'O' /'!'I~f l~~/, LLI,
Project Namc; _ ~G/LGt 4LQ -- i~01 -- -
P
`!
~~~~~ ~
v
Date of Issuance of -f01 ~'~'ater Quality Certification: __ I "_~_~~ ~ -
Cel<•tificate of Completion
l:pi>n complztion of all •.~•ork appre~~ed ~~ithin the -t01 `h`ater t7uality Certification or applicable Buffer Rules, and any subsequent
modifications, the applic;utt is required to return this certificate to the =Olr'~Vetlands Unit, ~torth Carolina Dirision of 1~'ater
Quality, I6? 1 ?~~fail Service Center, Ralci`?h, 1\C. 27699-162l. This form ma}' I?e return.d to D~4`Q by the applic: nt, the
applicant's authon~ed went, or the project erSinecr. It is not necc'ticar~• fo s~nd cernticates from all of thCCe.
~pplicant'c Certification
t _ _____ . Itercliy stare that. to thz beat of my abilities, dui care find diligence wss
used in the c~bser~•atic?n oft ;e construction such that the cen£.tructiun was observed to be built within substantial
cc mpli:in~e ;tnd i~t~nt cal tits DUI ~~`ater Quality (~.Cr1111CaC101t gad I;uffer Rules, the ;;ppro~ed plant and specifications,
,.n~i ~.~llt~_r ••_~rp~ortin~ materi: !s.
I7ut~:
~~cnt's Ccrtific:rtion
i _ _ __ _, hereby' slate that, to the best of my abiiitie.s, due care and diligence t~ as
u>t•d to tic observation of the comtructic~n such that the construction eras observed to be built within suhstantial
curnp)tanc~ and intent of the -1U1 «ater Quality Cet~ification and Buffer Rules, the approved clans and specifications,
and other- supportinb materials.
Si~•nature:
Engineer's Certification /
Partial V Final
llar:: - - -
r VY pd ~ as a duly re~is[ered Professional Engineer in the State of North
1 __
Carolina, having ,
been authorized to observe.(periodically, weekly, foil time) the construction of the project,for the
ence was used in the observation of the
d dili
pcrrrtittee hereby state that, to g
e f my abilities, due care an
s observed to be bui]t within substantial compliance and intent of the 40l
o
construction sue
Water Quality hat the c nst
ification • on wa
c
Buffer Rules, the approved,~l~tt~~~t~dw~,e~c'fications, and other supporting materials.
e,, ~i, , t ~:: , ~~,, ~,, 1
~ 71
or
Si 0
~e~ ~~~•`"rs*~~,<`""<;'l~g~tration No. _ .
gn
e ~~ ~• ~
Date
X 2 9 D ~ ~ f~ e a
~ ~Q
~~/~~ f~
~
~
n
1 U•771
i ~ ` s '*
~ ~ b,
\/~•y" ti
.
,~~~'' aR
s
~,~
y~g3
,
'
`