Loading...
HomeMy WebLinkAbout20020875 Ver 1_Certification of Completion_20050728~ AVOLIS ENGINEERING, P.A. ZJ P.O. Box 15564 New Bern, North Carolina 28561 (252) 633-0068 J~rly 28, 2005 Division of Water Quality 401 Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 RE: DWQ Project No. 020875 -Craven County (Neuse Riparian Buffer Authorization) DWQ Project No. 04-1194 (401 Water Quality Certification) Drainage Improvements -Gondolier Peninsula, Fairfield Harbour Subdivision AE Project No. 03090 Gentlemen: Attached please find for your records a Certificate of Completion for the referenced project authorized under the referenced projects. Additionally, pursuant to the requirements of the permit application, please accept this letter as certification that the drainage weirs installed under the referenced project have been installed to the permit design elevations. Should you have any questions relating to this matter, please do not hesitate to call. Sincerely, olis, P.E. ident 'Washington Regional Office Fairfield Harbor Property Owners Association ¢, Fay ~ ~.~ Certificate of Completion DWQ Project No.: Applicant: 020875 County: C*aven F~irfi.eld Harhor Pr,c»nerty Owners Association Project Name• Drainage Improvements -Gondolier Peninsula Date of Issuance of 401 Water Quality Certification: May 18, 2004 Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Caiazolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to -DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality, Certification and Buffer Rules, the approved plans and specifications, and other supporting materials:: . Signature: Agent's Certification Date: I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I~ ~ John Kevin Aeolis, P.E, as a duly registered Professional Engineer (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to th best of my abilities, due care and diligence was used in the observatio~~~~d~uction such that the con ction was observed to be built within substantial compliance a~~`~~'~l'' Water Quality Certifies and~uffer Rules, the approved plans and specifications, ~?~~- suPPerials. ~ SEAL Registration No.: 15TH 15l'd~: c- •, ~~~~~y,Y~GiNE~Q~p`\ i~~~~~kEv' N,P```~~ ~~_ a~