Loading...
HomeMy WebLinkAbout20010263 Ver 1_Certification of Completion_20060202 1RVATER resources ~ ~~ ~~ City of Greensboro a~ ~ ~~ 5~-3 ~-01 Administration (336) 373-2055 Fax (336)412-6305 Customer Service (336) 373-2344 Fax (336) 412-3932 Water Supply Mitchell Plant (336)373-5855 Fax (336) 373-5834 Townsend Plant (336) 375-2230 Fax (336)375-2207 Water Reclamation North Buffalo Plant (336) 373-5913 Fax (336)274-7585 T.Z. Osborne Plant (336) 375-2240 Fax (336) 621-3523 Construction & Maintenance Service Center (336) 373-2033 Fax (336)412-3936 Meter Services (336) 373-2071 Fax (336)574-4067 Water Conservation (336) 373-7610 Fax (336) 412-6305 Stormwater Management (336) 373-2055 Fax (336)412-6305 ~,~ ~., t71~/41WAT~R BRANs;N January 18, 2006 ~-ofl ~ ~~ ~ NC Division of Water Quality Attention: John R. Dorney, Supervisor, Wetlands/401 Unit 1621 Mail Service Center Raleigh, NC 27699-1621 Re: Certification No. 3320 Pursuant to Section 401 of the Federal Clean Water Act WQC Project # 010263, OE # 200120540 South Buffalo ree ormwater Wetland Project Dear Mr. Dorney: The purpose of this letter is to inform you that the work on the South Buffalo Creek wetland project, for which Section 401 Certification No. 3320 was issued, has been completed in compliance with the provisions of the certification, as of December 31, 2005. Attached herewith is the Division of Water Quality's "Certificate of Completion," duly filled out and signed. City of Greensboro appreciates your cooperation and help in completing this important project designed to enhance the water quality in the South Buffalo Creek. Sincerely yours, CITY OF GREENSBORO ~~ . ~. /~`' H. Kenney cDowell, III, P.E. Stormwater Manager City of Greensboro -Water Resources Department CC: Winston-Salem DWQ Regional Office Allan Williams, P.E., Director of Water Resources Department Shastri Annambhotla, P.E., Project Manager Ade Idowu, Operations Supervisor David Phlegar, Water Quality Supervisor 1505 P. O. Bos 3136. Greensboro. NC 27402-3136 • wtivw.ci.greensboro.nc.us • TDD (336) 373-2376 o~oF wAT~R pG Michael F. Easley Governor r Sherri Evans-Stanton, Acting Secretary >_ ~ Department of Environment and Natural Resources ~ ~ Kerr T. Stevens Division of Water Quality rti fi~~- rort ©. 3324 DWQ Project No.: 0102 6 3 County: ~fJ(L~"6f~~ Applicant: C/r>~ aF` GReF~trsBO~o Date of Issuance of 401 Water Quality Certification: /V1i4 ~ _3 ~ 00 ~ Certificate of Completion Upon completion of all work approved within the 401 Water Gluality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Vlletlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621.This form may be returned to DWG by the applicant, the applicant's authorized agent, or the project engineer.lt is not necessary to send certificates from all of these. Applicant's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water duality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water duality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was desig ed by a Certified Professional 1, /. 5'. S/"-I,~$7'~ / NA/~?PF/UTL~ , as a duly registered Professional~.~1-^ ~~!"' (i.e., Engineer, Landscape Architect, Surveyor, ect.) in the State of North Carolina, ha~Yng been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Gluality Certification and Buffer Ru t e p roved~d specifications, and other supporting mate ials. Signature T,T_!~,g~ egistration No.O~ 3 ~ Date O~ g 06w Division of Water Quality 1621 Mail Service Center Raleigh, NC 27699-1621 Wetlands/401 Unit: (919) 733-1786 Fax: (919)733-9959