HomeMy WebLinkAbout20031642 Ver 1_Certification of Completion_200601131
HORVATH
A S S ~) C ~~ Fl (I S
Civil Engineers
Planners
Landscape Architects
January 09, 2006
Alan W. Klimek, P.E., Director
NC Division of Water Quality,
401 Wetlands Certification Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
Re: Poplin Place Retail Center
DWQ #03-1642
Certificate of Completion
Dear Mr. Klimek:
Enclosed please find the required Certificate of Completion for the above referenced prof ect.
Also enclosed are photographs of the upstream and downstream ends of the culvert as
required in condition 8 of the Permit. Please feel free to contact me should you have any
questions or need additional information.
Respectfully,
~Q.., M. Csi.
John M. Combs, P.E.
cc: Amanda Jones - US Army Corps of Engineers (Asheville Regulatory Office)
Kirk Rankin -Fletcher Bright Company
Horvath Associates, P.A. -Durham Office
Wendell Overby -Soil & Environmental Consultants, P.A.
i~~r~ 1 3 2006
~JEN~t _ WATER GIUALITY
yyETtIWDS AND STpRMWATER gRgNCH
North Carolina
16 Consultant Place, Suite 201
Durham, NC 27707
p 919.490.4990 / f 919.490.8953
Tennessr~e
537 Market Street Suite LL20
Chattanooga, TN 37402
p 423.266.4990 / f 423.266.5700
0~ ~ ~- ~~ ~~~,~
Certificate of Completion 8--- 8--~~}
llWQ Project No.: (~3 " I ~ ¢ Z _ County: (~hll ot~l
Applicant: M>?. ~ }bMA S RAY poPL I rl
Project Namc: MpN'Rd~., ~ETA~I.. C-~e.~'T1c1R. ~~~~..1`( 7~'
Date of Issuance of 401 Water Quality Certification: ~.~, 19. Zo04~-
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit,
North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form
may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is
not necessary to send certificates from all of these.
Applicant's Certification
I, ,hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
Agent's Certification
Date:
I, ,hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
I_ ~o N >~ ~ 1. ~MS~~_ -~. E, . , as a duly registered Professional ~G~1N~R_ (i.e.,
- _ '
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to
observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that,
to the hest of~mv abilities, due care and diligence was used in the observation of the construction such that
the construction was observed tv be built within substantial compliance and intent of the 401 Water Quality
crtification and
~i~~rna~urc:
Registration No.: OL3~2¢__ Date: _ p ~ f-" ~ ~~~--~
p (~~~~~~ 777
~2 D
JAN 1 3.2606
DENR - WATER :.~UA;.f'f Y
WETLANDS AND STORMWA'ff-~: ~~~.~,~r,
ved plans and specifications. and other supporting materials.
Downstream view
toward Highway 74.
Downstream view
facing toward Center.
.. t ~~-~ ~~ ~.~ 0~
s; ..
;., _.
N l ~ 2006
:e;i~r, v^Ai~Iz~RQUALITY
've . ~.F.' , -vut, 570RM'JVATER BRANCH
9 'lW
Aga F~ y -~
°~
_ ,: ' ~..
Upstream view toward
Center.