Loading...
HomeMy WebLinkAbout20040527 Ver 1_Certification of Completion_20080401_ _r _T _ _ ' Q,`T ~r u~-~- S-7-a~ DWQ Project No.: Applicant: Certificate of Completion ~~-o5a ~ ~~h ~ ~.~ ~a -~n ~~ county: `~Q vh ~ r ~ O Project Name: ~ e ~ot'7 3 S~c.~ Q~ec'u.~.ee 9saa L'o h v~ , e ~o~~e rr =~~57 ~ Date of Issuance of 401 Water Quality Certification: ~ ~ ~ 02 C'D '`~ Upon completion of all work approved within the 401 Water Quality Certificatio Buffer Rules and an c„hcenuent modifications. the atinlicant is required to return this certificate to th 40 Vetlands Unit, North ~azolina Division of Water uality, 1621 Mail Service Center, Raleigh, NC, 27699-1~~ This farm may returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification ~w ~f- !'~ I, '~~,~~ #~ ~ `-~6v` ~ K ~ ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved pl sand specifications d other supporting materials.;. , 0 ~ ~ ~~ ~i D Signature: U "~ ~K /`~" Date: ~ Z Z 3 U DEC 3~ 0 2005 Agent'S CertLfiCatlon DENR -WATER QUALITY VYETLANDS AND STORMWATER BRANCH I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: p,~ RECEIVED DEC 2 7 2005 If this project was designed by a Certified Professional Env~r~Onlnet~taj Sciences , I, ~ , as a duly registered Professional (i.e:, Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby,state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No.: Date: