Loading...
HomeMy WebLinkAbout20041376 Ver 1_Certification of Completion_20080401Certificate of Completion DWQ Project No.: C' 1+ _ ~ 2~ ~ County: ~~ ~_~ ~ Applicant: ~ ('~~ ,,,-i: I °~ Y~\ U_ r Project Name: Date of Issuance of 401 Water Quality Certification: C~, '~vb ~-~(~ o g Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification ~ C I, ti's J ~ ~ f /1 ~ ~ ,hereby state that, to the best of my abilities, due care and diligence was used in the observati of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved p n and specificati ns, and other supporting materials:, Signature: ~-~ %~~ - ~ ,L- ~-~ Date: ~~ lam' ~ ~ ~ ~. 2 (~~ ~ Agent's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: D NU V ,~ d ?_004 If this project was designed by a Certified Professional w+~rc~r as r~©s TEa Q~~~n' WATER BRANCH I, '~ ' ° ~ ~ , as a duly registered Professional «'1~C (i.e., Engineer, Landsc e Architect, Surveyor, etc.) in the State of North Carolina, having be authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: ~ y Registration No.: l~ ~T Date: '~ ~ /~G`~