Loading...
HomeMy WebLinkAbout20041409 Ver 1_Certification of Completion_20080401~~c~~adc~o Certif cate of Completion NUV 18 2004 DENR -WATER QUALITY DWQ Project N o.: ~ ~ -' ~ ~ q C o u n ri-: '`e ~ CO ~ I S AND STORMWATER BRANCH Applicant: Project Name: P.(~COT1 o~n ill ~~itim~ ~ ' #$ Date of Issuance of 401 Water Quality Certif~catioa: ~e 0-~m ln~ r ~ r] a b,~_ Upon completion of all work approved within the 401 V~'ater Quali~y Certification and Buffer Rules and any subsequent modifications, the applicant is required to return this certificate to the 401/Vvetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, ,hereby state'thaL to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certificazion and Butler Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certifuarion Date: 1, ~e ~ Q r n - ~'p I~p,1~1Ap; i ne, t'Ur~rle r5 ,hereby state that, to the best of my abilities due care and dt~igence was used ;a the observa "on of the construction such that the construction was observed to be built within substantial,,co fiance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and sp~""~`'ations, and other supporting materials. Signature: %ernu`to ~g l~arE-ne r Date: L I.f'this proj~ was designed by a Certified Professional l- , as a duly registered Professional (i.e., engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weel~iy, full time) the construction of the project, for the Permittee hereav slate that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Rater Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. ~~~ ,,, \` Signature: Registration No.: Date: