Loading...
HomeMy WebLinkAbout20160424 Ver 1_More Info Received_20160518WHIF NTREAT Rl EXTENSION SIDE 1 PA Tj rm�Ail BLACK MOUNTAIN, NORTH CAROLINA APRIL 28, 2016 r Of O W ^ r Sheet No. Title UJ Z N N � � O J N N , Z p�pp W W N N C201 SIDEWALK PLAN app Z~� 1L N W Q 0 01 10 f=d r Q a 1L H Z a 0-1o Z Q CONTACT: JOHN M. STOLLERY Q 33 PROJECT LOCATION: N O 0 w >-I m z 0 F- LdU W 0 TOWN OF BLACK MOUNTAIN 160 MIDLAND AVENUE 00 BLACK MOUNTAIN, NC 28711C5 1z: (828) 419-9300 DEVELOPMENT DATA LAND OWNER: TOWN OF BLACK MOUNTAIN 160 MIDLAND AVENUE BLACK MOUNTAIN, NC 28711 JAMEY MATTHEWS CONTACT: (828)418-9300 CIVIL ENGINEER: INDEX OF SHEETS Sheet No. Title C000 COVER SKEET C200 SIDEWALK PLAN C201 SIDEWALK PLAN C921 SITE DETAILS C922 SITE DETAILS DEVELOPMENT DATA LAND OWNER: TOWN OF BLACK MOUNTAIN 160 MIDLAND AVENUE BLACK MOUNTAIN, NC 28711 JAMEY MATTHEWS CONTACT: (828)418-9300 CIVIL ENGINEER: CIVIL DESIGN CONCEPTS, P.A. 168 PATTON AVE. ASHEVILLE, NORTH CAROLINA 28801 CONTACT: JESSE GARDNER, P.E. Q z J (828) 252-5388 SURVEYOR: HIGH COUNTRY SURVEYORS, INC. 117-D CHERRY STREET 0-1o BLACK MOUNTAIN, NORTH CAROLINA 28711 CONTACT: JOHN M. STOLLERY Q (828) 664-0091 PROJECT LOCATION: MONTREAT ROAD BLACK MOUNTAIN, NORTH CAROLINA 28711 VICINITY MAP (NOT 'CO SCALE) BEFORE YOU DIG I CALL 1-800-632-4949 N.C. ONE—CALL CENTER IT'S THE LAW I. DATE: FEBRUARY 25, 2016 DRAWN BY: SKB CDC PROJECT NO.: 21220 SHEET C000 J Q Q z J W O a U 0-1o z Q V♦ z z 0 Q c> w O a m O 1 U a Z m QO V♦ � o 0 Z ZU LuQ m o w � O � o z o 2 v W o I -- DATE: FEBRUARY 25, 2016 DRAWN BY: SKB CDC PROJECT NO.: 21220 SHEET C000 EXISTING TREES TO BE REMOVED AS NECESSARY TO ACCOMMODATE PROPOSED SIDEWALK (TYP) EXISTING MAILBOX TO BE REMOVED AND RELOCATED TO THE STREET SIDE OF THE SIDEWALK (TYP) PROPOSED HEAVY DUTY CONCRETE APRON THROUGH GRAVEL DRIVEWAY (TYP) (SEE DETAIL) CONTRACTOR TO ADJUST EXISTING WATER METER LID AND BOX TO BE FLUSH WITH FINISH GRADE EXISTING MSD SEWER LINE (TYP) CONTRACTOR TO ADJUST EXISTING WATER METER LID AND BOX TO BE FLUSH WITH FINISH GRADE ELEVATION EXISTING EDGE OF PAVEMENT (TYP) EXISTING MAILBOX TO REMAIN CONTRACTOR TO REMOVE A PORTION OF WALL AS NECESSARY TO ACCOMMODATE SIDEWALK (TYP) EXISTING WHITE LINE (TYP) 09 SIDEWALK TO MATCH EXISTING \ ROADWAY ELEVATION MID) EXISTING PAVED ROAD EXISTING PROPERTY LINE (TYP) EXISTING MAILBOX TO BE REMOVED t='' v AND RELOCATED TO THE STREET SIDE OF THE SIDEWALK (TYP) I:s '' �'t., r: >,•x, Y,E xr � d � PROPOSED 2' SIDEWALK EASEMENT (TYP) PROPOSED 5' WIDE SIDEWALK WITH 2% MAXIMUM CROSS SLOPE (TYP) (SEE DETAIL) CONTRACTOR TO REMOVE STONE WALL AS NECESSARY TO ACCOMMODATE SIDEWALK (TYP) EXISTING POWER POLE TO REMAIN (TYP) r 1 � 1 � 2453 CONTRACTOR TO ADJUST EXISTING WATER METER LID AND BOX TO BE FLUSH WITH FINISH GRADE ELEVATION 1 EXISTING POWER POLE TO REMAIN. CONTRACTOR TO ADJUST GUY WIRE TO r PROPER VERTICAL AND HORIZONTAL CLEARANCE IF NECESSARY (TYP) EXISTING GRAVEL DRIVE (TYP) 1 1 r r r r 1 1 1 r 1 r r c:, o1.c.. ...., a. ,.. i. 9013 PROPOSED 20' TEMPORARY CONSTRUCTION EASEMENT (TYP) EXISTING POWER POLE TO REMAIN (TYP) REMOVE EXISTING STONE PILLAR CONTRACTOR TO RELOCATE SIGNAGE AS NECESSARY TO ACCOMMODATE SIDEWALK ��o� �000�0000�� 59 2456 PROPOSED JUNCTION BOX TOP: 2459.0 INV: 2451.3 r DEPTH: 7.7' (SEE DETAIL) r PROPOSED 17 LF OF 36" HDPE STORM PIPE 0 7.5% SLOPE INV OUT: 2450.0 o .., . c I.;l;c DB 41441 i r 1 1 r I I r 1 1 1 i DEVELOPMENT DATA LAND OWNER: TOWN OF BLACK MOUNTAIN ®ARUEOT 160 MIDLAND AVENUE BLACK MOUNTAIN, NC 26711 DR JAMEY MATTHEWS CONTACT: (828)419-9300 CIVIL ENGINEER: CIVIL DESIGN CONCEPTS, P.A. 168 PATTON AVE. $ ROOM ASHEVILLE, NORTH CAROLINA 28801 CONTACT: JESSE GARDNER, P.E. (828) 252-5388 SURVEYOR: HIGH COUNTRY SURVEYORS, INC. DANS DR 117-D CHERRY STREET BLACK MOUNTAIN, NORTH CAROLINA 28711 CONTACT: JOHN M. STOLLERY (828) 664-0091 PROJECT LOCATION: MONTREAT ROAD BLACK MOUNTAIN, NORTH CAROLINA 28711 CONTRACTOR TO ADJUST EXISTING WATER METER LIDS AND BOXES TO BE FLUSH WITH FINISH GRADE EXISTING 1' CONTOURS (TYP) W T� � � OT N z ," W ��Mss 4 F N tco � a N N z cli z R' k j ON svO W J CNO ONO SUBJECT �f x m =� " �" PROPERTY wco x 0 LL v~j w p LLLL baa ZQa Of VICINITY MAP (NOT TO SCALE) 0 w I N U W w z W U J m J W m U z '- m ®ARUEOT DR 7741 ST z _ $ ROOM V) 43704 Si ,. i IROQUOIS DANS DR O ANNA RD r- 3704 ST � 8MCH7W DR ST 9740 ST 4704 ST NEV ST A7IOMS ST D 3RD ST ppE M DR u� ROCK CHURCH ST PPE Si. 2ND ST a VICINITY MAP (NOT TO SCALE) 0 w I N U W w z W U J m J W m U z '- m BEFORE: YOU OIG I CALL 1-800-632-4949 N.c.IT''S THE LAW ITER NORTH MONTREAT ROAD SIDEWALK. EXTENSION - PHASE IV GRAPHIC SCALE 20 0 10 20 40 ( IN FEET , 1 inch = 20 it. F. mi J Q z z -, 0 W> 0 Wz t/) > Q z Qzw O a. m 0 f.� D 1 � m Z Qo Wcj) oc �z UJ zm LL. 0 0 x o W Z2 DATE: FEBRUARY 25, 2016 DRAWN BY: SKB CDC PROJECT NO.: 21220 SHEET z V) o r- a —2461 U D a w BEFORE: YOU OIG I CALL 1-800-632-4949 N.c.IT''S THE LAW ITER NORTH MONTREAT ROAD SIDEWALK. EXTENSION - PHASE IV GRAPHIC SCALE 20 0 10 20 40 ( IN FEET , 1 inch = 20 it. F. mi J Q z z -, 0 W> 0 Wz t/) > Q z Qzw O a. m 0 f.� D 1 � m Z Qo Wcj) oc �z UJ zm LL. 0 0 x o W Z2 DATE: FEBRUARY 25, 2016 DRAWN BY: SKB CDC PROJECT NO.: 21220 SHEET EXISTING EDGE OF PAVEMENT (TYP) CONTRACTOR TO ADJUST EXISTING WATER METER LID AND BOX TO BE FLUSH WITH FINISH GRADE ELEVATION EXISTING OVERHEAD UTILITIES EXISTING MAILBOX TO BE REMOVED AND RELOCATED TO THE STREET SIDE OF THE SIDEWALK (TYP)Of 20' EXISTING MSD SEWER LINE (TYP) EXISTING POWER POLE TO REMAIN PROPOSED 5' WIDE SIDEWALK WITH 2% MAXIMUM CROSS SLOPE (TYP) (SEE DETAIL) PROPOSED HEAVY DUTY CONCRETE THROUGH GRAVEL DRIVEWAY (TYP) (SEE DETAIL) EXISTING POWER POLE TO REMAIN EXISTING WHITE LINE (TYP) FLUSH WITH FINISH GRADE ELEVATION E 0 QCL a ' An p v/ U ii Z 63 ------------ . ... ... .. ...... i62. �.. w. `Y r 67 EXISTING POWER POLE TO REMAIN EXISTING SIGNAGE TO REMAIN DEVELOPMENT DATA LAND OWNER: TOWN OF BLACK MOUNTAIN N C4 Z N N N Z R 160 MIDLAND AVENUE Z Oco ONVD WD: 'J co J s CNVO BLACK MOUNTAIN, NC 28711 a w z U W JAMEY MATTHEWS CONTACT: (828)419-99300 CIVIL ENGINEER: CIVIL DESIGN CONCEPTS, P.A. a3 168 PATTON AVE. 3 ASHEVILLE, NORTH CAROLINA 28801 CONTACT: JESSE GARDNER, P.E. (828) 252-5388 SURVEYOR: HIGH COUNTRY SURVEYORS, INC. 117—D CHERRY STREET BLACK MOUNTAIN, NORTH CAROLINA 28711 CONTACT: JOHN M. STOLLERY (828) 664-0091 PROJECT LOCATION: MONTREAT ROAD BLACK MOUNTAIN, NORTH CAROLINA 28711 `V — — — — — — — — --2464 20° � _2461--__ BIN 2462 — PROPOSED 2° SIDEWALK EASEMENT (TYP) —2460— -- EXISTING TREES TO BE REMOVED AS — — � NECESSARY TO ACCOMMODATE EXISTING MAILBOX TO BE PROPOSED SIDEWALK (TYP) REMOVED AND RELOCATED AS CONTRACTOR TO REMOVE STONE WALL AS NECESSARY TO ACCOMMODATE NECESSARY TO ACCOMMODATE SIDEWALK (TYP) SIDEWALK CONTRACTOR TO SAW CUT AND REPLACE e CONCRETE STEPS AND MATCH EXISTING CONCRETE SURFACE AS NECESSARY TO s D 4 ' EXISTING TREES TO BE REMOVED AS ACCOMMODATE PROPOSED SIDEWALK x, NECESSARY TO ACCOMMODATE PROPOSED SIDEWALK (TYP) EXISTING SIDEWALK 62 8 EXISTING FENCE TO BE REMOVED AS NECESSARY TO ACCOMMODATE SIDEWALK (TYP) PROPOSED 20' TEMPORARY / EXISTING PROPERTY LINE (TYP) � CONSTRUCTION EASEMENT (TYP) ,a, FEX71SNG7GRAVEL DRIVE (TYP) CONTRACTOR TO ADJUST EXISTING WATER METER LID AND 80X TO BE I / 11 �V w N U-1 PROPOSED END OF PHASE IV SIDEWALK BEFORE YOU DIG ! CALL 1-800-632-4949 N.C. ONE—CALL CENTER IT'S THE LAW Ila TH ST 67H s ST I !!! ST VICINITY MAP (NOT TO SCALE) 0 ! INGTowwo +w reEEp{9RE.E OR ST R=caatxQcas sr pm MONTREAT ROAD SIDEWALK EXTENSI ON PHASE IV lxHP�lll� SCALE 0 10 ao ao 1 imefli = 20 ft. s � o� o CAR\o�oo E S/0 �r/� o ,00 AL .568� o ins ,c"JV v I111 1\ O w Z Q J d Y J w 0 r N U W N z W v J N J W m U z z 0 i= a U N w 0 LLI Q o' Z: Qz J O W Q U _ W O � Z Q � z 0 azw Oa m 0 U CD Z QO Z W � Z O O Z Y U W Z J m o w We— DATE: FEBRUARY 25, 2016 DRAWN BY: SKB CDC PROJECT NO.: 21220 SHEET C201 W T w 00 — Z a�0 Ono / N C4 Z N N N Z R Z Oco ONVD WD: 'J co J s CNVO a w z U W co=OLL F. W OLL cnaa ZQn a3 3 ti U) VICINITY MAP (NOT TO SCALE) 0 ! INGTowwo +w reEEp{9RE.E OR ST R=caatxQcas sr pm MONTREAT ROAD SIDEWALK EXTENSI ON PHASE IV lxHP�lll� SCALE 0 10 ao ao 1 imefli = 20 ft. s � o� o CAR\o�oo E S/0 �r/� o ,00 AL .568� o ins ,c"JV v I111 1\ O w Z Q J d Y J w 0 r N U W N z W v J N J W m U z z 0 i= a U N w 0 LLI Q o' Z: Qz J O W Q U _ W O � Z Q � z 0 azw Oa m 0 U CD Z QO Z W � Z O O Z Y U W Z J m o w We— DATE: FEBRUARY 25, 2016 DRAWN BY: SKB CDC PROJECT NO.: 21220 SHEET C201 PERMANENT SEEDING SCHEDULE GENERAL SEEDING NOTE: THE SEED MIXTURES SHOWN BELOW ARE THE MINIMUM ACCEPTABLE SCHEDULES FOR NCDENR. THE OWNER MAY CHOOSE TO HAVE AN ALTERNATIVE PERMANENT SEED MIX APPLIED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE OWNER PRIOR TO SEEDING AND SUBMIT ANY ALTERNATIVE PERMANENT SEEDING SCHEDULE TO THE ENGINEER FOR APPROVAL PRIOR TO APPLICATION OF THE SAME. MIXTURE #1M Seeding Mixture Species Rate (Ib/acre) Tall fescue 100 Sericea lespedeza 20 Korean lespedeza 10 Redtop 5 Kentucky bluegrass 5 Seeding note After Aug. 1, use unscarified seed for sericea lespedeza. Nurse plants Between May 1 and Aug. 15 add 10 Ib/acre German millet or 15 Ib/acre Sudangrass. Prior to May 1 or after Aug. 15, add 40 Ib/acre rye (grain). It may be beneficial to plant the grasses in late summer and overseed the lespedezas in March. Seeding dates Best Possible Below 2500 ft: Aug. 15 -Sept. 1 July 25 -Sept. 15 Mar. 1 -Apr. 1 Mar. 1 -May 10 Above 2500 ft: July 25 -Aug. 15 July 15 -Aug. 30 Mar. 20 -Apr. 20 Mar. 5 -May 15 Complete seeding earlier in the fall, and start later in spring on north and east facing slopes. Soil amendments Apply lime and fertilizer according to soil tests, or apply 4,000 Ib/acre ground agricultural limestone and 1,000 Ib/acre 5-10-10 fertilizer. Mulch Apply 4,000-5,000 Ib/acre grain straw mulch. Anchor mulch by tacking with asphalt, roving or netting. Netting is the preferred anchoring method on steep slopes. Maintenance Mow no more than once a year. Refertilize in the second year unless growth is fully adequate. Reseed, fertilize and mulch damaged areas immediately. TEMPORARY SEEDING SCHEDULE - LATE WINTER/EARLY SPRING Seeding Mixture Species Rate (Ib/acre) Rye (grain) 120 Annual lespedeza (Kobe in Piedmont 50 and Coastal Plain, Korean in Mountains) Omit annual lespedeza when duration of temporary cover is not to extend beyond June. Seeding dates Mountains - Above 2500 ft: Feb. 15 -May 15 Below 2500 ft: Feb. 1 -May 1 Piedmont - Jan. 1 -May 1 Coastal Plain - Dec. 1 -Apr. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 Ib/acre ground agricultural limestone and 750 Ib/acre 10-10-10 fertilizer. Mulch Apply 4,000 Ib/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch im- mediately following erosion or other damage. TEMPORARY SEEDING SCHEDULE - SUMMER Seeding mixture Species Rate (Ib/acre) German millet 40 In the Piedmont and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 50 Ib/acre. Seeding dates Mountains - May 15 -Aug. 15 Piedmont - May 1 -Aug. 15 Coastal Plain - Apr. 15 -Aug. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 Ib/acre ground agricultural limestone and 750 Ib/acre 10-10-10 fertilizer. Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as an anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, fertilize and mulch immediately following erosion or other damage. TEMPORARY SEEDING SCHEDULE - FALL Seeding mixture Species Rate (Ib/acre) Rye (grain) 120 Seeding dates Mountains -Aug. 15 -Dec. 15 Coastal Plain and Piedmont - Aug. 15 -Dec. 30 Soil amendments Follow soil tests or apply 2,000 Ib/acre ground agricultural lime- stone and 1,000 Ib/acre 10-10-10 fertilizer. Mulch Apply 4,000 Ib/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Repair and refertilize damaged areas immediately. Topdress with 50 Ib/acre of nitrogen in March. If it is necessary to extend temporary cover beyond June 15, overseed with 50 Ib/acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in late February or early March. GROUND STABILIZATION CRITERIA SUMMARY PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES, AND SLOPES 0.0' Cs) (2) C,, 0 C'3 :D HIGH QUALITY WATER 7 DAYS NONE (HQW) ZONES �r� �i�l �q�1 C1�7 SLOPES STEEPER 7 DAYS IF SLOPES ARE 10' OR LESS IN THAN 3:1 7.3' LENGH AND ARE NOT STEEPER 8' 0.0' THAN 2:1, 14 DAYS ARE ALLOWED. SLOPES 3:1 OR FLATTER 14 DAYS 7 -DAYS FOR SLOPES GREATER 2.0' 7.8' THAN 50' IN LENGTH ALL OTHER AREAS WITH 14 DAYS NONE (EXCEPT FOR PERIMETERS SLOPES FLATTER THAN 4:1 8.1' AND HQW ZONES) GENERAL NOTES 1. ALL SITEWORK SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE AND NATIONAL REGULATORY STANDARDS AND ALL REQUIREMENTS IN THE PROJECT TECHNICAL SPECIFICATIONS. 2. THE CONTRACTOR SHALL PROVIDE DURING CONSTRUCTION, AND ANY SUBSEQUENT MAINTENANCE, PROPER SIGNS, SIGNAL LIGHTS, FLAGMEN AND OTHER WARNING DEVICES FOR THE PROTECTION OF TRAFFIC IN CONFORMANCE WITH THE LATEST MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS INCLUDING ANY SUBSEQUENT AMENDMENTS OR SUPPLEMENTS. THE CONTRACTOR SHALL GIVE NOTICE TO THE NCDOT DISTRICT ENGINEER PRIOR TO STARTING ANY CONSTRUCTION ACTIVITY WITHIN NCDOT RIGHT-OF-WAY. 3. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL SITEWORK CONSTRUCTION AND SCHEDULING AS REQUIRED TO PERMIT THE INSTALLATION OR CONSTRUCTION OF OTHER TRADES IN A LOGICAL SEQUENCE, (IE: BUILDING CONTRACTORS, ELECTRICAL CONTRACTOR, ETC.). 4. THESE PLANS SHOULD NOT BE USED IN ANY WAY FOR THE SALE OR CONVEYANCE OF LAND AND/OR RIGHT-OF-WAYS. 5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSTALL AND MAINTAIN ADEQUATE EROSION CONTROL DEVICES (SILT FENCE, SEDIMENT TRAPS AND BASINS, DITCH CHECKS, INLET PROTECTION, CONSTRUCTION ENTRANCES ETC.) AS REQUIRED TO PREVENT ANY OFFSITE SEDIMENTATION, SILTATION OF CREEKS OR TRACKING OF MUD OR DEBRIS ONTO PUBLIC ROADS. ALL EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE NC SEDIMENTATION CONTROL COMMISSION, EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, AND THE APPROVED DESIGN PLANS AND SPECIFICATIONS. 6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE ALL UTILITIES PRIOR TO CONSTRUCTION AND TO NOTE ANY CONFLICTS. THE LOCATION OF SOME UTILITIES SHOWN ON THE PLANS HAVE BEEN APPROXIMATED. ALL BURIED UTILITIES HAVE NOT BEEN SHOWN ON THE PLANS AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR LOCATION PRIOR TO CONSTRUCTION. ANY DAMAGE TO UTILITIES INCURRED DURING OR RESULTING FROM CONSTRUCTION ACTIVITY IS THE RESPONSIBILITY OF THE CONTRACTOR AND IS TO BE REPAIRED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR IS TO NOTIFY ALL UTILITY COMPANIES AT LEAST 72 HOURS BEFORE CONSTRUCTION ACTIVITY IS TO BEGIN. ADDITIONALLY, THE CONTRACTOR SHALL NOTIFY NC ONE CALL AT 1-800-632-4949, 48 HOURS BEFORE CONSTRUCTION BEGINS. 7. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO MAINTAIN ADEQUATE JOB SAFETY AND SECURITY THROUGHOUT THE DURATION OF PROJECT CONSTRUCTION. 8. ALL PROPOSED FINISH ELEVATIONS ARE THE FINAL ELEVATIONS INDICATED FOR ASPHALT, CONCRETE OR GROUND. SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS. 9. ALL DIMENSIONS ARE PARALLEL AND PERPENDICULAR TO BASE LINES, PROPERTY LINES AND BUILDING LINES UNLESS OTHERWISE NOTED. ALL DIMENSIONS ARE HORIZONTAL UNLESS OTHERWISE NOTED. 10. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD BEFORE CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF THE PLANS DIFFER FROM ACTUAL FIELD CONDITIONS, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNER AND ENGINEER IMMEDIATELY PRIOR TO PROCEEDING WITH CONSTRUCTION. 11. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROTECT PUBLIC AND PRIVATE PROPERTIES THROUGHOUT CONSTRUCTION. ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTIES THAT IS A RESULT OF CONSTRUCTION, SHALL BE PROPERLY REPAIRED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. 12. THE CONTRACTOR IS TO COORDINATE ALL TIE-IN WORK WITH THE UTILITY OWNER AND THE ENGINEER. ANY DISRUPTION IN THE SERVICE OF EXISTING UTILITIES WILL REQUIRE THE PERMISSION OF THE UTILITY OWNER. 13. ALL CUT AND FILL SLOPES SHALL BE 2 (HORIZONTAL) TO 1 (VERTICAL) OR FLATTER UNLESS OTHERWISE NOTED. 14. ANY RIGHT-OF-WAYS, EASEMENTS AND PROPERTY DESCRIP11ONS OR ACQUISITIONS WHICH MAY BE REQUIRED FOR THIS PROJECT ARE TO BE PROVIDED BY OTHERS. 15. IT IS THE CONTRACTOR'S RESPONSIBILITY TO SCHEDULE AND COORDINATE ALL SITE VISITS BY THE ENGINEER. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AT LEAST THREE DAYS IN ADVANCE OF UTILITY INSTALLATION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO KEEP OPEN UTILITY TRENCHES SAFE AND SECURE. NO TRENCHES SHALL BE LEFT OPEN WHEN WORK CREWS ARE NOT ON SITE. ONCE THE ENGINEER'S SITE VISIT HAS BEEN CONDUCTED, IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROPERLY BACKFILL THE OPEN TRENCHES ON THE SAME WORKING DAY. 16. THE EXISTING PROPERTY LINES, LOCATION AND TOPOGRAPHIC INFORMATION WERE PREPARED BY OTHERS AND DOES NOT REPRESENT THE WORK OF CIVIL DESIGN CONCEPTS, PA. 17. ALL DEBRIS, STRUCTURES AND UTILITIES TO BE DEMOLISHED AND REMOVED FROM THE PROJECT SITE ARE NOT SHOWN ON THIS PLAN. ANY ADDITIONAL DEBRIS, STRUCTURES AND UTILITIES ENCOUNTERED DURING CONSTRUCTION, WHICH IN THE OPINION OF THE ENGINEER SHOULD BE DEMOLISHED AND REMOVED, SHALL BE DISPOSED OF OFF-SITE AT THE CONTRACTOR'S EXPENSE. IN ACCORDANCE WITH APPLICABLE LOCAL, STATE & FEDERAL REGULATIONS. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY REQUIRED PERMITS. 18. IT IS RECOMMENDED THAT THE CONTRACTOR OBTAIN A SOIL SAMPLE OF THE AREA TO BE DISTURBED AND HAVE THE SAMPLE EVALUATED PRIOR TO SEEDING IN ORDER TO PROVIDE A DETAILED DESCRIPTION OF LIME AND FERTILIZE APPLICATION RATES. 6" THICK OF 4000 P.S.I. CONCRETE 8" COMPACTED STONE BASE, TYP. NOTE: COMPACTED SUBGRADE 1. THIS TYPICAL PAVEMENT SCHEDULE SHALL APPLY UNLESS INDICATED OTHERWISE IN THE GEOTECHNICAL ENGINEERING REPORT PREPARED FOR THE SUBJECT SITE CONDITIONS AND ANTICIPATED USAGE. HEAVY DUTY CONCRETE SECTION NOT TO SCALE 1/2" DEEP TOOLED JOINT SEALER DISCONTINUE WWF 1/2" JOINT 2" FROM SIDES OF I FILLER EXPANSION JOINT EXPANSION (ISOLATION) JOINT Q vM H -O HZ _W00 � 0 -1 Hz -I=D -n SCD30 ZH-vr-n O n D D �--i CAH O Z p C 2 M >Z Z z^'1D °ate 0 D D Z M Z -T7 O HEET 1 OF 1 1205.0A C3 om H -O H � Cl)C) 1D' 0 -1 iMiZ-1=D z O D n m -n z D Z =(AQO 00" c)pDD -< --1 r Z � SHEET 1 OF 4 848.05 SLOPE AWAY FROM BLDG. @ 2%, TYPICAL UNLESS NOTE OTHERWISE 6"x 6% WIA x W1.4 WWF 2" CLR. FROM TOP, TYPICAL ALL SIDEWALK 4" OF CABC 1/8" TOOLED RADIUS, TYP. 1/8" �- FILL WITH TOOLED JOINT SEALER 1-112" ��DISCONTINUE WWF 2" FROM SIDE OF CONTRACTION JOINTS GROOVED CONTRACTION (CONTROL) JOINT PROVIDE EXPANSION AND CONTRACTION JOINTS AS REQUIRED 4" THICK CONCRETE SIDEWALK, MAX. SLOPE TRANSVERSE TO PRIMARY TRAFFIC PATTERNS, TYPICAL SLOPE FINISH GRADES AWAY FROM SIDEWALK (TYPICAL) -- FINISH GRADES TO BE FLUSH WITH SIDEWALK EDGES, TYPICAL CONTRACTION OR EXPANSION JOINT, TYPICAL =5%(1'/20') NOTES: rL_-%14 VICVV 1. ALL SIDEWALK SHALL BE MINIMUM 4" THICK, REINFORCED 4,000 PSI AIR -ENTRAINED CONCRETE. 2. SEE PLAN FOR SIDEWALK LOCATIONS AND DIMENSIONS. WELL COMPACTED 3. PROVIDE EXPANSION JOINTS AT MAXIMUM 50 FT. INTERVALS IN ANY DIRECTION AND AT ALL -SUITABLE SUBGRADE LOCATIONS WHERE SIDEWALK JOINS BUILDING OR FIXED OBJECTS. (ALL LOCATIONS) 4. CONTRACTOR TO SUBMIT DIMENSIONED JOINT LAYOUT SKETCHES ON ALL SIDEWALKS TO THE ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION. SECTION VIEW TYPICAL SIDEWALK DETAIL NOT TO SCALE HI -VISIBILITY CROSSWALK SIDEWALK WCR 24" WHITE CROSSWALK LINE 24 GAP 24" WHITE CROSSWALK LINE 10' MIN. WIDTH LEGEND 0 DIRECTION OF 0 TRAFFIC FLOW ZIL WCR WHEELCHAIR RAMP STOPBAR STANDARD CROSSWALK CRO STO WALK CROSSWALK $, WHITE CROSSWALK LINES GENERAL NOTES 1- THE MINIMUM WIDTH OF STANDARD CROSSWALKS IS 6 FEET. THE MINIMUM WIDTH OF HI -VISIBILITY CROSSWALKS IS 10 FEET. 2- CENTER CROSSWALKS TO THEIR CORRESPONDING WHEELCHAIR RAMPS, BUT DO NOT SET THEM WITHIN THE INTERSECTION AREA ESTABLISHED BY BISECTING THE INTERSECTION RADII. 3- PLACE STOP BARS A MINIMUM OF 4 FEET FROM NEAREST CROSSWALK LINE, BUT NOT WITHIN THE AREA OF A WHEELCHAIR RAMP. PLACE STOP BARS PARALLEL TO CROSSWALK LINES, BUT CAN BE PLACED PERPINDICULAR TO TRAVEL LANES. 4- COORDINATE PLACEMENT OF CROSSWALKS IN ALL CASES WITH THE LOCATION OF WHEELCHAIR RAMPS. (SEE SIGNAL PLANS). ISOMETRIC VIEW NOTES: 1. DETECTABLE WARNING DOMES SHALL COVER 2`-0" LENGTH AND FULL WIDTH OF THE RAMP FLOOR AS SHOWN ON THE DETAILS. 2. OBTAIN 70% CONTRAST VISIBILITY WITH ADJOINING SURFACE, EITHER LIGHT -ON -DARK, OR DARK -ON -LIGHT SEQUENCE COVERING THE ENTIRE RAMP. W A RAMP WIDTH AREA IS VARIABLE _ B 5' 0.0' Cs) (2) C,, 0 C'3 :D , 5.0'* r � @) iO �C) �r� �i�l �q�1 C1�7 1 • BASE DIAMETER i 0.45"R TO 0.70"R TOPDVMETER OF NO U1 THAN 50%70 NO MOI THAN 65% OF THE BASE DIAMErER 7.8' 7.3' 6.5'** 8' 0.0' 8.8' 7.3' 6.5'- W A W+A+9" X B 5' 0.0' 5.8' 5.8' 5.0'* 6' 0.0' 6.8' 6.8' 6.0' 7' 0.0' 7.8' 7.3' 6.5'** 8' 0.0' 8.8' 7.3' 6.5'- 5' 2.0' 7.8' 7.S' 5.0' 5' 2.5' 8.3' 8.1' 4.8' 5' 3.0' 8.8' 8.3' 4.4' 5' 3.5' 9.3' 8.4' 4.1' 5' 4.0' 1 9.8' 8.8' 3.8' 5' 4.5' 1 1D.V 8.7' 3.4' 5' 6.0' 10.8' 8.9' 3.1' DROP CURB STD. 21-( ). B = DISTANCE FROM FRONT EDGE OF SIDEWALK ;�. o.' a `:,• TO BACK POINT OF 12:1 (8.33%) SLOPE. ',y ' •° �' ' ' ° °'' •' •'!' ' ' ° * BACK OF SIDEWALK DROP REQUIRED FOR ALL "B" SIDEWALK SLOPES. C NCRETE ** BACK OF SIDEWALK DROP REQUIRED FOR DETECTABLE WARNING DOMES SIDEWALK SLOPES 0.04. 0.02 (MIN. 0.08 (MAX.; 0.04 NORM. X. SECTION B -B W SIDEWALK (5' STD.) B ... ....... ._ __ .__._._ 0.01 __-� MIN. 0.04 MAX.) I 4" 0.02 (NORM.) j SIDEWALK 6'-0" 3'-4" ^" �0_p_q_F ELEVATION; CURB CURB \ Ufl TRANSITION DROP TRANSITION CURB l - GUTTER, VARIABLE SLOPES NOTT,,,,.--•'' TO EXCEED 12:1 (8.33%) SECTION A -A (SEE NOTE 13) NOTE: A PORTION OF ONE OR BOTH RAMPS MAY EXTEND OUTSIDE THE RETURN. - EXPANSION JOINT T( EE STD. 848.01) 4" Aj < l`1 9�qy\F yet EXPANSION JOINT , 8 F (SEE STD. 848.01);' BIDEWALK r - D ANY RADII (40" MIN. FLOOR WIDTH) Z O („ �a 4 TZ-tCil='3U LLJCLHZ OOH= cc Q -0a:0 i H Cl) LL 0 J OOCO°t M " j c CL H CL � Cr O LL 0 N cn H z ....,t H � he (/) O Q ccO Cr_a Z Z Z H W cc W (f) _ > W 1-4 Li _aa (D Z W SHEET 1 OF 1 1205.07 Z O O QQ H F, LL_ _j o0cbz Wa¢"= O= OHQ ��H_j10 0 C/) < z , >LLI `I C] O 8481.05 SITE DETAILS W to W n t!1 LU H a Z N N T Z j-J�.NLU �.. W JaaDa x a�ZZ T- 0 0LL Z0LL Taa ZQa 33 w s- 0 w a_ N 0 O LL_ In J N w 0 H Z 0 c_ E 0 Tn w 0 Ci Z Q Z J 0 rr a 0 O Z H Z O v w M 0 v Z D M i Z Z Z) O Y L) Q J M w 0 i 0 s - DATE: FEBRUARY 25, 2016 DRAWN BY: SKB CDC PROJECT NO.: 21220 SHEET C921 MIN. 10 GA. LINE WIRES VARIABLE AS DIRECTED BY THE ENGINEER STEEL POST _PLASTIC OR NOTE: WIRE TIES USE SILT FENCE ONLY WHEN 2 GA. DRAINAGE AREA DOES NOT / EXCEED 1/4 ACRE AND NEVER IN 0 INTERMEDIATE AREAS OF CONCENTRATED FLOW -1 WIRES N GRADE -'* FOR REPAIR OF SILT SILT FENCE FILTER FABRIC FENCE FAILURES, USE No. 57 WASHED STONE, AS AN ANCHOR WHEN SILT FRONT VIEW FENCE IS PROTECTING CATCH BASIN. CONSTRUCTION NOTES 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24" ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHENINT JO S ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4' MIN. OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE RENFORCEMENT THEN THE FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC TIES SHOULD HAVE A MIN. 50 Ib TENSILE STRENGTH. 5. EXCAVATE A TRENCH APPROXIMATELY 4" WIDE AND 8" DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 6. PLACE 12" OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 7. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 8. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. MAINTENANCE NOTES 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVIOD UNDERMINING THE FENCE DURING CLEANOUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERTY STABILIZED. SILT FENCE NOT TO SCALE 0 1 N STEEL POST — WOVEN WIRE FABRIC — SILT FENCE FILTER FABRIC FILL 5 SLOPE GRADE ANCHOR 12" LONG SKIRT IN TRENCH 8" DEEP AND 4" WIDE* SIDE VIEW MATERIALS NOTES 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461, WHICH IS SHOWN IN PART IN TABLE 6.62b OF THE NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USUABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 TO 1207. 2. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB/ LINEAR FT STEEL WITH A MINIMUM LENGTH OF 5 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. 3. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A MAXIMUM MESH SPACING OF 6 INCHES. .....\,.i.. B F I ' l > SECTION X -X ,L KAN,i, 0 L _... € .s }} g _' a _ -------- a I ' M s I _ _ _._..... >. JL i ± E .. ..............„.„„. E4 x FOR MANHOLE COVER & FRAME OPT"IONALaCE0 , TO C, BRICK NOV BE USED TO ADJUST FRAME A COVER TO SURFACE ELEVATION, mm. i' £ _ SECTION - C OR a - D GENERAL NOTE5> OHA,4V,ER ALL EXPOSED CORNERS I '. USE 3 13..E arr.>AS: .,,. CONCRETE THROUGHOUT. OPTIONAL CONSTRUCTION _ MONOLITHIC `CYrL ,c KEYWAY, 0S =[4 REAR DOWELS AT 12„ CENTERS AS DIRECTED BY THE ENGINEER USE FORMS TO ICONSTRUCT THE-, BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET N BASE SLAB 0R BOX, ADD € i BASE AS SHOWN ON STANDARD NO. 840 = 00 . PROIf'w0E ALL JUNCTION BOXES OVER S`-Sx: IN DEPTH WITH STEPS 1 ON CENTERS IN \ACCORDANCE WITH STC.. NO, 640 66,. ADJUST THE: STEEL, CONCRETE AND BRICK MASONRY QUANTITIES T0INCLUDE THE ADDITION THE MANHOLE {:I DIAGONAL BARS SHORTENED AROUND OPENING IN TOP .'v'.SAz„, ADDITIONAL AA. V, .R:£:: `�B's..E HEIGHT BRICK MASONRY, OPENING IN TOP SLAB.) DEPTH N��S r>a s_`I-g� 3.s; THIS STRUCTURE FROM TOP OF BOTTOM SLAB T �" TOP ELEVAT?ON IS 12 E::,.... DIMENSIONS AND QUANTITIES ES O OR CONCRETE JUNCTION BOXI S DIMENSIONS OF BOX AND PIP "7, ..,...„...�..,..r....,x.�`'"aP CLAE.>.,. ��.C€::�•�a �,. ?Cia`t.” c� s” ,..;.�.m,:c* FOR y _.. _...__.....__.. _ _ £ a . a Ia YARDS N QUANTITIES l>i v.. QUAN a ; 0 "C# s ONE P1 € ...€_..„,.., € S L_.�tr.NS?'C3N,� t e°=`re3`� SLABS a :.l.w',"iE. .a PE € �.°�?N I51"B?Tii £ HE:C%11� ARtT '>A" zN S0� BOX �`._A C � Ir.: i ,_<> t.„ €' �.. E r [�iP ... �... .iaN A�.>.i.t LOS, =CL€€> >%i'<s,€ H N0, ^-r [ _ a 12 R= 0.> 3 1• a S` s, I 0","=.0 C�.T6, £ 01 ,aCl 22 ! 0,760 O°015 a. 24 ,,. EE i.... ...„..� 0 S E.SOxT IS .4 I . i E LT^a•..a. r<i .2.�Y.> < Y 3 � 3�i FhaY € m e? . ...._.. 227 0>e2e 0>222 so 1„065 0,033..�.._L.�.0_. ....C.......S.... ......e £ 24, ^x3'16 a > _rY'r rod' t` . � 9a s F [ . =e-'� 085 i 1 r• ~€ t i3 m £ a " £ � j -v$ �Y $ -2- Sell 5 C.y0.��3 I.w o° O>132 0,178 i € 3 �I 4i..�_ 3w �x a<s' v ,E.aS t 0.,60 0,370 AAs\<I ed i„ <e w _ S' 5< J` -4 5-4SS t.7>3O40; 9#i 3623 0>23 37 € 54 1Ol € -91.28 7'= epsr € .2e RES fi 6 9, >;sa`= m3 .$ Isi 6—milt ii„z..ES 0<865 0. 26 ..Sc x I.— __.:.....__...._....._.�— �_. _.__.._..._.__. _30 ......___..._....._.__ 2�._ .. _..:.. ._._.._..__._._.. __.._. — ._.._..__._ 0 I e'..E< a �, , -x� 0 x: 3» �,� S:x -S` .L�42.z.. 1,042 0.481 t4aa i SiSuT .357 '1<435 1 -10” R'••ir I 5' 1£ 10 1>210 0.518=, iEfC S.S ;° 0,444 1 0, Fee DEET i OF ��.�.��..�......� u.��a�.�>��....r..........�.��...�....�..........m.....o��...m�mti..�.�rm...a��u�P�.rrr�,�..�..�.��..��.�...�..�.�.....�m��..a�.�..�.�............�..r.�..rr�..�aa�..��a.....�..�r�....ra��.....�..�...��� ......n....�..a.�..�.��.�.....�.�a......�...e�.......�.....�.�..���� ���n�� � >�It€ �........................ar\... <�...� �.m.��.......����...��....��.��...........�.a..�...a..�aH.....u..�.......u..�a......a.�....�............��,��.�.,�,r..�......�..��..,a..�a�a�a�..u...�a.....�.���.r��..,*.........��......................�aua.�....eti...��.W�uuH.��...�..�.��...�.. ....��...a.W........a ���..�.�...�.�....�..�a.�..�� ®aw....oH� �.��.�� e mTOP- PILC. _ _. y __ .... 7P t1” ILL__. TOP O1� ... .......... .............. m _.__ .............._ m _ _m ................ L..a ... .e.......................�.. g I _ >” ...TiT iCC.':,`HO _INE �..„>. „.>.„..„..... � � ._.__._._. ti`OUND LINE— 1€ „aNl LINE _>........................................_.„.... �...�.. .�„ ..... .,.rrr_"�>. m � ."m'M ____..w.„....._......�....„��.. �........ ,.��,�.m�..........._<„.�_ �.�? � .i _ _ x.._ MR r' �^�'.�: :v3a�tt s`` {3 `a."s :[ >� 'fit �1.... ...w 8 � .., .w: mit. � >>�^ C'W.RCT AFTER .^•' a' ,<�'�` .k. � a «�” a.€�x>-.� nTe °: !a ^ate y .��.�.. .. ,ecce fr. ,a, y° .' s;;s e ^,y ?Z`...° `.`" c,., ` .`• •`i„` .a �F `,..< p ,<7 moi_ '� IPE .R Sc..°�a.>3:.L. L `` a sem ^ __+..> r<Il' A I"R iOR TO , � PRIOR "¢t 8 � a C.W 3 T .k" PC.A%�USE:'aa u ` ,d'' 2„„.. ..^ „ate: R� `nom aF....„....,.„"::.,�,.c;.„,_.s.'`.>..a ._na.> r,''>... saP:. ,�°PC..�'u'..smm its x p�nz:�� °�>, u E`\aa C 3T T$eYs...„u:�m..,,....,w,..... >, s #f7„»; L ne FILC. ... ,.. -s- > NOT LESS L MIN . I <C^ f6 mID, I >I � €;.�., a :.„...>s......� .... r>. ,,...`>a THAN S a. !.>rra'b3 �: P. „"=re „..�.� im„=�, � � N „>. EARTH � L:�.€ >„6-1��'AN Sr' ' Fi ...,�.„.r .e[ .. FEN � I s.„.N. o �W.....:: .�.....„...... „.,..„.„ :.:..:„. _....... PDT LES 4* IT C i” 0 v N „ LT C9 < Nd` i >T�E THAN 4 aaaTai a.°A.t.Y.. EARTH ?[,E`?,FOUNDATION ,a.,......., �e €tt+i �. AS DIRECTED $Y ENGR,. 1,,__........,...,„........„..„........................„m..........,..,......r. �r _...................'...............:_....__„ ...M.„._..........m. _m __ ,`0,„a FOUNDATION '[x�$`DA `IOC UNSUITABLE S�MATERIAL Y S U TAIL. FOUNDATION I PIPE IN TRENCH ...................r.............................................................r.........w..<.�.TOP �lxP: VxL�L�..�..n.����` ,,,.....„...�...„.�„...„..�.....�............n.N.......„.....�„..P.�.....r.�� .a...„r. \�x�.F.. wmF.”LL . ..... ......................w... .„r..r...w..�...www......x... e�..s�„..,..........w..�m...........�...r�.�...........fSOF ......".>I....a....i............. ................r...�, < ...m...........r.���s>...uwovrwa...w>.>w. d O� �..................„..�...................................„..„.....„.........�..........,....„........„„„...„„.„ Z...........„.,......................�.........,........................."...........„.....>...a.......................e..„.......„.......�.�.we.............,....�.....„.......„.....:............a„.„s.......,........._...............�.e._.........„.........„�...e_.........�.......>..............>....e. e.....e..®.....m... a __._m ..._................_._ _.„..„.u.. M..... „.. ,. ., titin _..... a. _1___11_------ _11111-l” � _......... ------_..--._ma�� ._ .. . � .. � ��_�.�._......_.. ...... ._.._.... ���� r .......... „„,.. »..._.,....,m.. ................ ...„......�.......„........11--..r,«..,,.„.....�...............,...�..„_._._„m....„_....>_ >...««„„„..r. �,. 0_e.....,..„...„...„�.�...„.�.�.,....�....,............m..>..._...,.."..w..m...,.,m...... >._ .. .„.�>. ...�."._.......�,......_....,......m...._..,..�.....W..._..._.�...-......,.�>. > ”. ...�I,.�..q- �a >.. >RYN: ._. zz ..... € . 0[""`R`>„.„.„.„..m.....,....:."....�„.>�,.S .s•>+Y„:�,��....' �,... _ d'-'gy,§m' ....».•• P... , 4.=.. ^I.. .a `Lx.NG LIN . d . s✓,id' GROUNDGINE Ile' .."-.........=t,..a5.., 3 �•`..�a.„.. 4. N ,may.I 39 I RT �. Z >c„ >a''` ...„.f• „amw ”:3e .k 'sor s>s' _ E 8 <' .,„.#> .>.aa tB AFTER a h „.... 4> �"s�." eEF ;a>” ................... Q° -`a ;as a �i �<>,;,"`;.a k3 IC .4a.;RiR m. °�;e o` m _ a L ` COMPACT c R..._.a'�.„.„ PRIOR "0 ggWjP TIS .y. :E:€I A * ^'a MIm PLACEMENT 01 ' r A .YIS s. art„_^LESS THAN .a:�” I taf.„„"it=��, ».” r.....�ra,,._ „>�..„.. sm a ..:`� g .�,>tl� t"IS,.€., a er..`""F. d.«`e ..o€ fe ''':.w `a1• [ o­iec..� .y...: �, e I .C,{ 7€a HIN I s is DIRECTED ,<.`� §meg „.„„.. Y .„. I S TR � 'OT Cia Bl> 4 2' I 7 3 # , \ E: N S” dN E2 a ' ..aa .. .. ..,m �v. er sk0 T'€aa>a. ,D, _ >;e<x=,=, R .Nt„.N..t�ra[ P>ny e:.X„xT "Tei syr = F a THS aE NCR 4 NORMAL .ARH �"ND.,A€ ON ROCL FOUND, ION NT NOT£ TZZ 1 UNSULLITABLE a MATER �:A.." FOUNDATION N m........ ...... ..r........ bm....um...........M.............. M.........., r.......... .a ..........u.......r..._ ..M..� .W"W .� �.m....m.....u, u , u .... �... „ ....M.�....�....m._.. _ .� o _M ...► . :.N . T:\ F TO 3t CP? TEHEAVY . ANT ?{zaPIPE.:E€T UNTILty THE PIPE CULVERT 3<C.L F � �tQ" HT..SE£A..sN>%:3IANE?€..a BEEN "NOPPRt{ C�z�� z €��i��Eti.: �I;i AT :�2M19 Or? OF APPROVED MATERIAL, \.d O IPE a :e . . TER tiNFBIN L INE OF 40 \0>L. :EEM�.sOS.II zCN?,TL OUTSIDE a.N`sla,SELECT SFL.MATERIAL CLASS e„_1R S g:vs.>TMEASURED T£. sY cw c• >a.t a ALONG THE PIPE R THE h P OF THE PIPE TO THE TOP . � c AND BELOW SPRING(_INE< APPR E= ITnS z uAL MATERIAL, a.'i. .NsaT EU21LY COMRA>T HAUNCH ZONE OF PIPE SA �K`r: LL, } dt= k ^x=r3 a. eh-CDISIS.T AL � S'da - �. £ � F' `~' pry.=» •i� .>,a�.Qaa�...���•a.�.....��a... �^ � c:+`i� ..> � .6� 3 cT� � E a�riA.I_zN ac"��3.r�'�a>N.t E�I��i^TRs,,�;"e� w.eR � �. F.i �.. h'Y €"£..T(�r? p➢�. °�E�s l'3„= .`�1«�E.�Fi E� x: �. ........................m..,..................„......m....,,.................. ........_.....�..�.��.............. ��<.�a�..„......>...„........ �,�..�_.,�............m.....mm......�.m..,�............................„..._..mw.�„..�....�ma�..,..�..",......�....�..mm....�..._.M...........m.._....rr�...�...mm�.n._...�..„„....m.....���a��r.���. SITE DETAILS 01 %O OD T Vu - Z W W J CN`D Sco W Xy w z a Z Z a3 I c� w W H Ir W d T.- \ \ 00 N c} O O U- V) V) J Q W 0 Ld m W > —W U) t) D Q 00. z O W — ce cr) �_ Z Z W O 2W }I m z O F- 0 - C3 -0- O 'z Q z J O !Z' Q U H 0.Y O z z O U W m O U z D m i z H z O Y U Q J m W O 0 DATE: FEBRUARY 25, 2016 DRAWN BY: SKB CDC PROJECT NO.: 21220 SHEET C922