HomeMy WebLinkAboutWQ0023310_Monitoring - 08-2016_20161004 (2)J' FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page
WQ0023310
FacilityName:
Warsaw Sanitation Trailer•
•Aug
110
Field Name:
.:
•Field
.•
• irrigation occur
Area (acres):
at this facility?
Cover Crop:
Cover Cr�op.
0 •
• '.
1
• '.
1
• '.
1
. '.
1
Annual Rate (in):
1
1
..••. •
- • •. -•
0•
• •. -•
0 •
- • •. -•
Q •
- • •. -•
0 •
... i n .
12 Month Floating Total Ciny
j//////j/j////j/
jj//////j///////i/////�j///////.!j////////`j/////
� EM//
j///j/
j//////
j///�//'j///////j//////
�j///
�111
j/////j/
.. FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of
WQ0023310
Facility Name:
Warsaw Sanitation Trailer•
.
August
1 •
-.
Field Name:
Field Name:
• irrigation occur
at this facility?
Cover Crw
Cover Cro
•
• '.
1Hourly
'.te (in):'
Hourb,'.
1
. '.
•
1
1
1
1
•.. .
Field Irrigated?0
•
• .. .
•
• .. •.
•
®
___ __
----
----
----
----
• n t h I y L ..• i n •
Month12 •. ••
j////j�//////.
111
j/
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1)
Page
Permit No.: W00023310
Facility Name:
Warsaw Sanitation Trailer Wash
County: Duplin
Month:
August
Year:
2016
Field Name:
Zone 1
Field Name:
Zone 2
Field Name:
Zone 3
Field Name:
Zone 4
Did irrigation occur
Area (acres):
0;52
Area (acres):
2.03
Area (acres):
1.6
Area (acres):
2.39
at this facility?
Cover Crop:Fescue
Cover Crop:
P�
Fescue
Cover Cro P�
Fescue
Cover Cro P�
Fescue
DYES ONO
Hourly Rate (in):
0.5
Hourly Rate (in):
0.5
Hourly Rate (in):
0.5
Hourly Rate (in):
0.5
Annual Rate (in):
30
Annual Rate (in):
30
Annual Rate (in):
30
Annual Rate (in):
30
Weather Freeboard
Field Irrigated?
EYES []NO
Field Irrigated?
EYES
ONO
Field Irrigated?
EYES
❑NO
Field Irrigated?
EYES
NO
ce
p
V..
a � C
v w Y m a °'
° co m rn y�
L) o � M
a o
° E 0 >, a
r E Cn M
a. � °
ma v
Em m°f
° a E m
rn
°° F-'�
iQ -
aM E ac
�.c ° c
a E° a
m K o co
o o ,� _ o
J J
my °
Em d°'
° o E
o a a
iQ
rn
�.c
'v
m
o o
J
E Tm
° c
E° a
xom
,� = o
2 J
my o
Em mom;
a Q E �a
o a 1- m
�Q =
rn
�,c
= v
m
o o
J
E �m
°mac
E° -o
x o m
m= o
J
a) "a a
Ed dw
° a E M
o a i= _
� Q
1 c
.-
o o
J
E c
E° v
X°
m= o
2 J
°F in ft ft
gal min
in in
gal min
in
in
gal min
in
in
gal min
in
in
1
PC 88 0.05
2,010 30
0.14 0.14
7,470 30
0.14
0.14
3,810 30
0.09
0.09
5,910 30
0.09
0.09
2
0.9
3
0.05
4
0.9 5.58
-
5
0.2
6
7
8
0.75
9
0.05 5.5
10
11
12
0.5
13
14
15
C 94 5.6
10,720 160
0.76 0.28
39,840 160
0.72
0.27
20,320 160
0.47
0.18
31,520 160
0.49
0.18
16
17
C 93 6.2
14,070 210
1.00 0,28
52,290 210
0.95
0.27
26,670 210
0.61
0.18
41,370 1 210
0.64
0.18
18
19
0.35
20
0.35
21
22
23
24
25
6.2
26
27
28
29
0.6
30
1 1 0.05
31
1 1 1 6.2
Monthly Loading:
12 Month Floating Total (in):
26,800
1.9099,600
15.19
.81
F115.07
50,800
1.17
8:36
78,800
t
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page
WQ0023310
•
.unty: Duplin
Month:August
1
/irrigationoccur
Area (acres):
Area (acres�-
at this facility.?
CroA,-
PIYES FINO
Hourly'.te (in):
Hourly '.te (in):
Hourly '.te (in):
Hourly '.
Annual Rate (in):1Annual
Rate Ciny
Annual Rate (in):
Monthly•.• .
12 Month •.
•11 i////i%.®j//////�j/////
j//////j�i////%�//////�
111
j/////j��j//////.
111
j///�//�j//////
111
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of
Did the application rates exceed the limits in Attachment B of your permit?
Were adequate measures taken to prevent effluent ponding in or runoff from the sites?
Was a suitable vegetative cover maintained on all sites as specified in your permit?
Were all setbacks listed in your permit maintained for every application to each permitted site?
Were all freeboards maintained in accordance with the specified freeboard heights in your permit?
[21compliant []Non-compliant
OCompliant [—]Non-compliant
❑.r Compliant ❑Non -Compliant
[2]Compliant ❑Non -Compliant
❑� Compliant []Non-compliant
If the facility is non-compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Bradley Devane Herring
Permittee:
Murphy Brown LLC
Certification No.: 988691
Signing Official: Gary Richard
Grade: SI Phone Number: (910) 289-7752
Signing Official's Title: Murphy brown East Transportation
Has the ORC changed since the previous NDAR-1? ❑Yes ONO
Phone Number: 910 3434 rmit Exp.: 8/31/19
vt
Signature Date
Signatt4e Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617