Loading...
HomeMy WebLinkAboutAttach. 25, 2013-08-28 Beaver to Bray emailFrom: Ziegler, Ty <Ty.Ziegler@hdrinc.com> Sent: Wednesday, August 28, 2013 9:04 AM To: Wooten, Dale <Dale.Wooten@duke-energy.com>; Beaver, Dean R <Dean.Beaver@duke-energy.com>; Bray, Mike <Mike.Bray@duke-energy.com>; Gardner, Maxie <Maxie.Gardner @ duke-energy.com>; Zalme, Nob J <Nob.Zalme@duke-energy.com>; Brown, David R <David.Brown2@duke- energy.com>; Stowe, Allen <Allen.Stowe@duke-energy.com>, Botkins, Henry A Jr <Henry.Botkins@duke-energy. com> Cc: Leap, Tom Y Jr <Tom.Leap@duke -energy.com>; Zarzar, Issa <Issa.Zarzar@duke- energy.com>; Miller, Michael H <Michael.Miller@duke-energy.com>; Neill, Monte W <Monte.Neill@duke-energy.com>; Cook, Mike M <Mike.Cook@duke-energy.com>; Russell, Tim <Tim.Russell2@duke-energy.com>; Stowe, Steve W <Steve.Stowe@duke- energy.com>; Taylor, Henry <Henry. Taylor@duke-energy. com>; Miller, Bill <Bill. Mill er@hdrinc. com>; Chrisman, Brian <Brian.Chrisman@hdrinc.com>; Johnson, Matthew <Matthew.Johns on @ hdrinc.com> Subject: RE: Lowering Primary Ash Basin All, Thanks for the help in planning and coordinating the partial dewatering of the Primary Ash Basin at Buck. Removing approximately 5 ft of water will greatly aid us in the geotechnical and environmental exploration (drilling). HDR and our drilling sub -contractors (AE Drilling and SAEDACCO) are meeting Dean Beaver on site today to look at access points and will begin the development of a drilling plan. Having the Primary Basin lowered by the end of September should work well with the drilling schedule. Henry previously scheduled a Buck Ash Basin Closure update meeting for today (mid-morning) and I know that many of you were on the invite list. Dewatering activities would be a good agenda item. Thanks again and talk to you soon. Ty TY ZIEGLER, P.E. HDR Engineering, Inc. Environmental & Regulatory Manager, Hydropower Services 440 S Church Street, Suite 1000 1 Charlotte, INC 28202 704.248.3654 1 c: 704.516.2703 ty.ziegler@hdrinc.com I hdrinc.com From: Wooten, Dale [mailto:Dale.Wooten@duke-energy.com] Sent: Wednesday, August 28, 2013 8:29 AM To: Beaver, Dean R; Bray, Mike; Gardner, Maxie; Zalme, Nob J; Ziegler, Ty; Brown, David R; Stowe, Allen; Botkins, Henry A Jr Cc: Leap, Tom Y Jr; Zarzar, Issa; Miller, Michael H; Neill, Monte W; Cook, Mike M; Russell, Tim; Stowe, Steve W Subject: RE: Lowering Primary Ash Basin Allen, You should have been copied on this note as well as Henry. Please advise if you have any problems with the below schedule. Thanks, Duke -SEA -heck -00217766 pale W OtP)r GSP Certified Safety Professional ; Senior EHS Professional Duke Energy; Buck CC / Buck Steam Station 1385 Dukeville Road, Salisbury, NC 28146 2: 704-630-3086 1 W: 704-202-2533 1 C: Dale.Wooten@_duke-energy.com From: Beaver, Dean R Sent: Wednesday, August 28, 2013 7:36 AM To: Bray, Mike; Gardner, Maxie; Zalme, Nob J; 'Ty.Ziegler@hdrinc.com'; Wooten, Dale; Brown, David R Cc: Leap, Tom Y Jr; Zarzar, Issa; Miller, Michael H; Neill, Monte W; Cook, Mike M; Russell, Tim; Stowe, Steve W Subject: RE: Lowering Primary Ash Basin Here is the plan for lowering the basin at Tower #1. We would like to remove the logs first thing each morning after the pre -job brief. David Brown & Dale Wooten will monitor the water discharge at the other each tower and provide guidance on Dewatering Plan. If needed we will modify this schedule to ensure the basins are settled between each lowering. If there are any questions or concerns please let us know before this schedule is started. Friday - 9/13/13 remove stop log to lower basin 9 Inches. Weekend --9/14 and 9/15 settle out ash basin Monday - 9/16/ 13 remove stop log to lower basin 9 Inches. Tuesday — 9/17/13 settle out ash basin Wednesday — 9/18/13 remove stop log to lower basin 9 Inches. Thursday — 9/19/13 settle out ash basin Friday — 9/20/13 remove stop log to lower basin 9 Inches. Weekend 9/21 and 9/22 settle out ash basin Monday 9/23/13 remove stop log to lower basin 9 Inches. Tuesday 9/24/13 settle out ash basin Wednesday 9/25/13 remove stop log to lower basin 9 Inches. Thursday 9/26/13 settle out ash basin Friday 9/27/13 remove stop log to lower basin 9 inches (Total drop of 5 feet 3 inches.) Weekend 9/28 & 9/29 settle out ash basin. ..................................................................................................... ........................................................................................................................................... ............... From: Bray, Mike Sent: Tuesday, August 27, 2013 2:04 PM To: Gardner, Maxie; Zalme, Nob J; 'Ty.Ziegler@hdrinc.com'; Wooten, Dale; Brown, David R Cc: Leap, Tom Y Jr; Zarzar, Issa; Miller, Michael H; Beaver, Dean R; Neill, Monte W; Cook, Mike M; Russell, Tim; Stowe, Steve W Subject: RE: Lowering Primary Ash Basin We will pull a log every other day. So Dean is changing schedule to match 9" every other day. Thanks Mike From: Gardner, Maxie Sent: Tuesday, August 27, 2013 1:43 PM To: Zalme, Nob J; Bray, Mike; 'Ty.Ziegler@hdrinc.com'; Wooten, Dale; Brown, David R Cc: Leap, Tom Y Jr; Zarzar, Issa; Miller, Michael H; Beaver, Dean R; Neill, Monte W; Cook, Mike M; Russell, Tim; Stowe, Steve W Subject: Re: Lowering Primary Ash Basin Afternoon Nob. Me trying to call you. Call me on my cell when you can... From: Zalme, Nob J Sent: Tuesday, August 27, 2013 09:13 AM Duke -SEA -heck -00217767 To: Bray, Mike; Ziegler, Ty <Tv.Ziegler@hdrinc.com>; Wooten, Dale; Brown, David R; Gardner, Maxie Cc: Leap, Tom Y Jr; Zarzar, Issa; Miller, Michael H; Beaver, Dean R; Neill, Monte W; Cook, Mike M; Russell, Tim; Stowe, Steve W Subject: RE: Lowering Primary Ash Basin Fyi...I'm pretty sure the stop -logs in the discharge structures at cell 1 & cell 2 are 9" logs and cell 3 are 6" logs. From: Bray, Mike Sent: Monday, August 26, 2013 4:50 PM To: Ziegler, Ty; Wooten, Dale; Brown, David R; Gardner, Maxie; Zalme, Nob J Cc: Leap, Tom Y Jr; Zarzar, Issa; Miller, Michael H; Beaver, Dean R; Neill, Monte W; Cook, Mike M; Russell, Tim; Stowe, Steve W Subject: Lowering Primary Ash Basin I have talked with Tim Russell and Alan Stowe and we are ok to start lowering the ash basin on 9/13/13. We plan on it taking the ash pond down 1 foot and wait a day between removing stop logs. We will monitor water levels on all three ash basins and look for any changes in the discharge. Dale Wooten and David Brown will be doing in process monitoring during this process. Here is the plan for lowering basin. We would like to remove the logs first think after pre job at the start of the morning shift. If needed we will take whatever time needed to settle the basins between each lowering. Friday - 9/13/13 remove stop logs to lower basin 1 foot. Weekend --9/14 and 9/15 settle out ash basin Monday - 9/16/ 13 remove stop logs to lower basin 1 foot Tuesday — 9/17/13 settle out ash basin Wednesday — 9/18/13 remove stop logs to lower basin Thursday — 9/19/13 settle out ash basin Friday — 9/20/13 remove stop logs to lower basin Weekend 9/21 and 9/22 settle out ash basin Monday 9/23/13 remove stop logs to lower basin Tuesday and Wednesday 9/24 & 9/25 basin to settle at level needed. After basin has been lowered, we will need to see plan telling us how and when you will be doing the drilling inside the primary ash basin. Thanks hhannks p i-I✓NQE1, ('3Y Manager Buck/Dan River Plant Retirement and Demolition Office (336)623-0302 Cell (336) 552-6434 Mike. Bray@duke-energy.com Duke -SEA -heck -00217768