Loading...
HomeMy WebLinkAboutAttach. 24, 2013-08-23 DeNeale to Russell emailFrom: Russell, Tim <Tim.Russell2@duke- energy. com> Sent: Friday, August 23, 2013 2:21 PM To: DeNeale, Sean <Sean.DeNeal@duke-energy.com>; Bray, Mike <Mi ke.B ray@ duke- energy. com> Cc: Beaver, Dean R <Dean.Beaver@duke-energy.com>; Neill, Monte W <Monte.Neill@duke- energy. com>; Wooten, Dale <Dale.Wooten@duke- energy.com>, Stowe, Allen <Al I en. Stowe@, duke- energy. com> Subject: RE: Buck dewatering 1 -foot per day is Duke's maximum rate to lower pool levels for stability purposes. TSS may dictate you lower the level as a slower rate. Tim Russell, P.E. Geotechnical Leader Central Engineering & Services Duke Energy (704) 382-4945 - Office (704) 962-0072 - Mobile From: DeNeale, Sean Sent: Friday, August 23, 2013 2:18 PM To: Russell, Tim; Bray, Mike Cc: Beaver, Dean R; Neill, Monte W; Wooten, Dale; Stowe, Allen Subject: RE: Buck dewatering Mike, I'm not sure if you meant to say 1 foot per day...this seems like a very accelerated rate, as I've generally heard we want to stick to around 1 foot per week. Tim, what are your thoughts about the rate at which we can drop basin levels? From: Bray, Mike Sent: Friday, August 23, 2013 1:39 PM To: Beaver, Dean R; Neill, Monte W Cc: DeNeale, Sean; Wooten, Dale; Stowe, Allen Subject: FW: Buck dewatering Can we come up with a Plan dropping the #1 Ash Basin 1 foot per day. Talk to Opie, Shawn DeNeale and Allen Stowe about doing this. We must get approval before we change anything. This was the way we did DR but a couple of days we level in secondary pond was high so we waited. Thanks Mike From: Leap, Tom Y Jr Sent: Friday, August 23, 2013 1:31 PM To: Bray, Mike Subject: FW: Buck dewatering Duke -SEA -heck -00286947 From: Ziegler, Ty [mailto:Ty.Ziegler@hdrinc.com] Sent: Friday, August 23, 2013 1:15 PM To: Leap, Tom Y Jr Cc: Taylor, Henry Subject: Buck dewatering Tom, I asked Henry yesterday about the communication process for requesting a partial dewatering of the Buck New Primary Ash Basin. Henry suggested that I start with you. We'd like to lower the water surface elevation in the New Primary basin by approximately 5 ft to facilitate geotechnical and environmental drilling. We need to start soon as my understanding is the general drawdown protocol is a maximum of approximately 1 ft per week. At this time, our recommendation would be to not increase the pond level — once lowered, but understand that will be a separate decision. At this time, we are not requesting drawdown of the Old Primary or Secondary cells. I also assume that we will need to notify/coordinate with Sean DeNeale (environmental) and Allen Stowe (NPDES compliance). Who at the station do we need to work with? Thanks for any guidance. Ty TY ZIEGLER, P.E. HDR Engineering, Inc. Environmental & Regulatory Manager, Hydropower Services 440 S Church Street, Suite 1000 1 Charlotte, NC 28202 704.248.3654 1 c: 704.516.2703 ty.ziegler@hdrinc.com I hdrinc.com Duke -SEA -heck -00286948